Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric load growth”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Load Forecasting Guide: A Report by the Energy Systems Integration Group’s EV Load Forecasting Task Force

Forecasting electricity usage is a foundational planning activity for utilities, underpinning billions of dollars in grid investments that ensure system reliability. Historically, forecasting relied on trends in economic and population growth; however, transportation electrification presents a new and complex planning challenge. Unlike conventional loads, electric vehicle (EV) charging has relatively limited usage history. In addition, charging is driven by complex human behaviors, is mobile, and at the same time can concentrate geographically in ways that, without proper planning, can quickly overwhelm local distribution systems.

Giraldez, Julieta [Electric Power Engineers, Austi↗

Enabling Universal Access to Power on the Lunar Surface

The National Aeronautics and Space Administration (NASA) Artemis Missions will return human astronauts to the lunar surface, demonstrate technologies that establish a sustained presence on the lunar surface and enable human missions to Mars, and help create a lunar commercial economy. Creating a sustained permanent presence on the lunar surface will require access to continuous and highly reliable power to support mission needs. During Artemis, lunar surface operations will evolve and grow over time (years), requiring an increase in the amount of power needed (100s of kW) and distance that the power must be transmitted (up to 10 km during early Artemis missions). A lunar commercial economy is likely to exceed this power demand to the MW level and distance in the 100s of km. This increased distance and demand for highly reliable power drives the need to create an electric power grid by connecting localized lunar power systems (e.g., habitats, in-situ resource utilization plants, etc.), each containing one or more loads and/or sources. Developing a lunar surface power grid will allow lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient and required. A lunar surface electric power grid will facilitate the growth of a lunar commercial economy because it provides a means to connect new loads to an existing electrical power system. A common standardized interface to the grid and a set of standardized voltages is required to take full advantage of the benefits of an electric power grid, similar to the terrestrial power grid. NASA Glenn Research Center is leading an effort to create universal access to power through the development of the Universal Modular Interface Converter (UMIC). The UMIC is designed to have a common interface that connects sources and loads compliant with the International Space Power System Interoperability Standard (ISPSIS) to a higher voltage AC transmission system or power grid. This presentation will further discuss the evolution of power during the Artemis missions, challenges associated with creating a sustained presence on the lunar surface, progress made on the UMIC, and future opportunities for technology development and standards.

space power systems↗

Forecasting EV Charging Demand on the Distribution System

The U.S. transportation and electricity sectors have historically operated independently, but the growth of electric vehicles (EVs) is driving their convergence. After decades of stagnant demand, utilities must prepare for rising load growth, driven in part by transportation electrification. Utilities must anticipate when and where these new loads will materialize to effectively manage EV growth and maintain grid reliability. This presentation outlines NREL's approach to developing high-resolution EV load datasets for distribution planning, with insights from the Multi-State Transportation Electrification Impact Study on EV and load forecasting, infrastructure requirements, and managed charging strategies.

25 ENERGY STORAGE↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

Methods to Incorporate Energy Efficiency in Electricity System Planning and Markets

Electric utilities, independent system operators and regional transmission operators have acquired significant levels of energy efficiency over several decades. The predominant approach utilities use to consider energy efficiency in electricity system planning and ISO/RTOs use in wholesale electricity markets is to reduce load forecasts to account for estimated impacts of relevant policies and programs. But an increasing number of states and utilities are interested in improved analysis of energy efficiency in electricity system planning and wholesale electricity markets. This report describes how to consider energy efficiency as a potential resource for the future by allowing it to compete with all other electricity system resources. Increasing levels of wind and solar, growth in peak demand, and electrification of transportation and other new loads have increased the need for a more flexible and responsive electricity system. Considering energy efficiency as a resource option can support these and other electricity system objectives, including grid reliability, reduced electricity costs, energy efficiency targets, and lower air pollutant emissions. The October 2019 slides were presented at the American Council for an Energy Efficient Economy Energy Efficiency as a Resource conference and provide an overview of the report. Portions of the report were included in the American Council for an Energy Efficient Economy Energy Efficiency 2020 Summer Study paper, Planning for the Grid of Tomorrow: Energy Efficiency as a Resource in Utility Resource Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

What does the future hold for utility electricity efficiency programs?

Here, this study develops projections of future spending and savings from electricity efficiency programs funded by electric utility customers in the United States through 2030 based on three scenarios. Our analysis relies on detailed bottom-up modeling of current state energy efficiency policies, demand-side management and integrated resource plans, and regulatory decisions. The three scenarios represent a range of potential outcomes given the policy environment at the time of the study and uncertainties in the broader economic and state policy environment in each state. We project spending to increase to $8.6 billion in 2030 in the medium scenario, about a 45 percent increase relative to 2016 spending. In the high case, annual spending increases to $11.1 billion in 2030 and remains relatively flat in the low case ($6.8 billion in 2030). Our analysis suggests that electricity efficiency programs funded by utility customers will continue to impact load growth significantly at least through 2030, as savings as a percent of retail sales are forecast at 0.7 percent in the medium scenario and 0.98 percent in the high scenario.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Proactive Regulatory Approaches to Electrification and Load Growth: Pre-read Document to Support the July 10-11 th Workshop

This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Increased Electric Vehicle Shares on Bulk Power Systems

The convergence of transportation electrification, other load growth, and the integration of many power sector technologies presents a complex planning problem requiring realistic, region-specific modeling and analysis to ensure the power system can support new loads quickly and affordably.

