Search NASA⌕ Search

SEARCH · Search NASA

Results for “SALT WASTE PROCESSING FACILITY (SWPF)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of potential causes of production limiting fouling within SWPF due to mercury solids formation during pH swings within the SWPF process

The Salt Waste Processing Facility (SWPF) goal to investigate the use a high sodium Salt Batch 5 Qualification sample as the radioactive salt solution for mixing tests meant to evaluate the propensity for solids formation between the 5.6 M sodium clarified salt solution (CSS) and scrub solutions (0.05 M HNO 3 and 0.025 M NaOH solutions) during pH changes has been completed at SRNL. The key results and conclusions from this investigation to evaluate the propensity for solids formation between CSS and scrub solutions because of pH fluctuations include the following: None of the 8 test matrices, involving the mixing/titrating of scrub solution with CSS and vice versa, showed any visible evidence for the formation of solids with pH changes. The average turbidity measurements for these 8 tests, excluding test 7, was 21.6 ± 0.4 NTU. This average turbidity value is within 2 sigma of the baseline turbidity value of 20.5 NTU for the CSS only without added scrub solutions. However, only in test 7, which involved the titrating of CSS into dilute nitric acid scrub solution (0.05 M HNO 3 solution), was a small measurable change in the turbidity of the mixture observed at 31.9 ºC. On the other hand, the equivalent test (instantaneous addition of CSS into 0.05 M HNO 3 ) gave an average turbidity measurement value of 21.6 ± 0.6 NTU at a temperature of 24.0 ºC. This difference in turbidity measurement has been attributed to either instrument performance errors or the effect of temperature. It is recommended that these CSS and scrub solution mixing tests be performed with corresponding simulant solutions in a non-radioactive environment. A simulant environment will aid in the full integration of a pH and turbidity meter equipment with the experimental set up. A new detection method, preferable a laser-based method, may be needed in detecting and confirming the precipitation of fine particulates at the right blending times and pH fluctuations in the solution mixtures. On the other hand, the differing free OH concentrations (~2 M in CSS), H + concentrations (0.05 M HNO 3 ) for the titrants and the bulk solutions, may make it almost impossible to observe a neutral pH or a pH in the range of 7-9, where the potential for solids formation is maximized and leads to possible precipitation of minerals like aluminum hydroxides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Determination Equivalency - 12172

The Savannah River Site (SRS) is a Department of Energy (DOE) facility encompassing approximately 800 square kilometers near Aiken, South Carolina which began operations in the 1950's with the mission to produce nuclear materials. The SRS contains fifty-one tanks (2 stabilized, 49 yet to be closed) distributed between two liquid radioactive waste storage facilities at SRS containing carbon steel underground tanks with storage capacities ranging from 2,800,000 to 4,900,000 liters. Treatment of the liquid waste from these tanks is essential both to closing older tanks and to maintaining space needed to treat the waste that is eventually vitrified or disposed of onsite. Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005 (NDAA) provides the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), a methodology to determine that certain waste resulting from prior reprocessing of spent nuclear fuel are not high-level radioactive waste if it can be demonstrated that the waste meets the criteria set forth in Section 3116(a) of the NDAA. The Secretary of Energy, in consultation with the NRC, signed a determination in January 2006, pursuant to Section 3116(a) of the NDAA, for salt waste disposal at the SRS Saltstone Disposal Facility. This determination is based, in part, on the Basis for Section 3116 Determination for Salt Waste Disposal at the Savannah River Site and supporting references, a document that describes the planned methods of liquid waste treatment and the resulting waste streams. The document provides descriptions of the proposed methods for processing salt waste, dividing them into 'Interim Salt Processing' and later processing through the Salt Waste Processing Facility (SWPF). Interim Salt Processing is separated into Deliquification, Dissolution, and Adjustment (DDA) and Actinide Removal Process/Caustic Side Solvent Extraction Unit (ARP/MCU). The Waste Determination was signed by the Secretary of Energy in January of 2006 based on proposed processing techniques with the expectation that it could be revised as new processing capabilities became viable. Once signed, however, it became evident that any changes would require lengthy review and another determination signed by the Secretary of Energy. With the maturation of additional salt removal technologies and the extension of the SWPF start-up date, it becomes necessary to define 'equivalency' to the processes laid out in the original determination. For the purposes of SRS, any waste not processed through Interim Salt Processing must be processed through SWPF or an equivalent process, and therefore a clear statement of the requirements for a process to be equivalent to SWPF becomes necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2024 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2024 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained.1 The April 2024 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2024 (1QFY2024) and the Second Quarter Fiscal Year 2024 (2QFY2024). The following facts pertaining to the WAC are drawn from the analytical results provided in this report. WAC TARGETS and LIMITS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC TARGETS and LIMITS. Nitrosamines were not detected in the SWPF DSS salt solution sample above the instrument detection limits of <1 mg/L. The minimum detection limit (<3.33E-01 pCi/mL) is reported for 94 Nb as determined from the minimum detectable activity associated with the radiochemical method used for this radionuclide. The reported detection limit is above the requested SRMC target minimum detection limit concentration. However, the minimum detection limit reported for the April 2024 semiannual SWPF DSS sample for 94 Nb is lower than the estimated detection limit of 4.38E-01 pCi/mL initially established by SRNL in 2009. Thus, per guidance from SRMC, 2 SRNL continues to achieve as low as practical detection limits for this radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PERFORMANCE PROPERTIES OF SALTSTONE PRODUCED USING SWPF SIMULANTS

