Search NASA⌕ Search

SEARCH · Search NASA

Results for “disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Superelastic Ball Bearings: Materials and Design to Avoid Mounting and Dismounting Brinell Damage in an Inaccessible Press-Fit Application-: Design Approach - I

Ball bearings require proper fit and installation into machinery structures (onto shafts and into bearing housings) to ensure optimal performance. For some applications, both the inner and outer race must be mounted with an interference fit and care must be taken during assembly and disassembly to avoid placing heavy static loads between the balls and races otherwise Brinell dent type damage can occur. In this paper, a highly dent resistant superelastic alloy, 60NiTi, is considered for rolling element bearing applications that encounter excessive static axial loading during assembly or disassembly. A small (R8) ball bearing is designed for an application in which access to the bearing races to apply disassembly tools is precluded. First Principles analyses show that by careful selection of materials, raceway curvature and land geometry, a bearing can be designed that allows blind assembly and disassembly without incurring raceway damage due to ball denting. Though such blind assembly applications are uncommon, the availability of bearings with unusually high static load capability may enable more such applications with additional benefits, especially for miniature bearings.

tribology↗

Flight set 360T004 (STS-30)

The performance of 360T004, Forth Flight, Redesigned Solid Rocket Motors (RSRM) is assessed in respect to joint sealing issues as seen from post-test inspection of the seals and sealing surfaces. The factory joint disassembly inspections for this flight set were omitted. The decision was based on the rational that there is sufficient information in the present data base, and this would give H-7 refurbishment operations faster turn around time for this set of hardware. The factory joint disassembly inspections will resume for 360H005, Fifth Flight, through 360L007, Seventh Flight, due to a new grease application being in effect during the assembly process. The left hand nozzle was forced into the snubbed position upon splash down. This required unique tooling to be manufactured to perform the disassembly of the internal nozzle joints. This was completed on February 5 and 6, 1990 at the H-5 Clearfield, Utah facility. The RSRM consisting of capture feature, field joints with the J-joint insulation configuration is illustrated. The nozzle-to-case joint design, which includes 100, 7/8-inch radial bolts in conjunction with a wiper O-ring and modified insulation design is also illustrated, as is the ignition system seals and a cross section of the igniter. The configuration of all internal nozzle joints is shown.

Nelsen, Lowell V.↗

Postflight hardware evaluation 360T025 (RSRM-25, STS-46)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the 360T025 (STS-46) Redesign Solid Rocket Motor (RSRM) flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. Along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-60687), a summary of the 360T025 hardware evaluation is provided. The as-flown hardware configuration is documented in TWR-60470. Disassembly evaluation photograph numbers are logged in TWA-1986. The 360T025 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on 16 Mar. 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Morgan, Ferral↗

Postflight hardware evaluation 360T026 (RSRM-26, STS-47)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the 360T026 (STS-47) Redesigned Solid Rocket Motor (RSRM) flight set is provided. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64203), represents a summary of the 360T026 hardware evaluation. The as-flown hardware configuration is documented in TWR-60472. Disassembly evaluation photograph numbers are logged in TWA-1987. The 360T026 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on 12 April 1993. Detailed evaluations were performed in accordance with the Clearfield Postflight Engineering Evaluation Plan (PEEP), TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Nielson, Greg↗

Final postflight hardware evaluation report RSRM-28 (STS-53)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-28 (STS-53) RSRM flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64215), represents a summary of the RSRM-28 hardware evaluation. The as-flown hardware configuration is documented in TWR-63638. Disassembly evaluation photograph numbers are logged in TWA-1989. The RSRM-28 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on July 15, 1993. Additional time was required to perform the evaluation of the stiffener rings per special issue 4.1.5.2 because of the washout schedule. The release of this report was after completion of all special issues per program management direction. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable team and tracked through the PFAR system.

Starrett, William David, Jr.↗

Postflight hardware evaluation (RSRM-29, STS-54)

This document is the final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-29 flight set. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64221), represents a summary of the RSRM-29 hardware evaluation. Disassembly evaluation photograph numbers are logged in TWA-1990. The RSRM-29 flight set disassembly evaluations described in this document were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on September 9, 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Source record↗

