Reconfirmation of frit 803 based on the January 2016 sludge batch 9 reprojection

On January 11, 2016, Savannah River Remediation (SRR) provided the Savannah River National Laboratory (SRNL) with a Sludge Batch 9 (SB9) reprojection that was developed from the analyzed composition of a Tank 51 sample. This sample was collected after field washing had been completed in Tank 51 to support the alternate reductant task. Based on this reprojection, Frit 803 is still a viable option for the processing of SB9 under sludge-only operations and coupled (Actinide Removal Process (ARP) product with and without monosodium titanate (MST)) operations. The maximum projected volumes of ARP product that can be transferred from the Precipitate Reactor Feed Tank (PRFT) per Sludge Receipt and Adjustment Tank (SRAT) batch and the resulting Na 2 O concentrations in the SRAT for coupled operations were determined. The Na 2 O concentrations in the SRAT resulting from the maximum projected ARP product transfer volumes are consistent with those from the previous assessments that were based on the August 2015 projections. Regardless of the presence or absence of MST in the ARP product, the contribution of Na 2 O to the resulting glass will be similar at the same waste loading (WL). These projected volumes of ARP product are not anticipated to be an issue for SB9. The actual transfer volumes from the PRFT to the SRAT are determined based upon the analyzed Na 2 O concentrations in the PRFT samples, which has resulted in larger transfer volumes than those allowed by the projections for Sludge Batch 8 (SB8). An operating window of 32-40% WL around the nominal WL of 36% is achievable for both sludge-only and coupled operations; however, each of the glass systems studied does become limited by waste form affecting constraints (durability) at higher volumes of ARP product and WLs of 41-42%.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7b (SB7b), also referred to as Macrobatch 9 (MB9), in January 2012. SB7b is a blend of the heel of Tank 40 from Sludge Batch 7a (SB7a) and the SB7b material that was transferred to Tank 40 from Tank 51. SB7b was processed using Frit 418.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 5 QUALIFICATION

Sludge Batch 5 (SB5) is predominantly a combination of H-modified (HM) sludge from Tank 11 that underwent aluminum dissolution in late 2007 to reduce the total mass of sludge solids and aluminum being fed to the Defense Waste Processing Facility (DWPF) and Purex sludge transferred from Tank 7. Following aluminum dissolution, the addition of Tank 7 sludge and excess Pu to Tank 51, Liquid Waste Operations (LWO) provided the Savannah River National Laboratory (SRNL) a 3-L sample of Tank 51 sludge for SB5 qualification. SB5 qualification included washing the sample per LWO plans/projections (including the addition of a Pu/Be stream from H Canyon), DWPF Chemical Process Cell (CPC) simulations, waste glass fabrication (vitrification), and waste glass chemical durability evaluation. This report documents: (1) The washing (addition of water to dilute the sludge supernatant) and concentration (decanting of supernatant) of the Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF CPC simulation using the washed Tank 51 sample. This includes a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid is added to the sludge to destroy nitrite and remove mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit is added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters for the CPC processing were based on work with a non radioactive simulant. (3) Vitrification of a portion of the SME product and Product Consistency Test (PCT) evaluation of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This work is controlled by a Task Technical and Quality Assurance Plan (TTQAP) , and analyses are guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Precipitate Reactor Feed Tank (PRFT) Batches 44 and 49 from the Defense Waste Processing Facility (DWPF)

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes a Monosodium Titanate/Sludge Solids (MST/SS) waste stream received from the Salt Waste Processing Facility (SWPF) via the Precipitate Reactor Feed Tank (PRFT). During processing, DWPF is required to provide evidence of compliance with the Waste Acceptance Product Specifications (WAPS). Savannah River Mission Completion (SRMC) has requested Savannah River National Laboratory (SRNL) to analyze PRFT samples representing each SWPF salt batch for thirty-two radionuclides. Additionally, elemental analysis of PRFT slurry and MST/SS solids was performed to aid SRMC in further refinement of the inputs and assumptions used in future frit development and Material Tracking Program calculations. The analyses of PRFT Batches 44 and 49, which correspond to material from the processing of Salt Batches (StB) 12 and 11, respectively, are reported herein. The unwashed dried solids of the PRFT Batches 44 and 49 are predominately MST, ~63-59% MST. The two batches have a much higher amount of Fe, Mn, and Ni compared to all previous batches. For Batch 44 this appears to be due to the use of a sludge simulant filter aid during processing of StB 12 and for Batch 49, it is possibly due to the larger amount of insoluble solids for StB 11 in comparison to all previous salt batches. Like previous PRFT batches, a significant amount of the unwashed dried solids are alkaline earth metals. The total sulfate, in mg/kg of slurry, for PRFT Batches 44 and 49 is 119 and 139, respectively, which is well below the current sulfate concentration used in Material Tracking Program calculations and is in agreement with DWPF laboratory sulfate measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Basin De-Inventory Maximum Fissile Estimate

