Search NASA⌕ Search

SEARCH · Search NASA

Results for “Stochastic programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Sparow-Examples

SAND2026-16701O SPAROW-Examples software provides a repository of stochastic programming examples designed to demonstrate Sandia's SPAROW optimization library. This resource helps users learn to develop complex applications with SPAROW by offering reference implementations that can be used to test and enhance new optimization solvers. The library offers a diverse range of simple and complex exemplars, including those related to power grid applications such as unit commitment and expansion planning. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Hart, William [Sandia National Lab. (SNL-CA), Live↗

Performant Optimization Strategies for Multifidelity Stochastic Power Grid Models

This talk goes into the algorithmic work done under the Forest project in order to solve expensive power grid models. We explore multiple fidelities of models that balance accuracy and computational expense. We use bundling strategies and progressive hedging in order to parallelize large stochastic programs.

Alfant, Rachael May [Sandia National Laboratories ↗

Optimizing Integrated Terminal Airspace Operations Under Uncertainty

In the terminal airspace, integrated departures and arrivals have the potential to increase operations efficiency. Recent research has developed geneticalgorithm- based schedulers for integrated arrival and departure operations under uncertainty. This paper presents an alternate method using a machine jobshop scheduling formulation to model the integrated airspace operations. A multistage stochastic programming approach is chosen to formulate the problem and candidate solutions are obtained by solving sample average approximation problems with finite sample size. Because approximate solutions are computed, the proposed algorithm incorporates the computation of statistical bounds to estimate the optimality of the candidate solutions. A proof-ofconcept study is conducted on a baseline implementation of a simple problem considering a fleet mix of 14 aircraft evolving in a model of the Los Angeles terminal airspace. A more thorough statistical analysis is also performed to evaluate the impact of the number of scenarios considered in the sampled problem. To handle extensive sampling computations, a multithreading technique is introduced.

air traffic optimization↗

SNoGloDe: A Structured Nonlinear Global Decomposition Solver

Large-scale optimization problems often require decomposition strategies and customized algorithms to achieve optimal solutions within a reasonable time. Building on the work of Cao and Zavala (2019) for solving nonlinear two-stage stochastic programs to global optimality, we implement and extend their approach. We generalize to optimization problems reformulated with a block-angular constraint structure (e.g., temporal decomposition). Our framework, written in Python using Pyomo, is highly customizable and enables parallel execution of the decomposition. SNoGloDe allows tailored branching strategies, lower bounding problems, and candidate generators to leverage problem-specific knowledge. To demonstrate effectiveness, we compare SNoGloDe’s performance with Gurobi on a temporally decomposed produced water case study.

algorithms↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Comparison of Traditional Design Nonlinear Programming Optimization and Stochastic Methods for Structural Design

Structural design generated by traditional method, optimization method and the stochastic design concept are compared. In the traditional method, the constraints are manipulated to obtain the design and weight is back calculated. In design optimization, the weight of a structure becomes the merit function with constraints imposed on failure modes and an optimization algorithm is used to generate the solution. Stochastic design concept accounts for uncertainties in loads, material properties, and other parameters and solution is obtained by solving a design optimization problem for a specified reliability. Acceptable solutions were produced by all the three methods. The variation in the weight calculated by the methods was modest. Some variation was noticed in designs calculated by the methods. The variation may be attributed to structural indeterminacy. It is prudent to develop design by all three methods prior to its fabrication. The traditional design method can be improved when the simplified sensitivities of the behavior constraint is used. Such sensitivity can reduce design calculations and may have a potential to unify the traditional and optimization methods. Weight versus reliabilitytraced out an inverted-S-shaped graph. The center of the graph corresponded to mean valued design. A heavy design with weight approaching infinity could be produced for a near-zero rate of failure. Weight can be reduced to a small value for a most failure-prone design. Probabilistic modeling of load and material properties remained a challenge.

