Search NASA⌕ Search

SEARCH · Search NASA

Results for “complex project costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Rapidly Deployable Acoustic Monitoring and Localization System Based on a Low-Cost Wave Buoy Platform

The primary objective of this project is to develop a cost-effective, fit-for-purpose environmental monitoring system, “NoiseSpotter®,” that characterizes, classifies, and provides accurate location information for anthropogenic and natural sounds in near real-time. NoiseSpotter was developed to support the evaluation of potential acoustic effects of marine energy (ME) projects. By utilizing a compact array of three acoustic particle motion sensors, NoiseSpotter triangulates individual bearings to provide sound source localization to within 5% accuracy, allowing the ability to discern ME device sounds relative to other confounding sounds in the environment, while providing location estimates to nearby marine mammals for environmental mitigation purposes. The ME industry needs proven solutions to meet environmental impact assessment needs. The NoiseSpotter® includes off-the-shelf, modular components that are easy to assemble and disassemble. Its acoustic particle motion sensors are commercially available and the data logger and real-time telemetry system is designed to be plug-and-play. The entire system is relatively compact and can be deployed from small vessels. NoiseSpotter’s near real-time capability enables operational monitoring of ME sounds, particularly during early stages of technology adoption to facilitate mitigation of potential noise effects. Widespread adoption of the technology for acoustic monitoring of ME devices requires that it be cost effective; hence the anticipated commercial cost of system hardware is $35,000. This project contributes to reducing barriers to ME testing through support of scientific research focused on reducing or mitigating environmental risks and lowering costs and complexity of environmental monitoring. This project has developed an acoustic monitoring system, NoiseSpotter® (U.S. Patent No. 11,156,734 and U.S. Registered Trademark No. 6,442,313), to detect and characterize baseline noise and sounds from ME operations and support geolocation of detected sounds. The intended outcome of the project is to mitigate concerns about the potential for ME device noise to alter marine mammal or fish behavior. NoiseSpotter® enables cost-effective, near real-time acoustic monitoring of an operational ME device relative to ambient environmental noise and provides a technical basis for ME developers seeking to navigate the permitting process in an efficient manner.

16 TIDAL AND WAVE POWER↗

(abstract) Science-Project Interaction in the Low-Cost Mission

Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

mission operation science community interaction co↗

DeepLynx Ecosystem 2025

Poor data integration and governance continue to plague complex engineering projects, resulting in missed cost, schedule, and performance targets. Departments operate in isolated systems with manual data exchange, creating fragmented information that compounds errors and leads to significant delays and cost overruns. The DeepLynx ecosystem addresses these challenges through an open-source, modular data management platform that transforms fragmented project data into an integrated digital thread. Built on a federated microservice architecture, the ecosystem comprises seven specialized tools centered around DeepLynx Nexus, a unified data catalog with hierarchical organization and graph-based navigation capabilities. The ecosystem includes: DeepLynx Stream for real-time timeseries data ingestion from industrial sources; DeepLynx Ingest for governed data uploads with formal review workflows; DeepLynx Lattice for ontology-based entity and relationship extraction; DeepLynx Run for workflow orchestration and secure AI/ML compute; DeepLynx Visualize for 3D digital twin visualization; and DeepLynx Insight for AI-assisted document analysis with traceable, grounded responses. Deployable in cloud, on-premise, or hybrid environments using containerized Docker applications and Helm charts, the DeepLynx ecosystem provides flexible infrastructure that adapts to organizational requirements. By consolidating project data into a unified data lake with role-based access controls and OAuth2 authentication, DeepLynx enables digital thread and digital twin capabilities that improve decision-making, reduce risk, and support complex engineering workflows throughout the project lifecycle.