The Accelerated Basin De-inventory (ABD) program increases processing of Spent Nuclear Fuel (SNF) in H-Canyon to accelerate the closure of L Basin. The dissolved SNF will be dispositioned to Sludge Batches that will be processing in the Defense Waste Processing Facility and converted to glass. The fissile glass loading directly impacts the amount of glass canisters made. This memorandum provides an estimated maximum quantity of total fissile expected to be transferred to a Sludge Batch to support increasing the fissile glass loading and thus reducing the number of canisters created across the lifetime of the ABD mission.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sludge Batch 10 Frit Development and Variability Study Matrix Design

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26H, and Alternate Feed Stock-2 (AFS-2). H-Canyon also had a need to discard Sodium Reactor Experiment (SRE) material that was stored in Tanks 16.3 and 16.4. Savannah River Remediation (SRR) added a portion of the SRE material to Sludge Batch 9 (SB9) in Tank 40 and the remainder was added to SB10 that is currently being prepared in Tank 51. In support of sludge batch preparation and qualification efforts, SRR requested that the Savannah River National Laboratory (SRNL) complete the following tasks based on the SB10 projections provided by the SRR System Planning group.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Organic Separation Test Results

Separable organics have been defined as “those organic compounds of very limited solubility in the bulk waste and that can form a separate liquid phase or layer” (Smalley and Nguyen 2013), and result from three main solvent extraction processes: U Plant Uranium Recovery Process, B Plant Waste Fractionation Process, and Plutonium Uranium Extraction (PUREX) Process. The primary organic solvents associated with tank solids are TBP, D2EHPA, and NPH. There is concern that, while this organic material is bound to the sludge particles as it is stored in the tanks, waste feed delivery activities, specifically transfer pump and mixer pump operations, could cause the organics to form a separated layer in the tank farms feed tank. Therefore, Washington River Protection Solutions (WRPS) is experimentally evaluating the potential of organic solvents separating from the tank solids (sludge) during waste feed delivery activities, specifically the waste mixing and transfer processes. Given the Hanford Tank Waste Treatment and Immobilization Plant (WTP) waste acceptance criteria per the Waste Feed Acceptance Criteria document (24590-WTP-RPT-MGT-11-014) that there is to be “no visible layer” of separable organics in the waste feed, this would result in the batch being unacceptable to transfer to WTP. This study is of particular importance to WRPS because of these WTP requirements.

