Search NASASearch

SEARCH · Search NASA

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Contingency Planning for the Microwave Anisotropy Probe Mission

The Microwave Anisotropy Probe (MAP) utilized a phasing loop/lunar encounter strategy to achieve a small amplitude Lissajous orbit about the Sun-Earth/Moon L2 libration point. The use of phasing loops was key in minimizing MAP's overall deltaV needs while also providing ample opportunities for contingency resolution. This paper will discuss the different contingencies and responses studied for MAP. These contingencies included accommodating excessive launch vehicle errors (beyond 3 sigma), splitting perigee maneuvers to achieve ground station coverage through the Deep Space Network (DSN), delaying the start of a perigee maneuver, aborting a perigee maneuver in the middle of execution, missing a perigee maneuver altogether, and missing the lunar encounter (crucial to achieving the final Lissajous orbit). It is determined that using a phasing loop approach permits many opportunities to correct for a majority of these contingencies.

Mesarch, Michael A.

Incremental Contingency Planning

There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard

Orbiter Repair Maneuver Contingency Separation Methods and Analysis

Repairing damaged thermal protection system tile requires the Space Shuttle to be oriented such that repair platform access from the International Space Station (ISS) is possible. To do this, the Space Shuttle uses the Orbiter Repair Maneuver (ORM), which utilizes the Shuttle Remote Manipulator System (SRMS) to rotate the Space Shuttle in relation to the ISS, for extended periods of time. These positions cause difficulties and challenges to performing a safe separation (no collision or thruster plume damage to sensitive ISS structures) should an inadvertent release occur or a contingency procedure require it. To help protect for an SRMS failure or other failures, a method for separating without collision and the ability to redock to ISS from the ORM configuration was needed. The contingency ORM separation solution elegantly takes advantage of orbital mechanics between ISS and the separating Space Shuttle. By pitching the ISS down approximately 45 degrees, in a majority of the ORM repair positions, the altitude difference between the ISS and Space Shuttle center of gravity is maximized. This altitude difference results in different orbital energies (orbital periods) causing objects to separate from each other without requiring translational firings. Using this method, a safe contingency ORM separation is made possible in many odd positions even though some separation positions point high powered thrusters directly at fragile ISS and Soyuz solar arrays. Documented in this paper are the development simulations and procedures of the contingency ORM separation and the challenges encountered with large constraints to work around. Lastly, a method of returning to redock with the ISS to pick up the stranded crew members (or transfer the final crew members) is explained as well as the thruster and ISS loads analysis.

Machula, Michael

Thoughts Without Content are Empty, Intuitions Without Concepts are Blind - Determinism and Contingency Revisited

Was the emergence of life a predictable outcome of chemical evolution on earth? Could evolution produce life very different from ours? These are one of the oldest questions in the field of the origin of life that not only have broad philosophical implications but also impact how we approach the problem from the methodological standpoint. Framing the issue in terms of the dichotomy between contingency and determinism is not a fortunate because these two terms in their conventional meaning are neither mutually exclusive nor jointly exhaustive. Determinism, represented in natural sciences by Newtonian physics, relies on the assumption that every event is causally determined by a chain of previous events. In the context of the origin of life it means that once the initial conditions on the early earth have been specified further evolution follows inevitably. Considering uncertainties about conditions on the prebiotic earth, many plausible sets of initial conditions can be defined, each followed by a separate deterministic trajectory. This conventional understanding of determinism does not admit contingency. Further, it has no implications for evaluating how many sets of initial conditions lead to the emergence of life. It appears that a better framing of the problem is as follows: given plausible sets of initial conditions on the early earth how probable and broadly spread are evolutionary trajectories that lead to life? Instead of undertaking an impossible task of specifying microscopic initial conditions for all components of the system one uses a reduced representation of this system and specify only a small set of essential macroscopic parameters, values (or ranges of values) of which can be identified, inferred or estimated from experiment, theory or historical record. The following evolutionary trajectories are still governed by laws of physics and chemistry but become probabilistic and "contingency" is admitted as variations in other variables in the system. A similar reasoning is common in other fields of science, for example in statistical mechanics. Some trajectories lead to life, perhaps in different forms, whereas others do not. Of our true interest is the ratio of these two outcomes. The issue of determinism does not directly enter the picture. The debate about the likelihood of the emergence of life is quite old. One view holds that the origin of life is an event governed by chance, and the result of so many random events (contingencies) is unpredictable. This view was eloquently expressed by Monod. In his book "Chance or Necessity" he argued that life was a product of "nature's roulette." In an alternative view, expressed in particular by deDuve and Morowitz, the origin of life is considered a highly probable or even inevitable event (although its details need not be determined in every respect). Only in this sense the origin of life can be considered a "deterministic event".