42 - ENGINEERING↗

Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

Zapata, Edgar↗

Wound Field and Hybrid Synchronous Machines for EV Traction with Brushless Capacitive Rotor Field Excitation (Final Report)

This project focused on the development of wound field synchronous machines (WFSMs) and hybrid excitation synchronous machines (HESMs) with brushless capacitive power transfer for the field excitation. The target application for the machines developed is the main traction motor in electric vehicles. The magnetization in these types of machines is provided by a field winding on the rotor which is excited with DC current. The magnetization level in the machine can be varied by changing the magnitude of the field current. The variable magnetization or field is one of the key features of WFSMs. WFSMs are commonly used as generators however they have several attractive features for automotive traction applications. 1) No use of permanent magnet: Rare earth permanent magnets are primarily mined and processed in China. They have been subject to large price and supply variations and their export may be restricted during times of geopolitical tension. 2) Easy field weakening: Wound field synchronous machines have complete control of their field excitation. With proper design, this type of machine can electromagnetically have an infinite constant power speed range. 3) High power factor: With proper choice of the field excitation, WFSMs may be operated with high or even unity power factor. This potentially allows for the inverter connected to the stator winding to be downsized. In comparison induction machines and interior permanent magnet synchronous machines must supply reactive power to the stator increasing the kVA rating and cost of the inverter. 4) Reduced iron losses at high speed: By reducing the field excitation, the iron loss in the stator can be reduced. This is in comparison to interior permanent magnet synchronous machines which must use stator current to buck or reduce the flux produced by the permanent magnets. Generally, WFSMs have their highest efficiency at high speed. 5) Torque output at high temperatures: The magnetization provided by the field winding only depends on the field current and not on the field winding temperature. This is in contrast to permanent magnet machines where the permanent magnet flux decreases as the magnet temperature increases. Historically a number of approaches have been developed to provide DC current to the rotating field winding in WFSM’s including brushes and slip rings, low frequency brushless exciters, and high frequency rotary transformers and rectifiers. In this project, a different approach was used: brushless capacitive power transfer. Brushless capacitive power transfer uses two sets of rotating capacitors or electrodes in which an AC electric field is established by a high frequency inverter. A displacement current can flow through the airgap in the rotating capacitors which is rectified on the rotor using a diode bridge. The potential advantage of capacitive power transfer is that there is no need for heavy iron to guide magnetic flux. The electric flux lines terminate on the charges on the rotary capacitor surfaces. This should also limit the electric field outside the rotary capacitor airgaps. The main challenge with capacitive power transfer is that the capacitance and surface area of the rotating capacitors is small. Because capacitive power transfer systems are essentially a dual of a magnetic system, an Ampere per Hertz relationship is characteristic versus a Volts per Hertz relationship. A very high frequency power inverter must be used to provide sufficient excitation to the field winding. The concept of using capacitive power transfer to excite a high performance WFSM was initially developed in a previous U.S.A. Dept. of Energy project, DE-EE0006829. This project focused on increasing the power density of the WFSMs and reducing the cost and manufacturing complexity of the capacitive power transfer system. This project has demonstrated that WFSMs with brushless capacitive field power transfer can provide a high-power density and low-cost automotive powertrain technology.

33 ADVANCED PROPULSION SYSTEMS↗

Application of composites to helicopter airframe and landing gear structures

A preliminary design study has indicated that advanced composite helicopter airframe structures can provide significant system cost advantages in the 1980's. A seven percent increase in productivity and a five percent reduction in life cycle cost are projected. Due to their complexity, landing gear structures do not substantially benefit from the use of advanced composites. The most successful concept was found to be all-molded composite modular panels, which provide integral skin/stringer and frame subassemblies. These subassemblies significantly reduce the number of parts relative to present construction. The subassemblies are mechanically jointed together for economical, rapid final assembly and permit field replacement in the event of major damage.

Rich, M. J.↗

The Chilling Effects of Administrative Burden on Efficiency Policy Uptake: Examining the Case of Federal ESAs

Utilizing policies and programs which incentivize energy efficiency or on-site renewables is difficult. The challenges and costs associated with researching these policies, interacting with their providers, and ensuring regulatory compliance can be collectively referred to as administrative burden. To better understand the impact of administrative burden on energy efficiency policies, we investigated the administrative burden associated with energy sales arrangements (ESA). ESAs are a contracting vehicle related to energy savings performance contracts where an energy services company designs and constructs a renewable energy system at a federal site, transferring ownership of those generating assets to the site after a 20-year term. We conducted a series of in-depth interviews with a variety of relevant ESA stakeholders, including federal project managers, subject matter experts, and energy service companies. We then augmented these interviews with a review of the relevant literature. This research indicated that the current level of administrative burden decreases the adoption of renewable energy through ESAs by the federal government by raising upfront costs, depressing project attempts due to complexity, and introducing delays and challenges in successfully implemented projects. This chilling effect is especially pronounced in new policy vehicles and with inexperienced implementers. Findings from the specific case of ESAs can be generalized to other types of energy policy including efficiency programs. Policy makers decrease the efficacy of initiatives through increased administrative burden, and these effects will be most pronounced in programs with novel design or targeted at unfamiliar audiences.