complexants↗

DEMONSTRATION OF THE GLYCOLIC-FORMIC FLOWSHEET IN THE SRNL SHIELDED CELLS USING ACTUAL WASTE

Glycolic acid was effective at dissolving many metals, including iron, during processing with simulants. Criticality constraints take credit for the insolubility of iron during processing to prevent criticality of fissile materials. Testing with actual waste was needed to determine the extent of iron and fissile isotope dissolution during Chemical Process Cell (CPC) processing. The Alternate Reductant Project was initiated by the Savannah River Remediation (SRR) Company to explore options for the replacement of the nitric-formic flowsheet used for the CPC at the Defense Waste Processing Facility (DWPF). The goals of the Alternate Reductant Project are to reduce CPC cycle time, increase mass throughput of the facility, and reduce operational hazards. In order to achieve these goals, several different reductants were considered during initial evaluations conducted by Savannah River National Laboratory (SRNL). After review of the reductants by SRR, SRNL, and Energy Solutions (ES) Vitreous State Laboratory (VSL), two flowsheets were further developed in parallel. The two flowsheet options included a nitric-formic-glycolic flowsheet, and a nitric-formic-sugar flowsheet. As of July 2011, SRNL and ES/VSL have completed the initial flowsheet development work for the nitric-formic-glycolic flowsheet and nitric-formic-sugar flowsheet, respectively. On July 12th and July 13th, SRR conducted a Systems Engineering Evaluation (SEE) to down select the alternate reductant flowsheet. The SEE team selected the Formic-Glycolic Flowsheet for further development. Two risks were identified in SEE for expedited research. The first risk is related to iron and plutonium solubility during the CPC process with respect to criticality. Currently, DWPF credits iron as a poison for the fissile components of the sludge. Due to the high iron solubility observed during the flowsheet demonstrations with simulants, it was necessary to determine if the plutonium in the radioactive sludge slurry demonstrated the same behavior. The second risk is related to potential downstream impacts of glycolate on Tank Farm processes. The downstream impacts will be evaluated by a separate research team. Waste Solidification Engineering (WSE) has requested a radioactive demonstration of the Glycolic-Formic Flowsheet with radioactive sludge slurry be completed in the Shielded Cells Facility of the SRNL. The Shielded Cells demonstration only included a Sludge Receipt and Adjustment Tank (SRAT) cycle, and not a Slurry Mix Evaporator (SME) cycle or the co-processing of salt products. Sludge Batch 5 (SB5) slurry was used for the demonstration since it was readily available, had been previously characterized, and was generally representative of sludges being processing in DWPF. This sample was never used in the planned Shielded Cells Run 7 (SC-7).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Increasing the Fissile Mass Loading of High-Level Waste Glass Canisters to Greater Than 2,500 g/m 3 at the Savannah River Site

To eliminate future fissile mass loading constraints for the Savannah River Site H-Canyon Facility and Liquid Waste system, the Savannah River National Laboratory recommends a repository evaluation of a uranium fissile mass loading in glass at 7,144 g/m 3 in addition to the existing International Atomic Energy Agency safeguards and security limit of 2,500 g/m 3 total plutonium. This recommended increase above the authorized 2,500 g/m 3 fissile mass loading limit is based on concentrations of uranium and plutonium shown to produce an acceptable glass waste form rather than projections of the maximum fissile mass loading in future sludge batches. An authorized fissile mass loading limit greater than 2,500 g/m 3 will increase facility flexibility, reduce the number of high-level waste canisters produced, and potentially avoid an increase in the Department of Energy Environmental Management mission life without compromising safety or glass product quality.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gandolinium poison solubility testing for the downstream impacts from accelerated basin de-inventory

The Accelerated Basin De-inventory (ABD) Program at the Savannah River Site (SRS) is designed to accelerate the de-inventory of L-Basin and accelerate the Spent Nuclear Fuel (SNF) Disposition mission. Spent fuel will be dissolved in H-Canyon without recovery of uranium. The dissolver solutions will be temporarily stored, pH-adjusted to excess hydroxide (which will facilitate precipitation of metal oxides/hydroxides), transferred to the Concentration, Storage, and Transfer Facility (CSTF), and subsequently immobilized in the Defense Waste Processing Facility (DWPF) during planned sludge batch campaigns. ABD accelerates basin closure, significantly reduces programmatic risk, and greatly reduces the lifecycle budget requirements for the site by eliminating the need for a SNF drying and packaging capability. The ABD approach represents a significant change to the clean-up approach for the SRS. However, the increased fissile loading in sludge batches, due to the dissolver solutions, requires investigation to ensure fissile limits are efficiently and safely managed; higher fissile loadings in the glass are projected to be two to three times higher than the current fissile concentration limit of 897 g/m 3 and will be addressed in a future report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EVALUATION OF LOW TEMPERATURE ALUMINUM DISSOLUTION IN TANK 51

