Sludge Batch 11 Assembly: Tank 51

Savannah River Mission Completion (SRMC) Nuclear Safety and Engineering Integration has requested that Savannah River National Laboratory (SRNL) perform Tank 51 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 51 after transfers from Tank 22, Tank 35, and Tank 13 (post Tank 15 to Tank 13 transfer) to Tank 51 that demonstrates the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 51 samples were delivered to SRNL from March 2023 to February 2024. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, and supernate corrosion control analyses. The results of the Tank 51 samples are consistent with and representative of expected sludge projections for Sludge Batch 11.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 15

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 15 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 15 prior to transfer from Tank 15 to Tank 13 (prior to sending to Tank 51) in order to demonstrate that the transfer is "Low Rem" and ensure the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 15 samples were delivered to SRNL from December 2022 to August 2023. The individual sets of composite samples were analyzed for density, weight percent solids, chemical composition, radionuclides, and/or supernate corrosion control tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sludge Batch 11 Assembly: Tank 26

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 26 (Rev.1)

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Results of the Tank 51H Sludge Batch 11 As-Received Qualification Sample

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC) to qualify the next sludge batch, Sludge Batch 11 (SB11), for processing at the Defense Waste Processing Facility (DWPF). This report documents the first steps of the qualification process, characterization of the Tank 51H as-received qualification material. SRMC sent SRNL two 200 mL samples received from Tank 51H on the 12th of August 2024. The combined sample, HTF-51-24-85/86, was analyzed for the following: supernate and slurry density, weight percent solids, settling, chemical composition, and radionuclides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 13

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 13 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 13 (also containing transferred Tank 15 heel sludge) prior to transfer from Tank 13 to Tank 51 in order to demonstrate that the transfer is "Low Rem" and ensure the sludge concurs with the estimated transfer mass for the SB11 recipe. One Tank 13 sample was delivered to SRNL in October 2023. The sample was analyzed for density, weight percent solids, and total alpha.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Pu Solubility in Glass for Sludge Batch 11

Stainless-steel clad Pu from Japan’s Fast Critical Assembly (FCA) reactor is currently being dispositioned at the Savannah River Site. The electrolytic dissolver, operated by Savannah River Nuclear Solutions in H-Canyon, is being utilized to dissolve the material. The resulting solutions are transferred to the Concentration, Storage, and Transfer Facilities, operated by Savannah River Mission Completion (SRMC), for subsequent vitrification at the Defense Waste Processing Facility (DWPF). In support of the FCA mission startup, a preliminary evaluation was conducted by the Savannah River National Laboratory to assess the impact of the FCA discards on the liquid waste system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation Of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing. For SB5 through initial Sludge Batch 9 (SB9) processing prior to coupled operation with the Salt Waste Processing Facility (SWPF), SRNL provided DWPF a bounding glass density value that was based on a statistical evaluation of density measurements. To eliminate the need for experimental work, a composition-based density model for HLW glasses was developed at SRNL in 2019. The objective of this report is to present the bounding glass density determined with the composition-based density model for SB10 sludge-only (SO) and coupled processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of the Sludge Batch 9 (Macrobatch 11) DWPF Pour Stream Glass Sample

A pour stream (PS) sample taken near the end of processing of Sludge Batch 9 (SB9, Macrobatch 11) with the Nitric-Formic Acid Flowsheet was analyzed by the Savannah River National Laboratory to comply with the Defense Waste Processing Facility (DWPF) Glass Product Control Program. The SB9 PS sample was taken on 5/28/2022 during Melter Feed Batch 815 associated with glass canister S04741, and was transferred to SRNL in Primary Container PC0136.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 9 (Macrobatch 11) DWPF Pour Stream Glass Sample Collected During the Nitric-Glycolic Acid Flowsheet Transition

A pour stream (PS) sample taken near the end of processing of Sludge Batch 9 (SB9, Macrobatch 11) during the transition to the nitric-glycolic acid (NGA) flowsheet was analyzed by the Savannah River National Laboratory (SRNL). The SB9 NGA PS sample was taken on 12/18/2022 during Melter Feed Batch 823 associated with glass canister S04773 and was transferred to SRNL in Primary Container PC0139 in February 2023.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of SWPF into the DWPF Flowsheet: Gap Analysis and Test Matrix Development

Based on Revision 19 of the High Level Waste (HLW) System Plan, it is anticipated that the Salt Waste Processing Facility (SWPF) will be integrated into the Defense Waste Processing Facility (DWPF) flowsheet in October 2018 (or with Sludge Batch 11 (SB11)). Given that, Savannah River Remediation (SRR) has requested a technical basis be developed that validates the current Product Composition Control System (PCCS) models for use during the processing of the SWPF-based coupled flowsheet or that leads to the refinements of or modifications to the models that are needed so that the models may be used during the processing of the SWPF-based coupled flowsheet. To support this objective, Savannah River National Laboratory (SRNL) has completed three key interim activities prior to validation of the current or development of refined PCCS models over the anticipated glass composition region for SWPF processing. These three key activities include: (1) defining the glass compositional region over which SWPF is anticipated to be processed, (2) comparing the current PCCS model validation ranges to the SWPF glass compositional region from which compositional gaps can be identified, and (3) developing a test matrix to cover the compositional gaps.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of Reportable Radionuclides for Defense Waste Processing Facility (DWPF) Sludge Batch 9 (Macrobatch 11)

This report documents analyses and calculations performed by the Savannah River National Laboratory (SRNL) of Tank 40 sludge as part of the Waste Acceptance Product Specifications (WAPS) requirements for Sludge Batch 9 (SB9) for the Defense Waste Processing Facility (DWPF). Tank Farm sample HTF-40-17-5 was received by SRNL Shielded Cells Operations (SCO) and was prepared for radionuclide analyses in addition to various other physical and chemical characterizations. Radionuclide analyses were performed by SRNL Analytical Development (AD). Based on criteria set forth in the Department of Energy (DOE) WAPS and DWPF’s Waste Form Compliance Plan (WCP), as well as, historical lessons from previous sludge batch analyses, a list of radionuclides was developed for which the sample was analyzed. The results of these analyses were then used as input into commercially available software, RadDecay version (v) 5.01. The software was used to calculate the activity of the measured analytes in index years 2017 through 3115 in 100-year increments. Radionuclides with half-lives greater than 10 years and activities that comprised more than 0.01% of the total sludge batch activity are reportable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