Newkirk, Alex↗

Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

Comstock, Douglas A.↗

Five grand challenges of offshore wind financing in the United States

Offshore wind energy has the potential to play a critical role in fostering a renewable energy transformation in the United States. This owes to its massive technical potential, strategic location near densely populated coastlines, and - relative to onshore wind and solar - high capacity factors and consistent production. The Biden Administration's target to build 30 GW of offshore wind capacity by 2030 (from 0.04 GW today) requires the creation and swift development of a new industry that interlinks the wind and power industries with the maritime sector. Critical to its success is financing. While financial capital is abundant, deploying it for offshore wind faces major challenges. We identify and describe five grand challenges affecting offshore wind finance in the U.S. Failing to address these challenges may put deployment targets at risk. The challenges include (1) Early years financing: navigating the complexities, timing mismatches, and high costs of projects in the development phase; (2) Policy support for project financial solvency: addressing the uncertainty and systematic transfers of tax credits away from offshore wind, characteristic of the U.S. Investment Tax Credit; (3) Workforce development: building a skilled workforce for an emerging market; (4) Transmission and integration barriers: upgrading the power grid to reliably support large scale offshore wind integration; and (5) Floating wind development: financing the development and scale-up of floating offshore wind technologies. The second challenge has already been solved to a large extent by the Inflation Reduction Act.

17 WIND ENERGY↗

Sensitivity analysis of numerical modeling input parameters on floating offshore wind turbine loads

Abstract. Floating wind turbines must withstand a unique and challenging set of loads from the wind and ocean environment. To de-risk development, accurate predictions of these loads are necessary. Uncertainty in modeling predictions leads to larger required safety factors, increasing project costs and the levelized cost of energy. Complex aero-hydro-elastic modeling tools use many input parameters to represent the wind, waves, current, aerodynamic loads, hydrodynamic loads, and structural properties. It is helpful to understand which of these parameters ultimately drives a design. In this work, an ultimate and fatigue-proxy load sensitivity analysis was performed with 35 different input parameters, using an elementary effects approach to identify the most influential parameters for a case study involving the National Renewable Energy Laboratory (NREL) 5 MW baseline wind turbine atop the OC4-DeepCwind semisubmersible during normal operation. The importance of each parameter was evaluated using 14 response quantities of interest across three operational wind speed conditions. The study concludes that turbulent wind velocity standard deviation is the parameter with the strongest sensitivity; this value is important not just for turbine loads, but also for the global system response. The system center of mass in the wind direction is found to have the highest impact on the system rotation and tower loads. The current velocity is found to be the most dominating parameter for the system global motion and consequently the mooring loads. All tested wind turbulence parameters in addition to the standard deviation are also found to be influential. Wave characteristics are influential for some fatigue-proxy loading but do not significantly impact the extreme ultimate loads in these operational load cases. The required number of random seeds for stochastic environmental conditions is considered to ensure that the sensitivities are due to the input parameters and not due to the seed. The required number of analysis points in the parameter space is identified so that the conclusions represent a global sensitivity. The results are specific to the platform, turbine, and choice of parameter ranges, but the demonstrated approach can be applied widely to guide focus in parameter uncertainty.

17 WIND ENERGY↗

A Decision Tool that Combines Discrete Event Software Process Models with System Dynamics Pieces for Software Development Cost Estimation and Analysis

The development process for a large software development project is very complex and dependent on many variables that are dynamic and interrelated. Factors such as size, productivity and defect injection rates will have substantial impact on the project in terms of cost and schedule. These factors can be affected by the intricacies of the process itself as well as human behavior because the process is very labor intensive. The complex nature of the development process can be investigated with software development process models that utilize discrete event simulation to analyze the effects of process changes. The organizational environment and its effects on the workforce can be analyzed with system dynamics that utilizes continuous simulation. Each has unique strengths and the benefits of both types can be exploited by combining a system dynamics model and a discrete event process model. This paper will demonstrate how the two types of models can be combined to investigate the impacts of human resource interactions on productivity and ultimately on cost and schedule.

