Search NASA⌕ Search

SEARCH · Search NASA

Results for “Washington Closure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NDA Challenges during Cleanup of the Hanford 618-10 Burial Ground Trenches - 15542

The 618-10 Burial Ground on the Hanford Reservation was an early trench waste site used for the disposal of waste from the 300 Area at Hanford. Much of this waste consisted of residues from evaluations of failed fuel as well as various process and separations studies associated with the Department of Energy (DOE) mission which were performed in the 300 Area between March 1954 and September 1963. Much of this waste contained significant concentrations of fission products as well as Transuranic (TRU) radionuclides. Waste forms consist of drums and boxes which were disposed of in the trenches. Many of the drums are shielded containers, cemented sludge, or cemented debris. There are no identifying marks on the containers to correlate them to a specific waste stream. In addition there is some waste in the trenches which came from other locations outside of the 300 area. Cleanup of the 618-10 burial ground is covered under the Washington Closure Hanford (WCH) contract. Due to the proximity of the 618-10 site to the Columbia River, waste is being removed from the 618-10 site, stabilized, and disposed of into either the Environmental Restoration Disposal Facility (ERDF) if the containers are determined to be LLW or transferred to the Hanford Central Waste Complex (CWC) if the containers are suspected to be TRU waste. In order to determine the correct disposal path Non Destructive Assay (NDA) must be performed on all of the containers excavated from the trenches. The NDA of these containers is performed using germanium gamma spectroscopy with an In Situ Object Counting System (ISOCS) and with a neutron slab counter. Due to the challenges associated with these difficult waste streams, matrices, and lack of information to associate these containers with a particular process, the NDA program has had to develop a more robust process to ensure the correct disposition of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford building 324 REC hot cell decommissioning approach - 15484

The 324 Building is a facility located at the Hanford Site and is undergoing decontamination and demolition (D and D) activities by Washington Closure Hanford (WCH). In October 1986, an in-cell leak of approximately 1.3 million curies occurred with a substantial fraction being lost into the subsurface soil beneath the floor of a large hot cell complex. Sampling under the hot cell floor revealed hot spots in the soil and cobble reading in excess of 10,000 R. In January of 2014, WCH contracted an AREVA lead team with Kurion as primary design agent to remove the B-Cell floor and highly contaminated underlying soils. The objective of this project is to remove the contaminated debris and soil and repackage them into the existing adjacent hot cells for final disposition as monoliths. The approach to this project uses an innovate combination of existing cell equipment, commercial equipment, and special tools to perform a series of completely remote operations. Also, a novel waste handling approach allows all the highly radioactive waste to remain within the existing cells. The remote handling approach to this project is to use customized off-the-shelf excavators which are mounted and operated remotely inside the cell. These can be moved and replaced remotely with a -Plug-and-Play- connection method. All the cables and utilities for the excavator and tools are managed through this cell connection with connections in a worker-accessible gallery space. The remote excavators are wall-mounted, which frees up the floor for the excavator work. The design also includes a transfer barrier which allows the B-Cell door to remain open during waste transfers while preventing spread of contamination between cells. The project balances the use of existing cell equipment such as cranes and shield doors, with the use of new remote equipment Existing equipment will be removed from the floor of the hot cell to adjacent cells. The concrete floor and stainless steel liner will then be remotely cut and removed, revealing the contaminated soil beneath the cell. The contaminated soil will be mixed with grout in the cell using the excavators and then placed in rigid bins. These bins will then be placed in the adjacent cells using existing overhead cranes. The waste containers allow optimal utilization of the limited adjacent hot cell space and improve the characteristics of the final waste monolith package. The system will use each bin once which significantly decreases the risk of contamination spread. The project includes a full-scale mockup facility in which all installation and operational activities will be tested and proven prior to hot cell construction activities. The mockup facility will also be used for operator training before actual hot work starts. This facility will remain available for use during operations with a full set of spares for redundancy and to support operations modeling during construction and remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Sr-90 Drums at the Hanford 618-10 Burial Ground - 16132