The Cytoskeleton and Force Response Mechanisms

The long term aim of this project was to define the mechanisms by which cells sense and respond to the physical forces experienced at 1g and missing in microgravity. Identification and characterization of the elements of the cells force response mechanism could provide pathways and molecules to serve as targets for pharmacological intervention to mitigate the pathologic effects of microgravity. Mechanical forces experienced by the organism can be transmitted to cells through molecules that allow cells to bind to the extracellular matrix and through other types of molecules which bind cells to each other. These molecules are coupled in large complexes of proteins to structural elements such as the actin cytoskeleton that give the cell the ability to sense, resist and respond to force. Application of small forces to tissue culture cells causes local elevation of intracellular calcium through stretch activated ion channels, increased tyrosine phosphorylation and a restructuring of the actin cytoskeleton. Using collagen coated iron oxide beads and strong magnets, we can apply different levels of force to cells in culture. We have found that force application causes the cells to polymerize actin at the site of mechanical deformation and unexpectedly, to depolymerize actin across the rest of the cell. Observations of GFP- actin expressing cells demonstrate that actin accumulates at the site of deformation within the first five minutes of force application and is maintained for many tens of minutes after force is removed. Consistent with the reinforcement of the cytoskeletal structures underlying the integrin-bead interaction, force also alters the motion of bound magnetic beads. This effect is seen following the removal of the magnetic field, and is only partially ablated by actin disruption with cytochalsin B. While actin is polymerizing locally at the site of force application, force also stimulates a global reduction in actin filament content within the cells. We have examined the roles of several actin filament disassembly factors in the global reduction of cellular actin filaments. The calcium regulated actin filament severing protein gelsolin is not necessary for the increased actin turnover, as cells derived from gelsolin null and wildtype mice still show a reduction in total actin filament content. Instead, our work suggests that the actin binding protein cofilin may be important for these changes in actin dynamics. Cofilin binds to and enhances the disassembly of actin filaments. Using immunological methods, we observe transient changes in the phosphorylation state of cofilin upon force application that suggests that cofilin may mediate actin filament turnover. Early after force application, cofilin is transiently dephosphorylated, activating its actin disassembly activity. Subsequently, we find a hyper-phosphorylation of cofilin, rendering it inactive. This reduction in cofilin activity may explain the stability of the force induced actin structuttes. In testing this hypothesis, we aimed to generate cells that express the constituitively active kinase (LIM-kinase) that phosphorylates cofilin. lnidial attempts in the cell lines used for the our previous studies proved unsuccessful. While we prepare this work for pubication, we are continuing to study other cell lines and tissue sources to determine whether they show a reduction in F-actin content after force application.

Allen, Philip Goodwin↗

Problems Encountered During the Recertification of the GLORY Solar Array Dual Axis Gimbal Drive Actuators

The Glory observatory is the current incarnation of the Vegetation Canopy Lidar (VCL) mission spacecraft bus. The VCL spacecraft bus, having been cancelled for programmatic reasons in 2000, was nearly integrated when it was put into storage for possible future use. The Glory mission was a suitable candidate for using this spacecraft and in 2006 an effort to recertify the two axis solar array gimbal drive after its extended storage was begun. What was expected to be a simple performance validation of the two dual axis gimbal stepper motors became a serious test, diagnosis and repair task once questions arose on the flight worthiness of the hardware. A significant test program logic flow was developed which identified decisions that could be made based on the results of individual recertification tests. Without disassembling the bi-axial gimbals, beginning with stepper motor threshold voltage measurements and relating these to powered drive torque measurements, both performed at the spacecraft integrator s facility, a confusing picture of the health of the actuators came to light. Tests at the gimbal assembly level and tests of the disassembled actuators were performed by the manufacturer to validate our results and torque discrepancies were noted. Further disassembly to the component level of the actuator revealed the source of the torque loss.

Saltzman, Marc↗

Custom Unit Pump Design and Testing for the EVA PLSS

This paper describes the effort by the Texas Engineering Experiment Station (TEES) and Honeywell for NASA to design and test a pre-flight prototype pump for use in the Extra-vehicular activity (EVA) portable life support subsystem (PLSS). Major design decisions were driven by the need to reduce the pump s mass, power, and volume compared to the existing PLSS pump. In addition, the pump must accommodate a much wider range of abnormal conditions than the existing pump, including vapor/gas bubbles and increased pressure drop when employed to cool two suits simultaneously. A positive displacement, external gear type pump was selected because it offers the most compact and highest efficiency solution over the required range of flow rates and pressure drops. An additional benefit of selecting a gear pump design is that it is self priming and capable of ingesting non-condensable gas without becoming air locked. The chosen pump design consists of a 28 V DC, brushless, sealless, permanent magnet motor driven, external gear pump that utilizes a Honeywell development that eliminates the need for magnetic coupling. Although the planned flight unit will use a sensorless motor with custom designed controller, the pre-flight prototype to be provided for this project incorporates Hall effect sensors, allowing an interface with a readily available commercial motor controller. This design approach reduced the cost of this project and gives NASA more flexibility in future PLSS laboratory testing. The pump design was based on existing Honeywell designs, but incorporated features specifically for the PLSS application, including all of the key features of the flight pump. Testing at TEES verified that the pump meets the design requirements for range of flow rates, pressure drop, power consumption, working fluid temperature, operating time, gas ingestion , and restart capability under both ambient and vacuum conditions. The pump operated between 40 and 240 lbm/hr flowrate, 35 to 100 F pump temperature range, and 5 to 10 psid pressure rise. Power consumption of the pump controller at the nominal operating point in both ambient and vacuum conditions was 9.5 W, which was less than the 12 W predicted. Gas ingestion capabilities were tested by injecting 100 cc of air into the fluid line; the pump operated normally throughout this test. The test results contained a number of anomalies, specifically power increases and a few flow stoppages, that prompted TEES and Honeywell to disassemble and inspect the pump. Inspection indicated contamination in the pump and fit issues may have played roles in the observed anomalies. Testing following reassembly indicated that the performance of the pump 1) matched both the predicted performance values, 2) the performance values measured prior to disassembly, and 3) was free of the anomalies noted in the pre-disassembly testing.

