Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission System Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Type 5 Wind Turbine Technology: How Synchronised, Synchronous Generation Avoids Uncertainties About Inverter Interoperability under IEEE 2800:2022

Degradation of system strength because of inverter-based resources (IBRs) is a major concern facing the zero-carbon transition. A new standard released this year, IEEE Standard 2800, attempts to codify the relationship between IBRs and the Transmission System Operator (TSO). It is apparent from IEEE 2800:2022 that there remain fundamental problems with quantifying whether source impedance (the measure of "system strength" with which the standard is concerned) will present a problem for allowing an IBR to connect. This is "because of complex interdependencies between IBR and power system characteristics". So developers are increasingly required to adopt mitigation options such as adding synchronous condensers or curtailing IBRs. A proven Type 5 (synchronous) wind turbine exists and has been running at 0.5 MW scale in a 46 MW wind farm in New Zealand since 2006 and eight turbines in Scotland since 2013. The US National Renewable Energy Laboratory (NREL) is conducting a study of the impacts on grid reliability, stability, and resilience of Type 5 wind turbines. The project has both simulation and testing tasks and will result in proposing a variable generation solution that will help system operators and utilities address all reliability and most resilience challenges in the evolving grid.

grid stability↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DSO+T: Valuation Methodology and Economic Metrics (DSO+T Study: Volume 4)

This report summarizes a rigorous valuation analysis methodology used by the Distribution System Operator with Transactive (DSO+T) study to estimate the financial benefits and costs of adopting Transactive Energy coordination of distributed energy resources for key stakeholders (for example distribution system operators and customers). This was achieved by modeling the value exchanges between stakeholders and determining the annualized costs and revenues experienced by stakeholders, enabling the evaluation of overall impact on stakeholder’s annualized cash flow. Extensive work was conducted developing methods to estimate the operating costs of distribution system operators at a level of granularity that would allow the financial impact of implementing a transactive energy approach to be estimated. This work included developing parametric models for labor and software costs, distribution system capital and maintenance costs, growth rates, and factors to determine annualized costs of capital investments. Simulation results were used to calculate wholesale energy costs and revenues from retail sales. Valuation analysis methods were also developed for other stakeholders including customers, the transmission system operator, independent system operator, and generators. The resulting capability allows a complete mapping of the flow of financial value between stakeholders that can be directly integrated with the results of demand flexibility simulations. Example results are provided for a business-as-usual case and compared to a transactive energy case as well as to actual cost data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Aggregated EV Flexibility With TSO-DSO Coordination

Electric vehicles (EVs) are becoming a promising source of grid ancillary services due to the temporal and spatial charging flexibility, quick response and storage capability. Such advantages are increasing with government policy promotion and technology improvement. However, the exploration of EV flexibility requires the coordination of both transmission system operators (TSOs) and distribution system operators (DSOs), to ensure the safe and reliable operation of power network. In this paper, we propose a coordinated evaluation method that determines the optimal utilization of EV temporal flexibility without compromising EV owners’ usage. At the distribution level, DSOs first evaluate EV aggregators’ operational boundaries to exploit distribution level services. At the transmission level, TSOs then determine EV charging schedules and ancillary service capacity simultaneously, taking into account the requirement from DSOs. Here, we validate the model in a case study using the IEEE 123 node test feeder and EV charging sessions obtained from a transportation simulation tool that uses real-world data.

33 ADVANCED PROPULSION SYSTEMS↗

Online Output-Based Inertia Estimation of Modern Power Systems

The overall inertia of modern power systems is drastically impacted by the penetration level of converter-based resources (CBRs). The intermittent output of CBRs and their dependence on the weather conditions affirm the need for a realtime inertia estimation approach. This can help the transmission system operators(TSOs) to be continuously aware of the changes in the system inertia and to take suitable control actions. This paper is a step forward to a totally data-driven framework for power system inertia estimation using the available measurements from the phasor measurement units (PMUs). This inertia estimation is done based on the spectral analysis of the so-called Koopman linear operator. Koopman operator considers the relationship between the system's inertia and its dynamical response to slight disturbances in the load. Simulation results show that Koopman operator can approximate the system behavior in a reconstructed linear space hence inertia constant is estimated accurately.

data-driven↗

Grid Integration of Offshore Wind Power: Standards, Control, Power Quality and Transmission

