Search NASA⌕ Search

SEARCH · Search NASA

Results for “Safety Controls”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Review of the Literature on the Radiolytic Stability of the Next-Generation Solvent

The Original Caustic-Side Solvent Extraction (CSSX) solvent (based on the BOBCalixC6 extractant) currently in use at the Salt Waste Processing Facility (SWPF) is set to be replaced by the Next-Generation Solvent (NGS, based on the MaxCalix extractant). Current SWPF flammability safety controls use G-values for volatile gases obtained from radiolysis studies with the Original CSSX solvent. A review of past irradiation tests of both solvent systems was performed to assess the radiolytic stability of NGS with respect to flammable gas generation from radiolysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Tank Mapping Method Improves Waste Removal Process

Savannah River Mission Completion is the Liquid Waste (LW) contractor at the Savannah River Site (SRS). The LW mission is tasked with treating and disposing of legacy nuclear waste. There are multiple facilities involved in this work, including the Concentration, Storage, and Transfer Facilities (CSTF), the Defense Waste Processing Facility (DWPF), the Salt Waste Processing Facility (SWPF), and the Saltstone Production Facility (SPF). The CSTF includes 43 underground waste tanks used to store and support processing of radioactive liquid waste. Waste removal activities, such as salt dissolution campaigns and sludge agitation, are conducted within the CSTF waste tanks to convert the waste into a form that allows for downstream processing at other LW facilities. While performing these waste removal campaigns, camera inspections are performed to assess the quantity and distribution of the remaining waste within the waste tank (i.e. saltcake or sludge). Understanding the quantity and distribution of the salt/sludge within the waste tanks allows for improved waste removal strategies (e.g. mixing pump operation) and refined safety controls. Typically, several camera inspections are performed during a waste removal transfer to verify the elevation of the visible salt/sludge mounds against the known elevation of the liquid surface. The camera inspection footage must then be interpreted by a trained engineer who will develop a 2-D map that depicts the waste distribution at various elevations within the waste tank. This tank mapping is then used in conjunction with conservative assumptions to evaluate the volume of saltcake or sludge that is present within the waste tank.

Mini, Melany↗

New Tank Mapping Method Improves Waste Removal Process

Waste Tank Mapping Overview • Camera inspections are performed within available tank top risers and used to create waste tank maps – Several camera inspections are performed during waste removal transfers to verify the elevation of the visible salt/sludge mounds against the known elevation of the liquid surface • Tank mappings are used to evaluate the volume and distribution of saltcake or sludge that is present within the waste tank – Allows for refined operating strategies and process safety controls • New tank mapping process creates a standardized approach for accurately defining waste distribution within a waste tank while minimizing the required camera inspection footage – First utilized during the 2023 Tank 22 Sludge Removal Campaign

Mini, Melany [Savannah River Mission Completion (S↗

Ray-Tracing Simulations Characterizing the Performance of the Proposed 2028 HFIR HB4 Main Shutter

The Main Shutter at HB4 will serve two purposes after the HFIR Beryllium Reflector Replacement, planned to take place in 2028. First as the primary certified safety control permitting the passage of neutrons from the cold source in the HFIR pressure vessel into the cold guide hall, and second as the first set of reflecting surfaces used to guide neutrons from the source and into the individual guide starts for each instrument in the cold guide hall. This report outlines a the simulations and analyses used to conclude that the HB4 Main Shutter Insert alignment is critical to associated instrument performance. In general, the alignment of these surfaces to within +/-0.25 millimeters and +/-0.05° across all dimensions will ensure losses are no worse than 1% for any of the guide starts.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hybrid model predictive control techniques for safety factor profile and stored energy regulation while incorporating NBI constraints

Abstract A novel hybrid Model Predictive Control (MPC) algorithm has been designed for simultaneous safety factor ( q ) profile and stored energy ( w ) control while incorporating the pulse-width-modulation constraints associated with the neutral beam injection (NBI) system. Regulation of the q -profile has been extensively shown to be a key factor for improved confinement as well as non-inductive sustainment of the plasma current. Simultaneous control of w is necessary to prevent the triggering of pressure-driven magnetohydrodynamic instabilities as the controller shapes the q profile. Conventional MPC schemes proposed for q -profile control have considered the NBI powers as continuous-time signals, ignoring the discrete-time nature of these actuators and leading in some cases to performance loss. The hybrid MPC scheme in this work has the capability of incorporating the discrete-time actuator dynamics as additional constraints. In nonlinear simulations, the proposed hybrid MPC scheme demonstrates improved q -profile+ w control performance for NSTX-U operating scenarios.