Pohorille, Andrew

Resource Management and Contingencies in Aerospace Concurrent Engineering

significant concern in designing complex systems implementing new technologies is that while knowledge about the system is acquired incrementally, substantial financial commitments, even make-or-break decisions, must be made upfront, essentially in the unknown. One practice that helps in dealing with this dichotomy is the smart embedding of contingencies and margins in the design to serve as buffers against surprises. This issue presents itself in full force in the aerospace industry, where unprecedented systems are formulated and committed to as a matter of routine. As more and more aerospace mission concepts are generated by concurrent design laboratories, it is imperative that such laboratories apply well thought-out contingency and margin structures to their designs. The first part of this publication provides an overview of resource management techniques and standards used in the aerospace industry. That is followed by a thought provoking treatise on margin policies. The expose presents the actual flight telemetry data recorded by the thermal discipline during several recent NASA Goddard Space Flight Center missions. The margins actually achieved in flight are compared against pre-flight predictions, and the appropriateness and the ramifications of having designed with rigid margins to bounding stacked worst case conditions are assessed. The second half of the paper examines the particular issues associated with the application of contingencies and margins in the concurrent engineering environment. In closure, a discipline-by-discipline disclosure of the contingency and margin policies in use at the Integrated Design Center at NASA s Goddard Space Flight Center is made.

Karpati, Gabe

Benchmark Problem Development for Testing Maturity of Intelligent Contingency Management Tools

This paper presents a process used to develop appropriate scenarios and metrics for evaluating the maturity of intelligent contingency management algorithms. A benchmark scenario is a reference point against which something can be measured, compared, or assessed. Creating an accurate benchmark requires considerable research and expertise. The scenario itself is an artificial representation of a real-world event, designed to achieve a set of learning objectives through experiential learning. Designing an effective benchmark simulation scenario requires careful planning, including identification of clear objectives; capability assessment of the algorithm/tool being evaluated; assessment of necessary levels of fidelity; development of a process flow map of events and event interactions; and identification of metrics that map back to objectives. Thus, a benchmark scenarios for contingency management might consist of one or several commonly used functions taken from real world applications, used for evaluation, characterization and performance measurement of a contingency management algorithm. Behavior of the contingency management algorithm under different environmental conditions should then be able to be predicted using a set of benchmark functions. The paper describes the resulting benchmark problem as an illustration of the application of this process.

Jon Holbrook

Time Course of Effects of Carbon Dioxide Exposure on Physical and Cognitive Performance in a Simulated Surface Extravehicular Activity Contingency Scenario

