Search NASA⌕ Search

SEARCH · Search NASA

Results for “dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Empirical results on scheduling and dynamic backtracking

At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

Boddy, Mark S.↗

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

Dynamic Resource Scheduling in Mobile Edge Cloud with Cloud Radio Access Network

Nowadays, by integrating the cloud radio access network (C-RAN) with the mobile edge cloud computing (MEC) technology, mobile service provider (MSP) can efficiently handle the increasing mobile traffic and enhance the capabilities of mobile devices. But the power consumption has become skyrocketing for MSP and it gravely affects the profit of MSP. Previous work often studied the power consumption in C-RAN and MEC separately while less work had considered the integration of C-RAN with MEC. In this paper, we present an unifying framework for the power-performance tradeoff of MSP by jointly scheduling network resources in C-RAN and computation resources in MEC to maximize the profit of MSP. To achieve this objective, we formulate the resource scheduling issue as a stochastic problem and design a new optimization framework by using an extended Lyapunov technique. Specially, because the standard Lyapunov technique critically assumes that job requests have fixed lengths and can be finished within each decision making interval, it is not suitable for the dynamic situation where the mobile job requests have variable lengths. To solve this problem, we extend the standard Lyapunov technique and design the VariedLen algorithm to make online decisions in consecutive time for job requests with variable lengths. Furthermore, our proposed algorithm can reach time average profit that is close to the optimum with a diminishing gap (1/V) for the MSP while still maintaining strong system stability and low congestion. With extensive simulations based on a real world trace, we demonstrate the efficacy and optimality of our proposed algorithm.

97 MATHEMATICS AND COMPUTING↗

Dynamic Optimized Advanced Scheduling of Bandwidth Demands for Large-Scale Science Applications (Final Report)

In this project, developed scheduling frameworks for dynamic bandwidth demands for large-scale science applications. In particular, we developed scheduling algorithms for dynamic bandwidth demands in this project. Apart from theoretical approaches such as Integer Linear Programming, Tabu Search and Genetic Algorithm heuristics, we have utilized practical data from ESnet OSCARS project (from our DOE lab partners) to conduct realistic simulations of our approaches. We have disseminated our work through conference paper presentations and journal papers and a book chapter. In this project we addressed the problem of scheduling of lightpaths over optical wavelength division multiplexed (WDM) networks. We published several conference papers and journal papers on this topic. We also addressed the problems of joint allocation of computing, storage and networking resources in Grid/Cloud networks and proposed energy-efficient mechanisms for operation optical WDM networks.

97 MATHEMATICS AND COMPUTING↗

Dynamic Path Scheduling through Extensions to Generalized Multiprotocol Label Switching (GMPLS) (Final Report)

The major accomplishments of the project are the successful software implementation of the Phase I scheduling algorithms for GMPLS Label Switched Paths (LSPs) and the extension of the IETF Path Computation Element (PCE) Protocol to support scheduling extensions. In performing this work, we have demonstrated the theoretical work of Phase I, analyzed key issues, and made relevant extensions. Regarding the software implementation, we developed a proof of concept prototype as part of our Algorithm Evaluation System (AES). This implementation uses the Linux operating system to provide software portability and will be the foundation for our commercial software. To demonstrate proof of concept, we have implemented LSP scheduling algorithms to support two of the key GMPLS switching technologies (Lambda and Packet) and support both Fixed Path (FP) and Switched Path (SP) routing. We chose Lambda and Packet because we felt it was essential to include both circuit and packet switching technologies as well as to address all-optical switching in the study. As conceptualized in Phase I, the FP algorithms use a traditional approach where the LSP uses the same physical path for the entire service duration while the innovative SP algorithms allow the physical path to vary during the service duration. As part of this study, we have used the AES to conduct a performance analysis using metro size networks (up to 32 nodes) that showed that these algorithms are suitable for commercial implementation. Our results showed that the CPU time required to compute an LSP schedule was small compared to expected inter-arrival time between LSP requests. Also, when the network size increased from 7 to 15 to 32 nodes with 10, 26, and 56 TE links, the CPU processing time showed excellent scaling properties. When Fixed Path and Switched Path routing were compared, SP provided only modestly better performance with respect to LSP completion rate, service duration, path length, and start time deviation. In addition, the SP routing required somewhat more CPU time than the FP routing. However, when the allowable range for the start time is increased, the CPU time for SP increased less rapidly than FP such that the CPU processing times became comparable. Therefore, SP routing may scale better than FP routing. The Path Computation Element Working Group is a complementary working group to the GMPLS working group (CCAMP) in the IETF and is developing standards to discover, manage, and access elements that compute routes for GMPLS for LSPs. The algorithms used to compute the routes are not subject to standardization. Since the PCE supports only standard GMPLS LSPs, it does not support scheduled LSPs. Therefore, it is a natural extension of our Phase I work to introduce this enhancement into the PCE. In addition, the PCE adds another dimension to our product line because the PCE by itself may be a product with a standard interface.