The 618-10 Burial Ground on the Hanford Reservation was an early trench waste site used for the disposal of waste from the 300 Area at Hanford. Much of this waste consisted of residues from evaluations of failed fuel as well as various process and separations studies associated with the Department of Energy (DOE) mission which were performed in the 300 Area between March 1954 and September 1963. Historical records indicated that there were also several drums which contained significant quantities of separated Sr-90. Cleanup of the 618-10 burial ground is covered under the Washington Closure Hanford (WCH) contract. Due to the proximity of the 618-10 site to the Columbia River, waste is being removed from the 618-10 site, stabilized, and disposed of into either the Environmental Restoration Disposal Facility (ERDF) if the containers are determined to be LLW or transferred to the Hanford Central Waste Complex (CWC) if the containers are suspected to be TRU waste. In order to determine the correct disposal path, Non Destructive Assay (NDA) must be performed on all of the containers excavated from the trenches. The NDA of these containers is performed using germanium gamma spectroscopy with an In Situ Object Counting System (ISOCS) and with a neutron slab counter. Occasional ISOCS spectra exhibited a characteristic Sr-90/Y-90 Bremsstrahlung continuum. In some cases there were measurable gammas present, however in other cases only the Bremsstrahlung continuum was present. Typically Sr-90 is correlated to Cs-137 as they are normally produced in approximately a 1:1 ratio during the fission process. For some of these drums there was no Cs-137 detectable and therefore no way to quantify the Sr-90. Due to concerns about providing a reasonable and conservative nuclide inventory it was decided to evaluate a technique to utilize data from the Bremsstrahlung continuum to quantify the Sr-90 activity in these drums. The development of the technique combined MCNP modeling and comparison of measured gammas to the continuum for a well-defined waste stream. The final result showed reasonable correlation to the expected scaling factors for many drums, while also providing a reasonable measured value for drums with significantly enhanced Sr-90 concentrations. Ultimately all drums were demonstrated to be within the ERDF waste acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management 2016 300-296 Soil Remediation Project. Developing Innovative Solutions to Overcome Design Challenges - 16229

The 324 Building is a non-reactor, Hazard Category 2, Nuclear Facility located in the 300 Area of the U.S. Department of Energy (DOE) Hanford Site, located near Richland, Washington. The building is undergoing deactivation, decommissioning, decontamination, and demolition by Washington Closure Hanford (WCH) under the River Corridor Closure Contract. During the Cold War Era, the facility was used for chemical and radionuclide processing associated with nuclear weapons production. Historical records indicate that in October 1986, approximately 516 L of a concentrated liquid waste stream containing cesium-137 and strontium-90 was spilled onto the floor of B-Cell. B-Cell is located in the Radiochemical Engineering Complex (REC) of the 324 Building. It is estimated that this spill contained approximately 1.3 million curies of radioactivity. Some fraction of the spill was recovered; however, an unknown quantity was released into the soil beneath the 324 Building through an undetected breach in the B-Cell floor sump. Unknown quantities of water were used after the spill to wash items contained in B-Cell. When B-Cell was taken out of service, wastes being removed from B-Cell were placed in Grout Containers (GCs) and stabilized using a particulate grout. In the course of grouting activities, grout was spilled on the floor of B-Cell, eventually filling the sump. The primary scope of this project is to design, test, and implement a process capable of removing and isolating contaminated soil below B-Cell. This remediation effort has been divided into two removal zones identified as the primary and secondary removal zones. Based on current assumptions and estimates, the primary phase of this cleanup effort will remove roughly 156.45 m{sup 3} of highly contaminated materials. B-Cell debris, particulate grout, and the floor slab and liner comprise about 21.24 m{sup 3} of the total. The remaining 135.21 m3 will be contaminated soil. All of this material must be disposed of within the existing 324 Facility or packaged for disposal at the Hanford site. The objective of this project is to remove the B-Cell floor and highly contaminated underlying soils from beneath B-Cell using remote equipment to reduce the radiation levels and allow open-air excavation for the remaining contaminated soil. The challenges and subsequent technological solutions encountered from the Conceptual Design phase to the 100% Design Issued For Fabrication/Issued For Construction (IFF/IFC) consisted in part of the following: Design an efficient remote cleanup strategy for highly contaminated Low Level Waste (LLW) given the unknowns. Maintain contamination control down to 18 feet below B-Cell in a highly radioactive environment (12,870 R/Hr Cs-137 and Sr-90). Perform facility upgrades to enable remediation process implementation while maintaining integrity of pre-existing facility structure and license. Designing first-of-a-kind remote equipment for use in high radiation areas. Developing first-of-a-kind operations sequences for remote equipment while minimizing usage of original facility equipment (i.e. cranes, manipulators, etc.). Conducting time-motion studies of operations sequences to maximize efficiency while keeping dose As Low As Reasonably Achievable (ALARA) in a high dose environment. Construction of a full scale mockup to conduct performance testing in a clean environment and train the work force to operate the equipment. Overcoming scope, budget and schedule constraints associated with a fast-track DOE project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