Mizell, Carolyn Barrett↗

Space Station Facility government estimating

This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.

Brown, Joseph A.↗

Estimating and bidding for the Space Station Processing Facility

This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 10 more ways the low bidder got low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.

Brown, Joseph A.↗

Robust, Accurate, and Efficient: Quantum Embedding Using the Huzinaga Level-Shift Projection Operator for Complex Systems

Using wave function (WF) in density functional theory (DFT) embedding methods provides a framework for performing localized, high-accuracy WF calculations on a system, while not incurring the full computational cost of the WF calculation on the full system. To effectively partition a system into localized WF and DFT subsystems, we utilize the Huzinaga level-shift projection operator within an absolutely localized basis. In this work, we study the ability of the absolutely localized Huzinaga level-shift projection operator method to study complex WF and DFT partitions, including partitions between multiple covalent bonds, a double bond, and transition-metal–ligand bonds. We find that our methodology can accurately describe all of these complex partitions. Additionally, we study the robustness of this method with respect to the WF method, specifically where the embedded systems were described using a multiconfigurational WF method. We found that the method is systematically improvable with respect to both the number of atoms in the WF region and the size of the basis set used, with energy errors less than 1 kcal/mol. Additionally, we calculated the adsorption energy of H2 to a model of an iron metal–organic framework (Fe-MOF-74) to within 1 kcal/mol compared to CASPT2 calculations performed on the full model while incurring only a small fraction of the full computational cost. In conclusion, this work demonstrates that the absolutely localized Huzinaga level-shift projection operator method is applicable to very complex systems with difficult electronic structures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Autonomous Cryogenic Leak Detector for Improving Launch Site Operations

NASA, military, and commercial satellite users need launch services that are highly reliable, less complex, easier to test, and cost effective. This project has developed a tapered optical fiber sensor for detecting hydrogen. The invention involves incorporating chemical indicators on the tapered end of an optical fiber using organically modified silicate nanomaterials. The Hazardous Gas Detection Lab (HGDL) at Kennedy Space Center is involved in the design and development of instrumentation that can detect and qualify various mission-critical chemicals. Historically, hydrogen, helium, nitrogen, oxygen, and argon are the first five gases of HGDL focus. The use of these cryogenic fluids in the area of propulsion offers challenges. Due to their extreme low temperatures, these fluids induce contraction of the materials they contact, a potential cause of leakage. Among them, hydrogen is of particular concern. Small sensors are needed in multiple locations without adding to the structural weight. The most vulnerable parts of the engine are the connection flanges on the transfer lines, which have to support cycles of large thermal amplitude. The thermal protection of the engine provides a closed area, increasing the likelihood of an explosive atmosphere. Thus, even a small leak represents an unacceptable hazardous condition during loading operations, in flight, or after an aborted launch. Tapered fibers were first fabricated from 1/1.3-mm core/cladding (silica/ plastic) optical fibers. Typically a 1-ft (approx. 30- cm) section of the 1-mm fiber is cut from the bundle and marked with a pen into five 2-.-in. (.5.7-cm) sections. A propane torch is applied at every alternate mark to burn the jacket and soften the glass core. While the core is softening, the two ends of the fiber are pulled apart slowly to create fine tapers of .- to .-in. (.6- to 12-mm) long on the 1-mm optical fiber. Following this, the non-tapered ends of the fibers are polished to a 0.3-micron finish. Then these fibers were coated with indicators sensitive to hydrogen. The tapered hydrogen detection system with its unique flexibility is the only system that can be placed in many locations inside the vehicles and detect the exact location of leaks, saving millions of dollars for launch vehicle industries.