The overwhelming majority of waste to be immobilized at the Saltstone Production Facility will come from the waste stream exiting the Salt Waste Processing Facility (SWPF). These SWPF batches are salt solutions that result from pretreatment of the High Level Waste (HLW) supernate by an Actinide Removal Process followed by Caustic Side Solvent Extraction. The concentration of aluminate within these streams will vary and be determined by (1) the concentration in the incoming salt waste stream, (2) the degree of aluminum leaching from the HLW, (3) the method for introducing the aluminate into the waste stream (continuous or batch) and (4) and any operational or regulatory limitations. The overall Performance Assessment outcome for the Saltstone Disposal Facility will depend significantly on the performance properties of the SWPF Saltstone grouts. This report identifies and quantifies, when possible, those factors that drive the performance properties of the projected SWPF grouts. Previous work has identified aluminate concentration in the salt waste stream as a key factor in determining performance. Consequently, significant variation in the aluminate concentration to a maximum level of 0.65 M was investigated in this report. The SWPF baseline grout is a mix with a 0.60 water to cementitious ratio and a premix composition of 45 wt % slag, 45 wt % fly ash and 10 wt % portland cement. The key factors that drive performance of the SWPF mixes were determined to be (1) the time/temperature profile for curing, (2) water to cementitious materials ratio, (3) aluminate concentration in the waste stream, and (4) wt % slag in the premix. An increase in the curing temperature for mixes with 45 wt % slag resulted in a 2.5 times decrease in Young's modulus. The reduction of Young's modulus measured at 60 C versus 22 C was mitigated by an increase in the aluminate concentration but was still significant. For mixes containing 60 wt % slag, the reduction in Young's modulus between these two curing temperatures was significantly lessened. The importance of curing conditions can not be overemphasized. The gain realized in performance by, e.g., a higher level of aluminate or wt % slag or a reduction in w/cm ratio, can be offset by the effects of a higher curing temperature. In fact, the final performance properties of a mix cured at 60 C can be lower than the initial values before any of the performance enhancing changes are introduced. Control of the time/temperature curing profile can be managed by pour schedules and other temperature control measures. The reduction in performance at higher curing temperatures is consistent with results obtained in a separate study. Although preliminary, results from this task on the measurement of hydraulic conductivity at MACTEC showed that curing of a Saltstone mix at 60 C increased the hydraulic conductivity by several orders of magnitude. The permeability data are based on only one mix but, were consistent with a measured reduction in Young's modulus for these same samples. Therefore, it is recommended that impact of curing temperature on performance properties be further investigated. An increase in dynamic Young's modulus (indicator of performance) is observed as the water to cementitious materials (w/cm) ratio decreases. The w/cm ratio is a process parameter which can be adjusted to improve performance as long as the processing properties of the grout are still within an operational window that will lead to successful placement. The same conclusions apply to wt % slag in the premix. That is, an increase in the wt % slag at the expense of fly ash in the premix increases Young's modulus and performance. An increase in wt % slag (as with a decrease in w/cm ratio) increases viscosity and yield stress and a final mix design must be balanced such that acceptable processing properties are obtained. The performance properties of SWPF mixes show a non-linear dependence on aluminate concentration. As the aluminate concentration is increased from 0.1 M to 0.25 M, the Young's modulus and compressive strength increase and the porosity is reduced. Consistent with this improvement in performance is an increase in the heat of hydration, reflective of an increase in the degree of hydration. Higher degrees of hydration in mixes generally lead to better performance. In the region of 0.25 to 0.45 M aluminate, very little additional change is observed in any of the properties. A further increase in the aluminate concentration from 0.45 M to 0.65 M leads to a slight reduction in Young's modulus. It was observed however, that the values of Young's modulus for samples cured at 22 C decreased after approximately 50 days. This was the first time a reduction in Young's modulus was observed as a function of time and is most likely correlated with the high levels of aluminate present in these mixes. This reduction can be accounted for by cracking of the Saltstone samples with time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF THE SMALL COLUMN ION EXCHANGE PROCESS ON THE DEFENSE WASTE PROCESSING FACILITY - 12112