97 MATHEMATICS AND COMPUTING↗

Dypas: A dynamic payload scheduler for shuttle missions

Decision and analysis systems have had broad and very practical application areas in the human decision making process. These software systems range from the help sections in simple accounting packages, to the more complex computer configuration programs. Dypas is a decision and analysis system that aids prelaunch shutlle scheduling, and has added functionality to aid the rescheduling done in flight. Dypas is written in Common Lisp on a Symbolics Lisp machine. Dypas differs from other scheduling programs in that it can draw its knowledge from different rule bases and apply them to different rule interpretation schemes. The system has been coded with Flavors, an object oriented extension to Common Lisp on the Symbolics hardware. This allows implementation of objects (experiments) to better match the problem definition, and allows a more coherent solution space to be developed. Dypas was originally developed to test a programmer's aptitude toward Common Lisp and the Symbolics software environment. Since then the system has grown into a large software effort with several programmers and researchers thrown into the effort. Dypas is currently using two expert systems and three inferencing procedures to generate a many object schedule. The paper will review the abilities of Dypas and comment on its functionality.

Davis, Stephen↗

Enabling Autonomous Rover Science through Dynamic Planning and Scheduling

This paper describes how dynamic planning and scheduling techniques can be used onboard a rover to autonomously adjust rover activities in support of science goals. These goals could be identified by scientists on the ground or could be identified by onboard data-analysis software. Several different types of dynamic decisions are described, including the handling of opportunistic science goals identified during rover traverses, preserving high priority science targets when resources, such as power, are unexpectedly over-subscribed, and dynamically adding additional, ground-specified science targets when rover actions are executed more quickly than expected. After describing our specific system approach, we discuss some of the particular challenges we have examined to support autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations.

planning↗

Pruning of Discrete Dynamic Event Trees Using Density Peaks and Dynamic Time Warping

Discrete Dynamic Event Trees (DDETs) are used in probabilistic risk assessment (PRA) to determine the risk associated with complex systems, such as nuclear power plants, where accident scenarios need to be realistically modeled. One of the most challenging aspects of the DDET method is that a large number of branches are produced for each initiating event. This can result in data that is difficult to organize and time consuming to analyze. As the number of uncertain parameters increases, so does the complexity of the event tree. An event tree often has nodes that do not contribute to the overall results and predictive capabilities; therefore, we suggest a pre-pruning algorithm that can work to remove these nodes, and consequently, reduce the complexity of the tree. Sandia National Laboratories (SNL) is currently working on a two year dynamic cyber-risk informed project to assess cyber failure in a nuclear power plant. This will be achieved by coupling SNL's dynamic scheduler known as Analysis of Dynamic Accident Progression Trees (ADAPT) with MELCOR, a reactor accident simulator, and a System for Circuit Evaluation and Prediction of Transient Radiation Effects (SCEPTRE), a cyber Emulytics code. This paper will discuss the preliminary results of a feasibility study for using density peaks (DP) clustering with dynamic time warping (DTW) to prune branches that are formed from large DDETs, like the ones that will be produced throughout SNL's project. Papers from the project that are submitted to this conference discuss the following: - The MELCOR model for a Pressurized Water Reactor that uses a digital instrumentation and control system. - Proposed generic cyber exploits for the above reactor. - Modifications to ADAPT to extend the framework for multiple simulators, incorporate importance measures into DDET analysis, as well as sort and reduce DDETs based on inputs to or outputs from the tree. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Towards Evolving Electronic Circuits for Autonomous Space Applications

The relatively new field of Evolvable Hardware studies how simulated evolution can reconfigure, adapt, and design hardware structures in an automated manner. Space applications, especially those requiring autonomy, are potential beneficiaries of evolvable hardware. For example, robotic drilling from a mobile platform requires high-bandwidth controller circuits that are difficult to design. In this paper, we present automated design techniques based on evolutionary search that could potentially be used in such applications. First, we present a method of automatically generating analog circuit designs using evolutionary search and a circuit construction language. Our system allows circuit size (number of devices), circuit topology, and device values to be evolved. Using a parallel genetic algorithm, we present experimental results for five design tasks. Second, we investigate the use of coevolution in automated circuit design. We examine fitness evaluation by comparing the effectiveness of four fitness schedules. The results indicate that solution quality is highest with static and co-evolving fitness schedules as compared to the other two dynamic schedules. We discuss these results and offer two possible explanations for the observed behavior: retention of useful information, and alignment of problem difficulty with circuit proficiency.