INTRODUCTION Carbon dioxide (CO 2 ) is a metabolic byproduct produced by humans that must be scrubbed from the atmosphere by environmental control and life support systems in space vehicles and spacesuits to prevent buildup. Current nominal CO 2 limits are set by NASA Standard 3001, however, limits during contingency situations are not specified. The purpose of this study was to characterize and quantify the physiological, cognitive, and self-assessed symptom and performance metrics as a function of inspired CO 2 (P I CO 2 ) during a simulated 1-hour contingency lunar EVA scenario in virtual reality (VR). METHODS Fifteen healthy subjects completed 7 simulated EVA scenarios walking on a passive treadmill for one hour breathing dry, ambient air mixed with added CO 2 in a blind, counterbalanced manner (P I CO 2 : 0, 5, 10, 15, 20, 25, 30 mmHg) simulating a 2.0 km contingency EVA walkback to a habitat on the lunar surface in the event of a CO 2 scrubber malfunction. Subjects were immersed in a Lunar VR environment and asked to maintain their walking speed between 2.1 km/h and an upper limit individually calibrated to a fixed metabolic workload of 1.3 L/min of O 2 consumption, and performed periodic cognitive tasks and continuous cardiopulmonary measurements. Self-assessments of symptoms and task performance were measured via verbal Likert-scale survey at the onset of the walkback and at 10-minute intervals thereafter. RESULTS The time course of cardiopulmonary, cognitive, and self-reported responses at each level of P I CO 2 will be presented. All 15 subjects were able to complete the 1-hr walk back task at all CO 2 levels. Physiological responses were rapid, typically within 1 to 5 minutes. No effects of time were detected for cognitive measures. Symptomatic ratings of headache, shortness of breath, and fatigue demonstrated a time-course development, reaching asymptote after 40 minutes of CO 2 exposure. DISCUSSION These findings will inform the posture of risk associated with CO 2 exposure on human health and performance during microgravity and planetary surface operations, This will help inform decisions related to space suit and environmental life support hardware requirements and EVA operational limits for contingency extravehicular activity (EVA) scenarios.

carbon dioxide

Wind Turbine Contingency Control Through Generator De-Rating

Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbines with contingency control to balance the trade-offs between maintaining system health and energy capture. The contingency control involves de-rating the generator operating point to achieve reduced loads on the wind turbine. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

condition monitoring

Automated Management of Small Unmanned Aircraft System Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation System (UAS) Traffic Management

Automated Management of Small Unmanned Aircraft System (UAS) Communications and Navigation Contingency

The number of small Unmanned Aircraft System (sUAS) operating in the low-altitude of the National Airspace System (NAS) has been rapidly increasing in the past few years and this number is expected to grow in the future. However, aside from a few special cases, all sUAS must fly within visual line-of-sight (VLOS) of their operators and this limitation is blocking highly anticipated beyond visual line-of-sight (BVLOS) sUAS applications such as package delivery from practice. To enable routine low-altitude BVLOS operations, there needs to be a traffic management ecosystem that complements the FAA’s Air Traffic Management (ATM) system, which does not provide air traffic services under 400 feet above ground level (AGL). NASA has been pioneering research and development of this ecosystem under UAS Traffic Management (UTM) project since 2015 in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting, and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for BVLOS operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 is building on the earlier TCLs and focuses on technologies and requirements for operations in higher-density urban areas for tasks such as newsgathering and package delivery and for managing large-scale contingencies. To coordinate and facilitate the incremental implementation of the UTM ecosystem in the NAS, a Research Transition Team (RTT) has been formed between the FAA, NASA, and industry. The RTT is divided into four subgroups, concept and use case development, data exchange and information architecture, sense and avoid, and communications and navigation (C&N). This paper focuses on C&N subgroup activities, in particular about the development of automated sUAS communications and navigation contingency management. The goal of this development is to prepare sUAS to display predictable behavior while handling C&N off-nominal events. It is expected that the adoption of the presented automated contingency management by the sUAS community will accommodate and inform rulemaking towards governing low-altitude BVLOS operations.

