Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Large eddy simulations of offshore wind turbine wakes for two floating platform types

The growing prospect for large farms of floating offshore wind turbines requires a better understanding of wake effects for floating turbines. In this work, large eddy simulations with an actuator line model are used to study the wake of the NREL 5 MW reference turbine mounted on the OC3-UMaine spar and OC4-DeepCwind semi-submersible platforms. The simulations are carried out in the Simulator fOr Wind Farm Applications (SOWFA) coupled with OpenFAST for the platform and turbine motion. The wake location, deficit, and turbulence levels are compared for the two floating platforms and equivalent fixed-turbine cases. The effects of neutral versus stable atmospheric conditions are also compared. Most notably, floating-turbine wakes are deflected upwards compared to fixed-turbine wakes, because of mean platform pitch. The spar wake deflects upwards more than the semi-submersible, while the stable atmosphere increases this vertical deflection compared to the neutral. The time-varying rotor motions do not significantly affect the mid-to-far wake, though the stable atmosphere shows larger fixed-floating differences in horizontal wake fluctuations.

17 WIND ENERGY↗

Investigating the Impact of Power-Take-Off System Parameters and Control Law on a Rotational Wave Energy Converter’s Peak-to-Average Power Ratio Reduction

Due to the irregular nature of real waves, the power captured in a wave energy converter (WEC) system is highly variable. This is an important barrier to the effective use of WECs. To address this challenge, this study focuses on a rotational WEC power-take-off system in which high-speed and high-efficiency generators along with a torque/power smoothing inertia element can be effectively utilized. In the first phase of this study, the U.S. Department of Energy’s reference model 3 (WEC-Sim RM3; two-body point absorber), along with a slider-crank WEC, were integrated for linear to rotational conversion. Relative motion between the float and spar in RM3 was the driving force for this slider-crank WEC, which is connected to a motor/generator set through a gearbox. RM3 geometry was scaled down by 25 times to work within the limits of the physical motor/generator set used in the experimentation. Once the integration in a hardware-in-the-loop simulation environment was successfully completed, data on the peak-to-average power ratio was collected for various wave conditions including regular and irregular waves. The control algorithm designed to keep the system in resonance with waves was able to maintain relatively high speed depending on the specific gear ratio and wave period. Initial results with hardware-in-the-loop simulations reveal that gear ratio and crank radius have a strong impact on the peak-to-average power ratio. In addition, it was found that output power from the generator was maximized at a larger gear ratio, as the crank radius was increased.

50 EE - Wind and Water Power Program - Water (EE-4↗

5.5 Hybrid Additively Manufactured Tooling for Large Composite Structures

This program sought to lower tooling costs for tightly toleranced, large composite aerostructures by using large format additive manufacturing (LFAM). LFAM tooling has the potential to lower tooling costs, but the large and unpredictable thermal expansion of polymer-based tooling did not previously allow for the production of large structures made with high performance resins requiring 350 deg F cures. Geometric tolerance issues and demolding concerns continued to arise. The proposed approach for this work was to print a thin shell via additive manufacturing that would be used as a scaffold for a conventional tooling prepreg. The prepreg would be laminated and cured onto both sides of the shell, creating a tool with a sandwich construction. The cured prepreg would then be machined and serve as the tooling surface. In addition to providing a clean, pit-free surface, the prepreg stiffness and low thermal expansion would physically restrain the AM shell and prevent it from expanding during thermal cycling, thus preventing any geometric mismatch between the nominal and actual part dimensions. A stair-step approach was taken to prove out this approach. Coupon level testing was done to ensure a good bond was possible between the AM shell and the tooling prepreg. These samples were also used to determine the amount of prepreg needed to achieve the desired coefficient of thermal expansion (CTE). The project team than progressed to a subscale tool measuring two feet in length. The geometry used was a C-section spar from Airbus’ Wing of Tomorrow program. A hybrid tool, using the AM shell and tooling prepreg, was made, and a composite part was fabricated with the tool. Dimensional scans of the tool and part indicated that the desired CTE was achieved with the tool. A second tooling approach was taken to reduce risk. In this approach, a subscale tool of the same geometry as previously mentioned was created, but the tool was entirely constructed of the tooling prepreg. AM was used to print a “master” that was then used to fabricate the tool by creating a splash off of the master using tooling prepreg. The innovation was that the master was not machined, but rather, was used right off the printer after a small amount of surface preparation. Removing this machining step was thought to make this approach economically viable when compared to conventional master fabrication. As before, the tool was used to fabricate a part and tested for dimensional accuracy. For the conclusion of the program, a ten-foot tool was created using the hybrid tool approach. The geometry also came from the Airbus C-section spar previously mentioned. Some difficulty arose in accurately predicting the geometry of the tool after laminating the tooling prepreg, resulting in multiple material additions and a tool geometry change. A part was fabricated in an autoclave using the tool. A cost savings of almost 50% was achieved on the subscale tool in both the hybrid and master-style tool, but the savings dropped considerably as the tool length increased in the full-scale tool. Given the less than expected cost savings and added complexity of the tool construction, it is suggested that the master-style tool is best for immediate commercialization for larger tools (although it may be appropriate for smaller, table-top size tools). Since its construction is very similar to conventionally made composite tooling, there already exists a broad supply chain for building the tool, and project partner Additive Engineering Solutions (AES) is well acquainted with the design and build of the AM master needed.

36 MATERIALS SCIENCE↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Definition of the Stiesdal Offshore TetraSpar Floating Wind System for OC6 Phase IV

The Offshore Code Comparison Collaboration, Continued, with Correlation, and unCertainty (OC6) is an international project focused on verifying and validating modeling tools used in the analysis of floating offshore wind systems. The fourth phase of the project aims to assess the ability of the tools to model a novel floating wind design. The TetraSpar was designed by Stiesdal Offshore Technologies and was selected as the subject platform for the project. The platform is a unique design that features spar-like stability with a very low center of gravity, but does not require rare deep-water ports. This combination is achieved with a system made of two separate steel structures, a hull at the water's surface that supports the wind turbine tower, and a keel that is suspended below the main body. This lower keel has a very high density and drives the total platform's low center of gravity. The TetraSpar, with hull and keel, spar-type stability, and relatively slender components, is unique compared to platforms studied in earlier phases of OC3-OC6 projects, and it offers an opportunity to evaluate the applicability of modeling tools to a novel design, especially unique hydrodynamics and compliant cables. Scaled model tests of the TetraSpar design were performed in 2018-2019 by the University of Maine. The data collected in the model tests provides a detailed description of the response of the platform in various controlled and relatively well understood conditions. Comparison with this data provides a good opportunity for validation of numerical models. The OC6 Phase IV work focuses on the specific parameters used in these scaled model tests. Descriptions of the platform and the test campaign in this document are based on the report written by Allen and Fowler of the University of Maine in 2019.

17 WIND ENERGY↗

System Study: Residual Heat Removal 1998-2022

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RHR results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998-2022

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant increasing trends were identified in both the HPCS system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2022

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the RCIC system start-only unreliability and 8-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Reactor Core Isolation Cooling 1998-2024

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RCIC results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Residual Heat Removal 1998-2024

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant and highly statistically significant decreasing trends were observed for RHR low-pressure injection mode start-only unreliability and RHR low-pressure injection model 24-hour unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