Schuller, Michael↗

Superelastic Ball Bearings: Materials and Design to Avoid Mounting and Dismounting Brinell Damage in an Inaccessible Press-fit Application-: Detailed Analysis - II

Rolling element bearings utilized in precision rotating machines require proper alignment, preload, and interference fits to ensure overall optimum performance. Hence, careful attention must be given to bearing installation and disassembly procedures to ensure the above conditions are met. Usually, machines are designed in such a way that bearings can be pressed into housings or onto shafts through the races without loading the rolling elements. However, in some instances, either due to limited size or access, a bearing must be installed or removed in such a way that the load path travels through the rolling elements. This can cause high contact stresses between the rolling elements and the races and introduces the potential for Brinell denting of the races. This paper is a companion to the Part I paper by the authors that discusses material selection and the general design philosophy for the bearing. Here, a more in-depth treatment is given to the design of a dent-resistant bearing utilizing a superelastic alloy, 60NiTi, for the races. A common bearing analysis tool based on rigid body dynamics is used in combination with finite element simulations to design the superelastic bearing. The primary design constraints are prevention of denting and avoiding the balls riding over the edge of the race groove during a blind disassembly process where the load passes through the rolling elements. Through an iterative process, the resulting bearing geometry is tailored to improve axial static load capability compared to a deep-groove ball bearing of the same size. The results suggest that careful selection of materials and bearing geometry can enable blind disassembly without damage to the raceways, which is necessary in the current application (a compressor in the International Space Station Environmental Control and Life Support System), and results in potential design flexibility for other applications, especially small machines with miniature bearings.

metals↗

Sample Return Container Opening Process Concept for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require a pristine and secure opening method to ensure sample Contamination Control and backward Planetary Protection. In order to reach the samples, a series of five containers would need to be opened inside of a Mars Returned Sample Handling (MRSH) facility. The process would include opening the Containment Assurance Module (CAM) aboard the Earth Entry Vehicle (EEV), the Secondary Containment Vessel (SCV), Primary Containment Vessel (PCV), and the Orbiting Sample (OS) container, and finally removing and opening the Returned Sample Tube Assemblies (RSTA). Some of these containers can be opened by reversing the mechanical assembly process while others would require destructive means. Several containers are still in a conceptual design phase while others are en route to Mars aboard the M2020 rover. In order to inform the design of the containers that are still in the conceptual stages, a study was performed at each level of the containment assembly. The studies were used to determine the least destructive and most robust methods to disassemble and open the containers while minimizing risk to the samples or the personnel. In addition to the envisioned disassembly and breaching method, contingency plans were made for completing the disassembly if damage to the vehicle and containment system occurred.