Physics↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a marketplace that does not reward carbon-free baseload capacity. These circumstances, along with increasingly antiquated labor-centric operating models and analog technology, have forced the premature closure of multiple nuclear facilities and placed a much larger population of nuclear power stations at risk. Nuclear plant economic survival in current and forecasted market conditions requires an efficient and technology-centric operating model that harvests the native efficiencies of advanced technology. This is analogous to transformations in nearly every other industry. In light of previous industry experience in modernizing safety Instrumentation and Controls (I&C) systems, nuclear utilities are reluctant to pursue these upgrades due to uncertainty in licensing and cost.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Systems Engineering Analysis of National Ignition Facility Industrial Controls Systems and Safety Interlock Systems Remote Input/Output Networking Migration from ControlNet to EtherNet/IP

The ControlNet industrial communications protocol and modules used in the Industrial Control System (ICS) and Safety Interlock System (SIS) at the National Ignition Facility (NIF) are no longer necessary and the ICS and SIS would be better served by migrating the communications structure to use EtherNet/Industrial Protocol (IP) and EtherNet bridge modules instead. By the admission of the vendor of ControlNet hardware, Rockwell Automation, in literature by Bill Petro [1], “Moving forward, customers will be able to optimize their asset utilization better using EtherNet/IP protocol than with ControlNet.” The NIF is one of the key elements of the Inertial Confinement Fusion (ICF) program at Lawrence Livermore National Laboratory (LLNL), a federally funded research and development center (FFRDC). The NIF contains the systems and provides the operational capacity to perform ICF, high energy density (HED), and discovery science experiments utilizing 192 individual beamlines, a host of diagnostics, and all the industrial systems required to facilitate these beamlines and diagnostics. The industrial systems are governed by the ICS and SIS, with the ICS providing control and the SIS providing monitoring and permissives. Construction on the NIF began in 1997 and was certified complete in 2009 and, as a result, the ICS and SIS were developed during this time using the tools that were available then. This includes the communications structure and protocols for these systems, much of which was, and still is, ControlNet. ControlNet, particularly during the time that the ICS and SIS were being built, has several attractive features. ControlNet hardware is exclusive to Rockwell Automation, which was the automation hardware chosen for the ICS and SIS. One feature that could be considered an advantage or a disadvantage depending on the communication needs of the system is that ControlNet also utilizes no active network components, excluding repeaters which are not always necessary. According to the architect of the ICS system at the NIF, Gordon Lau, one of the most attractive features of the ControlNet protocol during development of the ICS and SIS was that it is deterministic, providing timing of data transfer that is executed exactly as it is defined by the developer.

42 ENGINEERING↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

This LWRS research seeks to assist in breaking the impasse which has precluded digital safety system upgrades by generating and demonstrating a process and related business case tool to enable a Business Case Analysis (BCA). The purpose of a BCA is to show such upgrades can be economically justified. This BCA methodology first systematically establishes a forecast of expected lifecycle costs for I&C identified for upgrade by: • Definitively bounding the scope of current I&C systems envisioned for upgrade. • Collecting historical labor and material usage data that bound cost contributors related to the systems to be upgraded. • Synthesizing and analyzing the data to establish lifecycle cost forecasts for the current systems. In collaboration with engineers familiar with the attributes of the digital equipment to be used in the upgrade and how it is envisioned to be applied, cost savings categories and expected savings in those categories are then identified and applied using the analysis tools developed for this purpose. The result is an estimate NPV of savings enabled by the upgrade. This includes both direct cost savings (e.g., surveillance labor costs) as well as cost avoidance items (e.g., inventory carrying costs). Finally, when utility-provided digital upgrade costs estimates are included, the resultant BCA provides an NPV for the upgrade project. Development of a useful BCA methodology requires a real-world basis. With the cooperation of Exelon Generation (“Owner”), an Exelon-owned 2-Unit BWR Station (“Station”) was used as the foundation for this research. Exelon is pursuing a digital upgrade of current, first-echelon, safety-related I&C systems at these units, including the following: • Reactor Protection System (RPS) • Nuclear Steam Supply Shutoff System (N4S) • Emergency Core Cooling Systems (ECCS) • Anticipated Transient Without Scram (ATWS) Mitigation System

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nonlinear control of the minimum safety factor in tokamaks by optimal allocation of spatially moving electron cyclotron current drive