Unmanned Aviation Systems (UAS) Traffic Management

Effect of Carbon Dioxide Exposure on Physical and Cognitive Performance in A Simulated Spaceflight Contingency Scenario

INTRODUCTION: Carbon dioxide (CO2) produced by astronauts inside space suits can accumulate to levels that may affect health and performance. The human health and performance risks associated with different levels of CO2 exposure in the flight environment remain an area of debate. The purpose of this study is to characterize the limit of acceptable performance (cognitive and physical) decrements and symptom severity for mission operations when subjected to elevated inspired CO2 levels in simulated contingency lunar extravehicular activity (EVA) scenarios. METHODS: This study will create a simulation of a 1-hour, ~2km contingency EVA walk back to a habitat, incorporating a passive treadmill and a fully immersive virtual reality (VR) simulation of a lunar EVA environment. Subjects will be asked to walk on a treadmill while breathing partial pressures of CO2 of 0, 5, 10, 15, 20, 25, 30mmHg for 1 hour at a time. Cognitive performance will be quantified using validated cognitive tests and measures of functional task performance embedded within the VR environment. Test subject symptoms and self-assessment of performance will be evaluated via survey. RESULTS: This study currently has approval from NASA’s Institutional Review Board and has completed the Test Readiness Review process. Next steps for this research study include test subject recruitment, data collection, and analysis. Data collection is planned for calendar year 2023 and 2024. DISCUSSION: This study will provide valuable information regarding how various partial pressures of CO2 exposure impact acute health, as well as cognitive and physical performance during simulated contingency lunar EVA. This information will enable assessment of health and performance risk associated with spacesuit systems and operations concepts for future exploration missions as well as informing definition of future standards and requirements.

carbon dioxide

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre

Improving Trustworthiness of Data-Driven Power Grid Contingency Analysis With Bayesian Residual Graph Neural Networks

The evolving energy landscape requires novel tools to efficiently perform contingency analysis and reliability assessment of power grids, potentially in real-time. The high computational cost of traditional power flow solvers limits their applicability in practice. Machine learning (ML) surrogates such as deep neural networks (NNs) accelerate power flow solvers computations, enabling high-order contingency analysis and real-time decision-making by learning highly nonlinear functions and integrating grid topology via graph architectures. However, (graph) NNs lack predictive power away from training data and do not provide predictive confidence estimates. Here, we present a Bayesian residual graph NN that integrates knowledge from low-fidelity data via residual training and embeds granular quantification of uncertainties, improving trustworthiness critical for high-consequence decision-making. Applying Bayesian concepts to NNs is challenging due to the high-dimensionality of both the parameter space, complicating derivation of a meaningful prior, and the output space in large grid systems, requiring enhanced techniques to assess the predicted high-dimensional uncertainties. Our contributions include: (1) Deriving a prior for fully connected and graph NNs that leverages low-fidelity data to guide mean predictions and appropriately control prior predictive uncertainty. (2) Integrating this prior within an ensembling with anchoring scheme for efficient approximate posterior inference. (3) Deriving enhanced metrics to assess accuracy of both the mean and uncertainty predictions in high dimensions, appropriately accounting for correlations propagated through graph layers. The resulting Bayesian residual graph NN is tested on a contingency analysis task for 14-bus and 118-bus grids.

24 - POWER TRANSMISSION AND DISTRIBUTION

Tethered Satellite System Contingency Investigation Board

The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether control mechanism and to prepare a detailed plan for hardware inspection, test, and analysis including any appropriate hardware disassembly.

Source record

Setting Spacecraft Maximum Allowable Concentrations for 1 hour or 24 hour contingency exposures to airborne chemicals

Since the early years of the manned space program, NASA has developed and used exposure limits called Spacecraft Maximum Allowable Concentrations (SMACs) to help protect astronauts from airborne toxicants. Most of these SMACS are based on an exposure duration of 7 days, since this is the duration of a 'typical' mission. A set of 'contingency SMACs' is also being developed for scenarios involving brief (1-hour or 24- hour) exposures to relatively high levels of airborne toxicants from event-related 'contingency' releases of contaminants. The emergency nature of contingency exposures dictates the use of different criteria for setting exposure limits. The NASA JSC Toxicology Group recently began a program to document the rationales used to set new SMACs and plans to review the older, 7-day SMACs. In cooperation with the National Research Council's Committee on Toxicology, a standard procedure has been developed for researching, setting, and documenting SMAC values.