Liquid Waste Organization (LWO) identified aluminum dissolution as a method to mitigate the effect of having about 50% more solids in High Level Waste (HLW) sludge than previously planned. Previous aluminum dissolution performed in a HLW tank in 1982 was performed at approximately 85 C for 5 days, which became the baseline aluminum dissolution process. LWO initiated a project to modify a waste tank to meet these requirements. Subsequent to an alternative evaluation, LWO management identified an opportunity to perform aluminum dissolution on sludge destined for Sludge Batch 5, but within a limited window that would not allow time for any modifications for tank heating. A variation of the baseline process, dubbed Low Temperature Aluminum Dissolution (LTAD), was developed based on the constraint of available energy input in Tank 51 and the window of opportunity, but was not constrained to a minimum extent of dissolution, i.e. dissolve as much aluminum as possible within the time available. This process was intended to operate between 55 and 70 C, but for a significantly longer time than the baseline process. LTAD proceeded in parallel with the baseline project. The preliminary evaluation at the completion of LTAD focused on the material balance and extent of the aluminum dissolved. The range of values of extent of dissolution, 56% to 64%, resulted from the variation in liquid phase sample data available at the time. Additional solid phase data is available from a sample taken after LTAD to refine this range. This report provides additional detailed evaluation of the LTAD process based on analytical and field data and includes: a summary of the process chronology; a determination of an acceptable blending strategy for the aluminum-laden supernate stored in Tank 11; an update to the determination of aluminum dissolved using more complete sample results; a determination of the effect of LTAD on uranium, plutonium, and other metals; a determination of the rate of heat loss from a quiescent tank; and an evaluation of the aluminum dissolution rate model and actual dissolution rate. LTAD was successfully completed in Tank 51 with minimal waste tank changes. The following general conclusions may be drawn about the LTAD process: (1) Dissolution at about 60 C for 46 days dissolved 64% of the aluminum from the sludge slurry. (2) The aluminum-laden leach solution decanted to Tank 11 can be blended with a wide variety of supernates without risk of precipitating the dissolved aluminum based on thermodynamic chemical equilibrium models. (3) Uranium and plutonium leached into solution without corresponding leaching of iron or metal other than aluminum, but the total mass leached was a small fraction of the total uranium and plutonium in the sludge. (4) The concentration of uranium and plutonium in the leach solution was indistinguishable from other tank farm supernates, thus, the leach solutions can be managed relative to the risk of criticality like any other supernate. (5) A small amount of mercury leached into solution from the sludge causing the liquid phase concentration to increase 6 to 10 fold, which is consistent with the 4 to 14 fold increase observed during the 1982 aluminum dissolution demonstration. (6) Chromium did not dissolve during LTAD. (7) Chloride concentration increased in the liquid phase during LTAD due to chloride contamination in the 50% sodium hydroxide solution. (8) The rate of heat loss from Tank 51 at temperatures above 45 C appeared linear and predictable at 8E+7 cal/hr. (9) The rate of heat transfer from Tank 51 did not follow a simplified bulk heat transfer model. (10) Prediction of the aluminum dissolution rate was prone to error due to a lack of active specific surface area data of sludge particles. (11) The higher than expected dissolution rate during LTAD was likely due to smaller than expected particle sizes of most of the sludge particles. While evaluating the LTAD process, the dissolved salt solution from Tank 41 that was stored and sampled in Tank 49 was determined to be supersaturated relative to aluminum. Supersaturation in Tank 49 is not a risk to LTAD. However, storing and processing of this supernate carries a risk of solids precipitation, primarily in the form of gibbsite or boehmite. Blending with the supernate in Tank 11 neither increases nor decreases this risk. LTAD was initiated as an opportunity to substantially mitigate the planned increase in canister production and DWPF lifecycle after the realization of more sludge solids stored in the HLW tanks. As determined from the preliminary evaluation of LTAD, the direct benefit of the decanted liquid stored in Tank 11 represents 45 canisters at 34% waste loading with potential indirect benefits for much larger reductions. Application of an aluminum dissolution process to the remaining high aluminum content sludge will potentially reduce the planned canister production by several hundred canisters at 34%-38% waste loading.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

VITRIFICATION OF HIGH LEVEL WASTE AT THE SAVANNAH RIVER SITE

The objective of this study was to experimentally measure the properties and performance of a series of glasses with compositions that could represent high level waste Sludge Batch 5 (SB5) as vitrified at the Savannah River Site Defense Waste Processing Facility. These data were used to guide frit optimization efforts as the SB5 composition was finalized. Glass compositions for this study were developed by combining a series of SB5 composition projections with a group of candidate frits. The study glasses were fabricated using depleted uranium and their chemical compositions, crystalline contents and chemical durabilities were characterized. Trevorite was the only crystalline phase that was identified in a few of the study glasses after slow cooling, and is not of concern as spinels have been shown to have little impact on the durability of high level waste glasses. Chemical durability was quantified using the Product Consistency Test (PCT). All of the glasses had very acceptable durability performance. The results of this study indicate that a frit composition can be identified that will provide a processable and durable glass when combined with SB5.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FLOWSHEET FOR ALUMINUM REMOVAL FROM SLUDGE BATCH 6