42 ENGINEERING↗

Material Open Test Assembly Specimen Retrieval from Hanford's Shielded Material Facility

Hanford’s 324 Building, the Shielded Material Facility (SMF), was developed to provide containment for research and fabrication development studies on highly radioactive metallic and ceramic nuclear reactor fuels and structural materials. Between 1983 and 1992, the SMF was used in support of the Department of Energy (DOE)-funded Fast Flux Test Facility (FFTF) Materials Open Test Assembly (MOTA) program. In this program, metallurgical specimens were irradiated in FFTF and then sent to SMF for processing and storage in two cabinets. This effort was abruptly ended in early 1990s due to programmatic shifts within the DOE, leaving many specimens unexamined. In recent years, these specimens have become of high value to new DOE programs. Pacific Northwest National Laboratory (PNNL) was tasked with retrieving specimens from one of the cabinets in support of fuel clad and duct development for the Advanced Fuel Cycle Initiative. Cesium contamination of the cell and failure of the overhead crane system utilized for opening the cabinets prevented PNNL from using the built-in hot cell equipment to gain access to the cabinets. PNNL designed and tested a lifting device to fit through a standard 10 inch diameter mechanical manipulator port in the SMF South Cell wall. The tool was successfully deployed in June 2008 with the support of Washington Closure Hanford.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Recommendation for Reclassification (Closure) of the Washington South, Kansas, Site (TR-17-08)

The City of Washington is located in central Washington County, Kansas, approximately 50 mi northwest of Manhattan, Kansas, and 22 mi west of Marysville (Figure 1.1). From 1950 until the mid-1970s, the Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) operated a grain storage facility on private property located approximately 0.5 mi south of the town, in an area that has subsequently been developed by the city as an industrial park.

54 ENVIRONMENTAL SCIENCES↗

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Environmental Restoration Disposal Facility Lessons Learned

The purpose of lessons learned is to identify insight gained during a project – successes or failures – that can be applied on future projects. Lessons learned can contribute to the overall success of a project by building on approaches that have worked well and avoiding previous mistakes. Below are examples of lessons learned during ERDF’s ARRA-funded expansion project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

618-10 Burial Ground Trench Remediation and 618-10 and 618-11 Burial Ground Nonintrusive Characterization of Vertical Pipe Units Lessons Learned

A “lessons learned” is a noteworthy practice or innovative approach that is captured and shared to promote repeat application, or an adverse work practice/experience that is captured and shared to avoid reoccurrence. This document provides the lessons learned identified by the 618-10 Burial Ground trench remediation and the 618-10 and 618-11 Burial Ground nonintrusive characterization of the vertical pipe units (VPUs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater and Leachate Monitoring and Sampling at ERDF (CY 2010)

The purpose of this annual monitoring report is to evaluate the conditions of and identify trends for groundwater beneath the ERDF and report leachate results in fulfillment of the requirements specified in the ERDF ROD 2 and the ERDF Amended ROD (EPA 1999). The overall objective of the groundwater monitoring program is to determine whether ERDF has impacted the groundwater. This objective is complicated by the fact that the ERDF is situated downgradient of the numerous groundwater contamination plumes originating from the 200 West Area.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site

The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

100 Area↗

Data Summary Report for the Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington

This data summary report summarizes the investigation results to evaluate the nature and distribution of Hanford Site-related contaminants present in the Columbia River. As detailed in DOE/RL-2008-11, more than 2,000 environmental samples were collected from the Columbia River between 2008 and 2010. These samples consisted of island soil, sediment, surface water, groundwater upwelling (pore water, surface water, and sediment), and fish tissue.

54 ENVIRONMENTAL SCIENCES↗

100-F Target Analyte List Development for Soil

This report documents the process used to identify source area target analytes in support of the 100-F Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

100-F↗

100-N Area Decision Unit Target Analyte List Development for Soil

This report documents the process used to identify source area target analytes in support of the 100-N Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

100-N↗