Patnaik, Surya N.↗

Digital program for solving the linear stochastic optimal control and estimation problem

A computer program is described which solves the linear stochastic optimal control and estimation (LSOCE) problem by using a time-domain formulation. The LSOCE problem is defined as that of designing controls for a linear time-invariant system which is disturbed by white noise in such a way as to minimize a performance index which is quadratic in state and control variables. The LSOCE problem and solution are outlined; brief descriptions are given of the solution algorithms, and complete descriptions of each subroutine, including usage information and digital listings, are provided. A test case is included, as well as information on the IBM 7090-7094 DCS time and storage requirements.

Geyser, L. C.↗

Two-Stage Distributionally Robust Conic Linear Programming over 1-Wasserstein Balls

Here, this paper studies two-stage distributionally robust conic linear programming under constraint uncertainty over type-1 Wasserstein balls. We present optimality conditions for the dual of the worst-case expectation problem, which characterizes worst-case uncertain parameters for its inner maximization problem. This condition offers an alternative proof, a counterexample, and an extension to previous works. Additionally, the condition highlights the potential advantage of a specific distance metric for out-of-sample performance, as exemplified in a numerical study on a facility location problem with demand uncertainty. Furthermore, cutting-plane-based algorithms, equipped with a unified scenario generation framework, are proposed for addressing both unbounded support and second-stage dual feasible regions, with a finite convergence proof under less stringent assumptions.

Wasserstein↗

Forward Stochastic Nonlinear Adaptive Control Method

New method of computation for optimal stochastic nonlinear and adaptive control undergoing development. Solves systematically stochastic dynamic programming equations forward in time, using nested-stochastic-approximation technique. Main advantage, simplicity of programming and reduced complexity with clear performance/computation trade-offs.

Bayard, David S.↗

Stochastic Evolutionary Algorithms for Planning Robot Paths

A computer program implements stochastic evolutionary algorithms for planning and optimizing collision-free paths for robots and their jointed limbs. Stochastic evolutionary algorithms can be made to produce acceptably close approximations to exact, optimal solutions for path-planning problems while often demanding much less computation than do exhaustive-search and deterministic inverse-kinematics algorithms that have been used previously for this purpose. Hence, the present software is better suited for application aboard robots having limited computing capabilities (see figure). The stochastic aspect lies in the use of simulated annealing to (1) prevent trapping of an optimization algorithm in local minima of an energy-like error measure by which the fitness of a trial solution is evaluated while (2) ensuring that the entire multidimensional configuration and parameter space of the path-planning problem is sampled efficiently with respect to both robot joint angles and computation time. Simulated annealing is an established technique for avoiding local minima in multidimensional optimization problems, but has not, until now, been applied to planning collision-free robot paths by use of low-power computers.

Fink, Wolfgang↗

A forward method for optimal stochastic nonlinear and adaptive control

A computational approach is taken to solve the optimal nonlinear stochastic control problem. The approach is to systematically solve the stochastic dynamic programming equations forward in time, using a nested stochastic approximation technique. Although computationally intensive, this provides a straightforward numerical solution for this class of problems and provides an alternative to the usual dimensionality problem associated with solving the dynamic programming equations backward in time. It is shown that the cost degrades monotonically as the complexity of the algorithm is reduced. This provides a strategy for suboptimal control with clear performance/computation tradeoffs. A numerical study focusing on a generic optimal stochastic adaptive control example is included to demonstrate the feasibility of the method.

Bayard, David S.↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Parallel computing for power system climate resiliency: Solving a large-scale stochastic capacity expansion problem with mpi-sppy

Here we propose a nodal stochastic generation and transmission expansion planning model that incorporates the output from high-resolution global climate models through load and generation availability scenarios. We implement our model in Pyomo and perform computational studies on a realistically-sized test case of the California electric grid in a high performance computing environment. We propose model reformulations and algorithm tuning to efficiently solve this large problem using a variant of the Progressive Hedging Algorithm. We utilize the parallelization capabilities and overall versatility of mpi-sppy, exploiting its hub-and-spoke architecture to concurrently obtain inner and outer bounds on an optimal expansion plan. Initial results show that instances with 360 representative days on a system with over 8,000 buses can be solved to within 5% of optimality in under 4 h of wall clock time, a first step towards solving a large-scale power system expansion planning problem across a wide range of climate-informed operational scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal dynamic remapping of parallel computations