The minimum value of the safety factor profile is related to the magnetohydrodynamic (MHD) stability of the plasma confined in a tokamak. Therefore, active control of the minimum safety factor may mitigate MHD instabilities that can degrade or even terminate plasma confinement. Typically, in most tokamak scenarios, the minimum safety factor evolves spatially with time, i.e., the location at which the safety factor achieves the minimum value changes with time. In addition to the inherent nonlinearities in the minimum safety factor evolution, its spatial variation makes the control design challenging. In particular, complexity in control design may arise from the need for time-dependent nonlinear models that account for spatial variation of the minimum safety factor. Furthermore, the minimum safety factor may drift to locations where the actuator authority is low. The problem of minimum safety factor control with target location tracking and moving electron cyclotron current drive (ECCD) is addressed in this work. A nonlinear time-dependent model that incorporates the spatial variation of the minimum safety factor is presented. A nonlinear controller based on optimal feedback linearization is developed to track a target minimum safety factor. The proposed controller treats the ECCD position as a controllable variable. In other words, the controller prescribes the ECCD position (in addition to the non-inductive powers) in real time based on an optimal criterion that is defined a priori. This work also presents the steps necessary to integrate the minimum safety factor controller with a total energy controller to achieve multiple control objectives simultaneously. In conclusion, the proposed integrated control algorithm is tested using nonlinear simulations in the Control Oriented Transport SIMulator (COTSIM) for a DIII-D tokamak scenario.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Distributed Transient Safety Verification via Robust Control Invariant Sets: A Microgrid Application

Modern safety-critical energy infrastructures are increasingly operated in a hierarchical and modular control framework which allows for limited data exchange between the modules. In this context, it is important for each module to synthesize and communicate constraints on the values of exchanged information in order to assure system-wide safety. To ensure transient safety in inverter-based microgrids, we develop a set invariance-based distributed safety verification algorithm for each inverter module. Applying Nagumo's invariance condition, we construct a robust polynomial optimization problem to jointly search for safety-admissible set of control set-points and design parameters, under allowable disturbances from neighbors. We use sum-of-squares (SOS) programming to solve the verification problem and we perform numerical simulations using grid-forming inverters to illustrate the algorithm.

Bouvier, Jean-Baptiste H.↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Limerick Safety-Related Instrumentation and Control Upgrade Human Factors Engineering Preliminary Validation Report

This document is a results summary report for the human factors engineering (HFE) preliminary validation (PV) performed for the Limerick Generating Station (LGS) Safety-Related (SR) Instrumentation and Control (I&C) Upgrade Project at the Idaho National Laboratory (INL) Human Systems Simulation Laboratory (HSSL). This occurred during the week of February 20, 2023.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Overview of the MCNP6® SQA Plan and Requirements [Memorandum]

For all X Computational Physics Division (XCP) software under the Associate Laboratory Directorate for Weapons Physics (ALDX), the Weapons Research Services Secure Networks and Assurance Group (WRS-SNA) manages the software quality assurance (SQA) plan, requirements and guidance with respect to development processes and tools to meet the broader LANL SQA requirements. Each XCP software product is categorized into one of three software types: Safety Software, Non-Safety Risk Significant Software, and Non-Safety Commercially Controlled Software. In 2018, using LANL Form 2033, the MCNP6 code was categorized by the XCP division as Non-Safety Commercially Controlled Software, provided in Appendix A. Using WRSFORM- 0001U, the MCNP6 code was graded as a Medium Impact software product, provided in Appendix B. Given these determinations, the WRS-AD-0010U SQA plan is followed for all MCNP6 developments, documentation and code releases.

97 MATHEMATICS AND COMPUTING↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Simultaneous control of the electron temperature and safety factor profiles in DIII-D using model-based optimal control techniques

Future tokamak power plants will likely operate using a single, well-defined plasma scenario, either in steady state or for very long pulse lengths. In order to enhance the robustness of the scenario, feedback controllers for a variety of plasma properties will be necessary to counteract any disturbances and ensure safe operation. However, only a limited set of actuators will be available to control many different quantities. Because of this, it is necessary to develop controllers that are able to regulate multiple plasma properties using a limited set of actuators. To this end, a controller has been developed for the simultaneous regulation of both the electron temperature and safety factor profiles in DIII-D. This algorithm uses a linear quadratic integral control synthesis approach based on a linearized model of the dynamics of the two profiles. Two neural network surrogate models, NubeamNet and MMMnet, are included to improve the fidelity of the model. Furthermore, the controller has been tested in simulation using COTSIM, and has demonstrated the ability to simultaneously track changes in both the electron temperature and safety factor targets, including changes in both the magnitude and the shape of the profiles.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