Lohn, Jason D.↗

Analyzing of Balancing Authorities Cooperation Methods with High Variable Generation Penetration

With the rapidly growing penetration level of wind and solar generation, the challenges of managing variability and the uncertainty of intermittent renewable generation become more and more significant. The problem of power variability and uncertainty gets exacerbated when each balancing authority (BA) works locally and separately to balance its own subsystem. The virtual BA concept is based on various forms of collaboration between individual BAs to manage power variability and uncertainty. The virtual BA will have a wide area control capability in managing its operational balancing requirements in different time frames. This coordination results in the improvement of efficiency and reliability of power system operation while facilitating the high level integration of green, intermittent energy resources. Several strategies for virtual BA implementation, such as Area Control Error (ACE) diversity interchange (ADI), variable generation only BA, BA consolidation, dynamic scheduling, and regulation and load following sharing are discussed in this paper. The objective of such strategies is to allow individual BAs within a large power grid to help each other dealing with power variability. Innovative methods have been developed to simulate the balancing operation of BAs. These methods evaluate the BA operation through a number of metrics such as capacity, ramp rate, ramp duration, energy and cycling requirements to evaluate the performance of different virtual BA strategies.

17 WIND ENERGY↗

Addressing Load Imbalance in Bioinformatics and Biomedical Applications: Efficient Scheduling across Multiple GPUs

Computational bioinformatics and biomedical applications frequently contain heterogeneously sized units of work or tasks, for instance due to variability in the sizes of biological sequences and molecules. Variable-sized workloads lead to load imbalances in parallel implementations which detract from efficiency and performance. Many modern computing resources now have multiple graphics processing units(GPUs) per computer for acceleration. These multiple GPU resources need to be used efficiently through balancing of workloads across the GPUs. OpenMP is a portable directive-based parallel programming API used ubiquitously in bioscience applications to program CPUs; recently, the use of OpenMP directives for GPU acceleration has become possible. Here, motivated by experiences with imbalanced loads in GPU-accelerated bioinformatics applications, we address the load balancing problem using OpenMP task-to-GPU scheduling combined with OpenMP GPU offloading for multiply heterogeneous workloads – loads with both variable input sizes, and simultaneously, variable convergence rates for algorithms with a stochastic component – scheduled across multiple GPUs. We aim to develop strategies which are both easy to use and have lower overheads, and may be incorporated incrementally in existing programs which already make use of OpenMP for CPU-based threading in order to make use of multi-GPU computers. We test different combinations of input size variability and convergence rate variability, and characterize the effects of these different scenarios on the performance of scheduling strategies across multiple GPUs with OpenMP. We present several dynamic scheduling solutions for different parallel patterns, explore optimizations, and provide publicly available example computational kernels to make these strategies easy to use in programs. This work will enable application developers to efficiently and easily use multiple GPUs for imbalanced workloads found in bioinformatics and biomedical applications.

Thavappiragasam, Mathialakan↗

Channel access schemes and fiber optic configurations for integrated-services local area networks

Local Area Networks are in common use for data communications and have enjoyed great success. Recently, there is a growing interest in using a single network to support many applications in addition to traditional data traffic. These additional applications introduce new requirements in terms of volume of traffic and real-time delivery of data which are not met by existing networks. To satisfy these requirements, a high-bandwidth tranmission medium, such as fiber optics, and a distributed channel access scheme for the efficient sharing of the bandwidth among the various applications are needed. As far as the throughput-delay requirements of the various application are concerned, a network structure along with a distributed channel access are proposed which incorporate appropriate scheduling policies for the transmission of outstanding messages on the network. A dynamic scheduling policy was devised which outperforms all existing policies in terms of minimizing the expected cost per message. A broadcast mechanism was devised for the efficient dissemination of all relevant information. Fiber optic technology is considered for the high-bandwidth transmisison medium.

Nassehi, M. Mehdi↗