A large class of computations are characterized by a sequence of phases, with phase changes occurring unpredictably. The decision problem was considered regarding the remapping of workload to processors in a parallel computation when the utility of remapping and the future behavior of the workload is uncertain, and phases exhibit stable execution requirements during a given phase, but requirements may change radically between phases. For these problems a workload assignment generated for one phase may hinder performance during the next phase. This problem is treated formally for a probabilistic model of computation with at most two phases. The fundamental problem of balancing the expected remapping performance gain against the delay cost was addressed. Stochastic dynamic programming is used to show that the remapping decision policy minimizing the expected running time of the computation has an extremely simple structure. Because the gain may not be predictable, the performance of a heuristic policy that does not require estimnation of the gain is examined. The heuristic method's feasibility is demonstrated by its use on an adaptive fluid dynamics code on a multiprocessor. The results suggest that except in extreme cases, the remapping decision problem is essentially that of dynamically determining whether gain can be achieved by remapping after a phase change. The results also suggest that this heuristic is applicable to computations with more than two phases.

Nicol, David M.↗

Dual adaptive control: Design principles and applications

The design of an actively adaptive dual controller based on an approximation of the stochastic dynamic programming equation for a multi-step horizon is presented. A dual controller that can enhance identification of the system while controlling it at the same time is derived for multi-dimensional problems. This dual controller uses sensitivity functions of the expected future cost with respect to the parameter uncertainties. A passively adaptive cautious controller and the actively adaptive dual controller are examined. In many instances, the cautious controller is seen to turn off while the latter avoids the turn-off of the control and the slow convergence of the parameter estimates, characteristic of the cautious controller. The algorithms have been applied to a multi-variable static model which represents a simplified linear version of the relationship between the vibration output and the higher harmonic control input for a helicopter. Monte Carlo comparisons based on parametric and nonparametric statistical analysis indicate the superiority of the dual controller over the baseline controller.

Mookerjee, Purusottam↗

Parallel and vector computation for stochastic optimal control applications

A general method for parallel and vector numerical solutions of stochastic dynamic programming problems is described for optimal control of general nonlinear, continuous time, multibody dynamical systems, perturbed by Poisson as well as Gaussian random white noise. Possible applications include lumped flight dynamics models for uncertain environments, such as large scale and background random atmospheric fluctuations. The numerical formulation is highly suitable for a vector multiprocessor or vectorizing supercomputer, and results exhibit high processor efficiency and numerical stability. Advanced computing techniques, data structures, and hardware help alleviate Bellman's curse of dimensionality in dynamic programming computations.

Hanson, F. B.↗

Demand response event simulator and risk-aware bidding tool for industrial customers

Incentive Based Demand Response (IBDR) program participation delivers financial benefits to the consumers and resiliency benefits to the electricity grid. Effectively participating in these programs as an industrial consumer requires bidding strategies that balance financial risk with operational constraints. Existing bidding tools tend not to fully incorporate stochastic IBDR event modeling, program specific baseline and payment/penalty calculations, or demand reduction process control schemes that account for the cascading impacts of shutdown in complex facilities. Here, this work presents an IBDR event simulator and risk-aware bidding framework tool integrating three key components: a flexible, parameterized demand response event generator that rigorously accounts for program structures and stochasticity, a demand response operational simulation model that generates explicit control strategies for load reduction, and a Monte Carlo simulator to evaluate financial risk for varied capacity bids. A case study at a wastewater treatment plant participating in PG&E's Capacity Bidding Program demonstrates the framework's utility. In the peak capacity price month of August, optimal bidding by the wastewater treatment plant nets a mean IBDR benefit of $101,000 (67% of the August electricity bill) with 0.4% probability of a financial loss. This framework enables industrial operators to make informed bidding decisions, negotiate better program terms with demand response load aggregators, and analyze energy flexibility investments at their facilities. Ultimately, this work reduces participation barriers in IBDR programs and supports the broader goal of enhancing grid reliability and renewable energy integration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