Garcia, Hector D.

Optimal Limited Contingency Planning

For a given problem, the optimal Markov policy over a finite horizon is a conditional plan containing a potentially large number of branches. However, there are applications where it is desirable to strictly limit the number of decision points and branches in a plan. This raises the question of how one goes about finding optimal plans containing only a limited number of branches. In this paper, we present an any-time algorithm for optimal k-contingency planning. It is the first optimal algorithm for limited contingency planning that is not an explicit enumeration of possible contingent plans. By modelling the problem as a partially observable Markov decision process, it implements the Bellman optimality principle and prunes the solution space. We present experimental results of applying this algorithm to some simple test cases.

Meuleau, Nicolas

Endoscopic surgery and telemedicine in microgravity: developing contingency procedures for exploratory class spaceflight

OBJECTIVES: The risk of a urinary calculus during an extended duration mission into the reduced gravity environment of space is significant. For medical operations to develop a comprehensive strategy for the spaceflight stone risk, both preventive countermeasures and contingency management (CM) plans must be included. METHODS: A feasibility study was conducted to demonstrate the potential CM technique of endoscopic ureteral stenting with ultrasound guidance for the possible in-flight urinary calculus contingency. The procedure employed the International Space Station/Human Research Facility ultrasound unit for guide wire and stent localization, a flexible cystoscope for visual guidance, and banded, biocompatible soft ureteral stents to successfully stent porcine ureters bilaterally in zero gravity (0g). RESULTS: The study demonstrated that downlinked endoscopic surgical and ultrasound images obtained in 0g are comparable in quality to 1g images, and therefore are useful for diagnostic clinical utility via telemedicine transmission. CONCLUSIONS: In order to be successful, surgical procedures in 0g require excellent positional stability of the operating surgeon, assistant, and patient, relative to one another. The technological development of medical procedures for long-duration spaceflight contingencies may lead to improved terrestrial patient care methodology and subsequently reduced morbidity.

Parabolic Flight

Haughton-Mars Project/NASA 2006 Lunar Medical Contingency Simulation: Equipment and Methods for Medical Evacuation of an Injured Crewmember

Introduction: Achieving NASA's Space Exploration Vision scientific objectives will require human access into cratered and uneven terrain for the purpose of sample acquisition to assess geological, and perhaps even biological features and experiments. Operational risk management is critical to safely conduct the anticipated tasks. This strategy, along with associated contingency plans, will be a driver of EVA system requirements. Therefore, a medical contingency EVA scenario was performed with the Haughton-Mars Project/NASA to develop belay and medical evacuation techniques for exploration and rescue respectively. Methods: A rescue system to allow two rescuer astronauts to evacuate one in incapacitated astronaut was evaluated. The systems main components were a hard-bottomed rescue litter, hand-operated winch, rope, ground picket anchors, and a rover-winch attachment adapter. Evaluation was performed on 15-25deg slopes of dirt with embedded rock. The winch was anchored either by adapter to the rover or by pickets hammered into the ground. The litter was pulled over the surface by rope attached to the winch. Results: The rescue system was utilized effectively to extract the injured astronaut up a slope and to a waiting rover for transport to a simulated habitat for advanced medical care, although several challenges to implementation were identified and overcome. Rotational stabilization of the winch was found to be important to get maximize mechanical advantage from the extraction system. Discussion: Further research and testing needs to be performed to be able to fully consider synergies with the other Exploration surface systems, in conducting contingency operations. Structural attachment points on the surface EVA suits may be critical to assist in incapacitated evacuation. Such attach points could be helpful in microgravity incapacitated crewmember transport as well. Wheeled utility carts or wheels that may be attachable to a litter may also aid in extraction and transport. Utilizing parts of the rover (e.g. seats) to deploy as a litter may be considered. Testing in simulated 1/6-g to determine feasibility of winch operation and anchor establishment will further reduce implementation uncertainties.

Chappell, S. P.