Goswami, Kisholoy↗

Plasma-Assisted Pre-Chamber Ignition System for Highly Dilute Stoichiometric Heavy-Duty Natural Gas Engines (Final Technical Report)

This project explored advanced ignition technologies to significantly enhance efficiency and reduce operating costs for heavy-duty natural gas engines operating at stoichiometric conditions, while meeting ultra-low NOx emission standards. The main goal was to develop and validate a plasma-assisted pre-chamber ignition system that could deliver at least a 2% increase in brake thermal efficiency (BTE) and a 4% decrease in total cost of ownership (TCO) compared to a typical multi-cylinder engine with three-way catalyst aftertreatment, ensuring compatibility with the expected 2027 EPA/CARB regulations. In the first half of the project, the research team concentrated on developing and testing plasma-assisted pre-chamber ignition using nanosecond pulsed discharges. Extensive experiments were conducted in an optically accessible rapid-compression and expansion machine, a constant-volume chamber, and an optical single-cylinder engine. Experiments were coupled with CFD simulations. The work produced unique insights into pre-chamber flame formation, jet ignition, dilution effects, and flame quenching at pressures, temperatures, and dilution levels relevant to engines. Although plasma-assisted ignition showed promise in controlled lab settings, the research also identified fundamental and practical challenges when applying this technology to real engine conditions. Midway through the project, a crucial pivot was made, guided by three key findings. First, the power electronics required for nanosecond plasma discharges were found to be too costly for commercial use, undermining the project’s cost-of-ownership goals. Second, nanosecond plasma ignition was highly sensitive to turbulent flow in the pre-chamber, resulting in lower ignition reliability than traditional spark under engine-like conditions. Third, achieving a truly diffuse low-temperature plasma at high pressures near top dead center was not possible, reducing the anticipated chemical enhancement benefits. These results collectively suggested that continuing with plasma-assisted ignition was unlikely to meet both efficiency and cost objectives. In response, the project shifted focus to a more realistic approach: enhancing traditional spark-based pre-chamber ignition with significantly less spark energy. Using insights gained earlier in the project, the team redesigned the pre-chamber to maintain high dilution tolerance and quick combustion, even with lower ignition energy. Testing confirmed that with optimized pre-chamber design and combustion timing, a lower-energy spark could reliably ignite highly diluted stoichiometric mixtures, reduce burn time, and boost thermal efficiency. Final engine testing and techno-economic analysis verified that this revised approach successfully achieved the project goals. The optimized pre-chamber ignition system provided over a 2% increase in calculated brake thermal efficiency compared to the baseline engine. Notably, the lower ignition energy and simplified hardware reduced component stress, extended maintenance intervals, and lowered the total cost of ownership. When used with stoichiometric operation and traditional three-way aftertreatment, the system remained compatible with near-zero NOx emissions targets without increasing cost or complexity in the emissions control system. In summary, although the project deviated from its initial plasma-assisted ignition idea, the work produced a more practical and commercially viable solution. The results show that precisely optimized, low-energy pre-chamber spark ignition can significantly improve efficiency and reduce overall ownership costs for heavy-duty natural gas engines. This directly aligns with DOE goals for cleaner, more efficient, and cost-effective transportation technologies.

03 NATURAL GAS↗

Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

Thomas, LeAnn↗

Modelling the Liquid Waste Operation at the Savannah River Site

Modeling Successes Dounreay – Site Closure Optimization and Risk Reduction Re-structuring and streamlining a complex project plan to achieve site decommissioning in reduced time and at reduced cost, through automated task prioritization. Idaho AMWTP – Multi-stream Optimization Speeding up a complex facility with many process lines, by utilizing all of the process lines more efficiently and reducing overall plant downtime, by coordinating repairs and shutdowns. AWE –Waste Repackaging and Relocation Relocating schedule for waste material from an old storage facility to a new purpose-built one, safely, and in a timely fashion that removed the need to reassure the safety of the old facility. Sellafield – Effluent, Sludge and HAW Treatment Improving a wide range of chemical engineered processes including aqueous effluent treatment, chemically-reactive sludge management and waste vitrification processing. Strategic Petroleum Reserve – Cavern Management Linking chemistry models of petroleum prediction, through engineering cavern management to financial modeling of gasoline sales to benefit US government

Jung, Andrew W.↗