Offshore wind is expected to be a major player in the global efforts toward decarbonization, leading to exceptional changes in modern power systems. Understanding the impacts and capabilities of the relatively new and uniquely positioned assets in grids with high integration levels of inverter-based resources, however, is lacking, raising concerns about grid reliability, stability, power quality, and resilience, with the absence of updated grid codes to guide the massive deployment of offshore wind. To help fill the gap, this paper presents an overview of the state-of-the-art technologies of offshore wind power grid integration. First, the paper investigates the most current grid requirements for wind power plant integration, based on a harmonized European Network of Transmission System Operators (ENTSO-E) framework and notable international standards, and it illuminates future directions. The paper discusses the wind turbine and wind power plant control strategies, and new control approaches, such as grid-forming control, are presented in detail. The paper reviews recent research on the ancillary services that offshore wind power plants can potentially provide, which, when harmonized, will not only comply with regulations but also improve the value of the asset. The paper explores topics of wind power plant harmonics, reviewing the latest standards in detail and outlining mitigation methods. The paper also presents stability analysis methods for wind power plants, with discussions centered on validity and computational efficiency. Finally, the paper discusses wind power plant transmission solutions, with a focus on high-voltage direct-current topologies and controls.

17 WIND ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Robust VAR Capability Curve of DER with Uncertain Renewable Generation

Active distribution system with high penetration of inverter based distributed energy resources(DER), can be utilized for var-related ancillary services at the transmission side interface. In order to utilize the DER flexibility, transmission system operator must be presented the aggregated DER flexibility of distribution system. However, the uncertainty in renewable generation, questions the credibility of aggregated capability curve in practice. In this paper, we incorporate the uncertainty into aggregation process to develop capability curve while preserving the real physics (unbalance and lossy nature) of distribution system. The Resulting capability curve with the associated probability can be harnessed by the TSO for decision making for both planning and operation.

Kar, Aditya Shankar↗

Distributed Load Shedding Application Architecture and Bi-Level Predictive Estimator Algorithm

Increasing penetrations of distributed renewables are decreasing the effectiveness of traditional decentralized under-frequency load shedding (UFLS) schemes. As more distribution circuits begin to back-feed the transmission system, operation of traditional UFLS may exacerbate frequency instability. This paper presents the conceptual framework for a data-rich environment to coordinate UFLS across multiple distribution providers based on the laminar coordination framework in order to ensure optimal adaptive setting of UFLS relays. Communication and control are enabled through a distributed implementation of the IEC 61968-1 Common Information Model message bus structure. In addition to the proposed architecture, a novel adaptive UFLS scheme informed by a bi-level state estimator to create optimal relay setpoints is introduced. Initial simulation results are presented for the IEEE 14-bus test system on scenarios leading to mis-operation of traditional UFLS.

Anderson, Alexander A.↗

Integrating Hydrogen Production and Electricity Markets: Analytical Insights from California

This report compares the cost of different pathways for producing hydrogen in California. In addition to capturing the current cost of electrolyzers and other equipment, the pathways apply current retail electricity tariff options offered by utilities Southern California Edison (SCE), Pacific Gas & Electric Company (PG&E), and San Diego Gas & Electric Company (SDG&E). The analysis also tests the cost of combining hydrogen production with utility-scale wind or solar generation in California. Scenarios examine current costs as well as projections for 2030. The cost benchmark - a relatively low electrolytic hydrogen production cost - is based on the wholesale price of electricity used by a theoretical hydrogen production plant connected directly to the California Independent System Operator (CAISO) transmission system. California law currently prohibits this approach in CAISO, but it is permissible in other organized wholesale electricity markets. The cost for producing hydrogen under 2019 conditions in this theoretical case was approximately $3/kg. Different scenarios are used to examine current costs, e.g., 2019, as well as projections for 2030.

08 HYDROGEN↗

Stochastic Look Ahead Commitment: A Computational Perspective

This presentation gives an overview of a stochastic look ahead commitment (SLAC) problem for managing transmission grid uncertainty in the near- to medium-term (15 minutes to a few hours). We discuss formulation and solution methods, as well as application to transmission system operations.

27 ARPA - Advanced Research Projects Agency-Energy↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Gear Transmission Error Measurement System Made Operational

A system directly measuring the transmission error between the meshing spur or helical gears was installed at the NASA Glenn Research Center and made operational in August 2001. This system employs light beams directed by lenses and prisms through gratings mounted on the two gear shafts. The amount of light that passes through both gratings is directly proportional to the transmission error of the gears. The device is capable of resolution better than 0.1 mm (one thousandth the thickness of a human hair). The measured transmission error can be displayed in a "map" that shows how the transmission error varies with the gear rotation or it can be converted to spectra to show the components at the meshing frequencies. Accurate transmission error data will help researchers better understand the mechanisms that cause gear noise and vibration and will lead to The Design Unit at the University of Newcastle in England specifically designed the new system for NASA. It is the only device in the United States that can measure dynamic transmission error at high rotational speeds. The new system will be used to develop new techniques to reduce dynamic transmission error along with the resulting noise and vibration of aeronautical transmissions.

Oswald, Fred B.↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