Liu, Yang↗

OSIRIS-REx Curation: The First Year with Bennu Samples on Earth

The OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, and Security – Regolith Explorer) sample return capsule landed on the Utah Test and Training Range (UTTR) on September 24, 2023. Preparations for the curation of the sample from asteroid Bennu inside of this capsule spanned more than a decade. On the morning of landing, the sample return capsule was brought to a temporary cleanroom at UTTR for initial de-integration and connection of the sample canister to a nitrogen gas purge to protect the sample from modification by the terrestrial atmosphere. In the week following landing, the sample canister was flown to Houston while on nitrogen purge, transferred to a nitrogen atmosphere glovebox at NASA Johnson Space Center in which the canister lid was removed revealing small amounts of sample on the inside of the canister lid and avionics deck, some of this sample was allocated rapidly to the mission sample analysis team as “quick look” samples. Next, the Touch-and-Go sample acquisition mechanism (TAGSAM) head was disassembled inside of a specially designed glovebox. A challenge arose during one of the last stages of disassembly when two fasteners resisted being loosened. The curation team was able to remove 70.3 grams of asteroid sample from the TAGSAM head with those fasteners in-place and began initial sample processing which supported long-term curation of hermetically sealed and frozen samples, transfer of some samples to remote storage, and allocation of aggregate samples to the mission sample analysis team. Meanwhile, curation engineers developed a tool to remove the stubborn fasteners without contaminating the remaining sample, enabling the remaining bulk sample to be transferred to long-term storage trays in January 2024. With this second part of the bulk sample, the returned bulk asteroid sample reached 121.6 grams. During disassembly and prior to sealing the bulk sample trays into long-term storage containers, archival photographs were collected. Select particles are gradually being XCT scanned while inside of containers that hold a nitrogen atmosphere. The initial OSIRIS-REx sample catalog was released in spring 2024 with an update in fall 2024. The curation team will be busy working to allocate samples to scientists around the world for the foreseeable future.

Curation↗

Flared tube attachment fitting

Tubes can be flared first, then attached to valves and other flow line components, with new fitting that can be disassembled and reused. Installed fitting can be disassembled so parts can be inspected. It can be salvaged and reused without damaging flared tube; tube can be coated, tempered, or otherwise treated after it has been flared, rather than before, as was previously required. Fitting consists of threaded male portion with conical seating surface, hexagonal nut with hole larger than other diameter of flared end of tube, and split ferrule.

Alkire, I. D.↗

Flight set 360H005 (STS-28) seals, volume 4

The performance is assessed of the 360H005, Fifth flight, Redesigned Solid Rocket Motors (RSMR) in respect to joint sealing issues as seen from post flight inspection of the seals and sealing surfaces. The factory joint disassembly inspections have resumed for 360H005. The new factory joint grease application is in effect and now can be assessed during the disassembly process. The RSRM is illustrated consisting of capture feature field joints as is the J-joint insulation configuration. The nozzle-to-case joint design is also illustrated, which includes 100, 7/8 inch radial bolts in conjunction with a wiper O-ring and modified insulation design. The ignition system seals and a cross section of the igniter are illustrated. The configuration of all the internal nozzle joints are also shown. The postflight inspection of both motors showed the seal components to be in excellent condition except for the indentation found on the inner primary seal of the right hand inner igniter gasket, aft face. Detailed inspection results, and inspections performed by the O-ring Inspection Team are presented.

Curry, Jeffrey T.↗

Mechanical end joint system for connecting structural column elements

A mechanical end joint system is presented that eliminates the possibility of free movements between the joint halves during loading or vibration. Both node joint body (NJB) and column end joint body (CEJB) have cylindrical engaging ends. Each of these ends has an integral semicircular tongue and groove. The two joint halves are engaged transversely - the tongue of the NJB mating with the groove of the CEJB and vice versa. The joint system employs a spring loaded internal latch mechanism housed in the CEJB. During mating, this mechanism is pushed away from the NJB and enters the NJB when mating is completed. In order to lock the joint and add a preload across the tongue and groove faces, an operating ring collar is rotated through 45 deg causing an internal mechanism to compress a Belleville washer preload mechanism. This causes an equal and opposite force to be exerted on the latch bolt and the latch plunger. This force presses the two joint halves tightly together. In order to prevent inadvertent disassembly, a secondary lock is also engaged when the joint is closed. Plungers are carried in the operating ring collar. When the joint is closed, the plungers fall into tracks on the CEJB, which allows the joint to be opened only when the operating ring collar and plungers are pushed directly away from the joining end. One application of this invention is the rapid assembly and disassembly of diverse skeletal framework structures which is extremely important in many projects involving the exploration of space.

Bush, Harold G.↗

Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

Hicken, Steve↗

Investigation of axial positioning for flexural compressors

The testing of the research compressor is presented. The research compressor was assembled and disassembled in order to show the consistency in which the piston and rod could be aligned with a .0004 inch radial gap around the piston. A full set of tests was completed for the first assembly, which is referred to as assembly no. 1. The compressor was disassembled and assembled a second time (assembly no. 2). Assembly no. 2 was only tested statically due to the time constraint. Results are discussed.

Riggle, Peter↗

Truss Slip Joint

Truss slip joint has few parts, strong, and assembled and disassembled easily. Designed to carry axial loads as large as 100,000 lb and to accommodate slight initial axial-displacement and angular misalignments. Joint assembled or disassembled by astronaut in space suit or, on Earth, by technician in heavy protective clothing; simple enough to be operable by robot. Modified to accommodate welding.

Thomas, Frank↗