The Savannah River Site (SRS) is investigating the deployment of a parallel technology to the Salt Waste Processing Facility (SWPF, presently under construction) to accelerate high activity salt waste processing. The proposed technology combines large waste tank strikes of monosodium titanate (MST) to sorb strontium and actinides with two ion exchange columns packed with crystalline silicotitanate (CST) resin to sorb cesium. The new process was designated Small Column Ion Exchange (SCIX), since the ion exchange columns were sized to fit within a waste storage tank riser. Loaded resins are to be combined with high activity sludge waste and fed to the Defense Waste Processing Facility (DWPF) for incorporation into the current glass waste form. Decontaminated salt solution produced by SCIX will be fed to the SRS Saltstone Facility for on-site immobilization as a grout waste form. Determining the potential impact of SCIX resins on DWPF processing was the basis for this study. Accelerated salt waste treatment is projected to produce a significant savings in the overall life cycle cost of waste treatment at SRS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PRELIMINARY EVALUATION OF DWPF IMPACTS OF BORIC ACID USE IN CESIUM STRIP FOR SWPF AND MCU

A new solvent system is being evaluated for use in the Modular Caustic-Side Solvent Extraction Unit (MCU) and in the Salt Waste Processing Facility (SWPF). The new system includes the option to replace the current dilute nitric acid strip solution with boric acid. To support this effort, the impact of using 0.01M, 0.1M, 0.25M and 0.5M boric acid in place of 0.001M nitric acid was evaluated for impacts on the DWPF facility. The evaluation only covered the impacts of boric acid in the strip effluent and does not address the other changes in solvents (i.e., the new extractant, called MaxCalix, or the new suppressor, guanidine). Boric acid additions may lead to increased hydrogen generation during the SRAT and SME cycles as well as change the rheological properties of the feed. The boron in the strip effluent will impact glass composition and could require each SME batch to be trimmed with boric acid to account for any changes in the boron from strip effluent additions. Addition of boron with the strip effluent will require changes in the frit composition and could lead to changes in melt behavior. The severity of the impacts from the boric acid additions is dependent on the amount of boric acid added by the strip effluent. The use of 0.1M or higher concentrations of boric acid in the strip effluent was found to significantly impact DWPF operations while the impact of 0.01M boric acid is expected to be relatively minor. Experimental testing is required to resolve the issues identified during the preliminary evaluation. The issues to be addressed by the testing are: (1) Impact on SRAT acid addition and hydrogen generation; (2) Impact on melter feed rheology; (3) Impact on glass composition control; (4) Impact on frit production; and (5) Impact on melter offgas. A new solvent system is being evaluated for use in the Modular Caustic-Side Solvent Extraction Unit (MCU) and in the Salt Waste Processing Facility (SWPF). The new system includes the option to replace the current dilute nitric acid strip solution with boric acid. To support this effort, the impact of using 0.01M, 0.1M, 0.25M and 0.5M boric acid in place of 0.001M nitric acid was evaluated for impacts on the DWPF facility. The evaluation only covered the impacts of boric acid in the strip effluent and does not address the other changes in solvents (i.e., the new extractant, called MaxCalix, or the new suppressor, guanidine). Experimental testing with the improved solvent is required to determine the impact of any changes in the entrained solvent on DWPF processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Density of Next-Generation Caustic-Side Solvent Extraction Solvent

This report recommends the appropriate modifier concentration to employ in the Next Generation Solvent (NGS) to be used in the Salt Waste Processing Facility (SWPF) at the Savannah River Site for removal of cesium from legacy tank waste. The Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process employing the NGS is a marked improvement over the original Caustic-Side Solvent Extraction (CSSX) process, as it provides more effective removal of cesium from highly alkaline radioactive wastes and concentrates this removed cesium into an aqueous solution that is easy to vitrify for final disposal. Considerable effort has been devoted to optimizing the chemistry and process conditions of both systems, and their effectiveness has been demonstrated at the pilot scale at the Modular CSSX Unit (MCU). Due to the success of the demonstration and pilot-scale tests, the Salt Waste Processing Facility (SWPF) has been built to process larger volumes of waste with the CSSX process. To accelerate the waste-processing rate of the SWPF beyond its design throughput, plans call for the replacement of the CSSX process by the NG-CSSX process. To implement the NG-CSSX process in equipment optimized for CSSX, adjusting the density of the NGS to match the CSSX solvent density of 0.851 ± 0.0008 g/mL is considered advisable to obtain comparable hydraulic performance. Toward this objective, the density of the NGS has been measured at different temperatures and modifier concentrations to determine that a concentration of 0.650 M Cs-7SB modifier provides the best match for the desired density.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, Scrub, and Strip Test Results for the Second Solvent Lot Qualification Sample for the Salt Waste Processing Facility

An Extraction, Scrub, and Strip (ESS) test was performed on the qualification sample from the second lot of Caustic-Side Solvent Extraction (CSSX) solvent for the Salt Waste Processing Facility (SWPF). Testing used simulated salt solution to determine cesium distribution ratios (D( Cs )), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams. This data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D( Cs ) measured 14.4, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Salt Waste Processing at the Savannah River Site - 17413

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site (SRS) Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high-curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are underway throughout the existing LW facilities to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