Samples of Tank 12 sludge slurry show a substantially larger fraction of aluminum than originally identified in sludge batch planning. The Liquid Waste Organization (LWO) plans to formulate Sludge Batch 6 (SB6) with about one half of the sludge slurry in Tank 12 and one half of the sludge slurry in Tank 4. LWO identified aluminum dissolution as a method to mitigate the effect of having about 50% more solids in High Level Waste (HLW) sludge than previously planned. Previous aluminum dissolution performed in a HLW tank in 1982 was performed at approximately 85 C for 5 days and dissolved nearly 80% of the aluminum in the sludge slurry. In 2008, LWO successfully dissolved 64% of the aluminum at approximately 60 C in 46 days with minimal tank modifications and using only slurry pumps as a heat source. This report establishes the technical basis and flowsheet for performing an aluminum removal process in Tank 51 for SB6 that incorporates the lessons learned from previous aluminum dissolution evolutions. For SB6, aluminum dissolution process temperature will be held at a minimum of 65 C for at least 24 days, but as long as practical or until as much as 80% of the aluminum is dissolved. As planned, an aluminum removal process can reduce the aluminum in SB6 from about 84,500 kg to as little as 17,900 kg with a corresponding reduction of total insoluble solids in the batch from 246,000 kg to 131,000 kg. The extent of the reduction may be limited by the time available to maintain Tank 51 at dissolution temperature. The range of dissolution in four weeks based on the known variability in dissolution kinetics can range from 44 to more than 80%. At 44% of the aluminum dissolved, the mass reduction is approximately 1/2 of the mass noted above, i.e., 33,300 kg of aluminum instead of 66,600 kg. Planning to reach 80% of the aluminum dissolved should allow a maximum of 81 days for dissolution and reduce the allowance if test data shows faster kinetics. 47,800 kg of the dissolved aluminum will be stored in Tank 8 and 21,000 kg will be stored in saltcake via evaporation. Up to 77% of the total aluminum planned for SB6 may be removed via aluminum dissolution. Storage of the aluminum-laden supernate in Tank 8 will require routine evaluation of the free hydroxide concentration in order to maintain aluminum in solution. Periodic evaluation will be established on concurrent frequency with corrosion program samples as previously established for aluminum-laden supernate from SB5 that is stored in Tank 11.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GADOLINIUM SOLUBILITY AND VOLATILITY DURING DWPF PROCESSING

Understanding of gadolinium behavior, as it relates to potential neutron poisoning applications at the DWPF, has increased over the past several years as process specific data have been generated. Of primary importance are phenomena related to gadolinium solubility and volatility, which introduce the potential for gadolinium to be separated from fissile materials during Chemical Process Cell (CPC) and Melter operations. Existing data indicate that gadolinium solubilities under moderately low pH conditions can vary over several orders of magnitude, depending on the quantities of other constituents that are present. With respect to sludge batching processes, the gadolinium solubility appears to be highly affected by iron. In cases where the mass ratio of Fe:Gd is 300 or more, the gadolinium solubility has been observed to be low, one milligram per liter or less. In contrast, when the ratio of Fe:Gd is 20 or less, the gadolinium solubility has been found to be relatively high, several thousands of milligrams per liter. For gadolinium to serve as an effective neutron poison in CPC operations, the solubility needs to be limited to approximately 100 mg/L. Unfortunately, the Fe:Gd ratio that corresponds to this solubility limit has not been identified. Existing data suggest gadolinium and plutonium are not volatile during melter operations. However, the data are subject to inherent uncertainties preventing definitive conclusions on this matter. In order to determine if gadolinium offers a practical means of poisoning waste in DWPF operations, generation of additional data is recommended. This includes: Gd solubility testing under conditions where the Fe:Gd ratio varies from 50 to 150; and Gd and Pu volatility studies tailored to quantifying high temperature partitioning. Additional tests focusing on crystal aging of Gd/Pu precipitates should be pursued if receipt of gadolinium-poisoned waste into the Tank Farm becomes routine.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