33 ADVANCED PROPULSION SYSTEMS↗

Automation concepts for large space power systems

A study was undertaken to develop a methodology for analyzing, selecting, and implementing automation functions for multi-hundred-kW photovoltaic power systems intended for manned space station. The study involved identification of generic power system elements and their potential faults, definition of automation functions and their resulting benefits, and partitioning of automation functions between power subsystem, central spacecraft computer, and ground. Automation to a varying degree was concluded to be mandatory to meet the design and operational requirements of the space station. The key drivers are indefinite lifetime, modular growth, high performance flexibility, a need to accommodate different electrical user load equipment, on-orbit assembly/maintenance/servicing, and potentially large number of power subsystem components. Functions that are good candidates for automation via expert system approach includes battery management and electrical consumables management.

Imamura, M. S.↗

Power Sector Decarbonization in South Asia: Pathways for Research, Modeling, and Implementation

Decarbonization of the power sector has far-reaching impact into the further decarbonization of the economy. In many comprehensive decarbonization pathways proposed for the world and for India electrification of transportation, buildings, and industry is the principal solution to decarbonizing those sectors. Therefore, electricity grids are likely to grow as more and new loads are added to them, and this growth will necessarily be from non-carbon emitting resources. This report outlines several key challenges for the power sector in planning, research, and development towards a decarbonized electric power grid. While these challenges will continue to evolve, this report focuses on formulating the important questions for the next two decades to align planning timeframes of India's and South Asia's power sector stakeholders, and to offer near-term research solutions for preparing the datasets, building the models, and designing the studies to answer questions and prepare for these changes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rewarding Grid-Friendly Behavior: Estimating the Potential Bill Reduction and Load Shifting Benefits of Dynamic Prices

Shifting electric load from times of peak demand can be a key strategy to slow price growth as reducing peak demand avoids the cost of upgrading generation, transmission and distribution infrastructure. Utilities are releasing time-varying prices, such as time of use rates or dynamic prices, to incentivize grid-friendly load shifting. New dynamic price programs provide insight into the true cost of operating electricity grids and the potential economic benefits of load shifting. Program developers and device manufacturers need to understand the economic opportunities in terms of 1) the variation in prices across hours, days, and seasons; 2) the change in utility bills for customers who don’t shift load; and 3) the potential load shifted and economic value of different technologies if manufacturers or aggregators deploy price-responsive controls. This paper estimates possible impacts of dynamic price adoption and load shifting controls if customers paid the dynamic rate from one pilot program. Statistical analysis of historical prices identified annual and seasonal metrics as well as representative price curves for each circuit in the pilot. Simulations for residential technologies with price-responsive controls including unitary heat pump water heaters, central multifamily heat pump water heaters, heating & cooling + storage systems, and pool pumps estimated the potential impacts of highly dynamic prices both with and without load shifting controls. Results showed the potential to reduce electricity costs on representative days by 42-94% and reduce consumption during times of high electricity prices by 63-100% compared to baseline operation for those flex-friendly devices.

Grant, Peter↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities

Electricity demand from large load customers such as data centers is projected to grow significantly in the near term. While data centers play an important role in advancing technology innovation and economic growth in the United States, data center energy needs present challenges and opportunities for electricity supply and infrastructure. This technical brief serves as a foundation for the discussion of issues and sharing of perspectives among utilities, regulators, large load customers, and other stakeholders. As utilities and regulators explore rate structures to address growing data center electricity demand, several issues have emerged: -Fair allocation of electricity system costs to large-load customers without unfair shifting of costs to other customers -Appropriate mitigation of the financial risks associated with stranded assets from underutilized utility system investments -Mitigation of operational and resource adequacy risks if electricity demand exceeds supply -Appropriate risk-sharing in commercializing newer electricity technologies such as advanced geothermal, small modular reactors, and long duration energy storage -Accommodating the diverse needs of large-load customers, such as having the option to match electricity consumption with output from carbon-free resources or using onsite generation to provide system capacity The technical brief also identifies key design elements that aim to address these issues and uses leading examples from pending and approved rate structures, agreements, and special contracts to ground the elements in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power subsystem automation study

Generic power-system elements and their potential faults are identified. Automation functions and their resulting benefits are defined and automation functions between power subsystem, central spacecraft computer, and ground flight-support personnel are partitioned. All automation activities were categorized as data handling, monitoring, routine control, fault handling, planning and operations, or anomaly handling. Incorporation of all these classes of tasks, except for anomaly handling, in power subsystem hardware and software was concluded to be mandatory to meet the design and operational requirements of the space station. The key drivers are long mission lifetime, modular growth, high-performance flexibility, a need to accommodate different electrical user-load equipment, onorbit assembly/maintenance/servicing, and potentially large number of power subsystem components. A significant effort in algorithm development and validation is essential in meeting the 1987 technology readiness date for the space station.

Imamura, M. S.↗

Guam100: Guam's 100% Renewable Energy Future

Guam100 is a comprehensive approach to providing analysis to support the transition to 100% renewable energy that considers future load growth, equity, and affordability as well as enhancing the reliability of Guam's electric grid. Guam community stakeholder input will inform the approach to analysis and modeling of future electricity needs, priorities (resilience, equity, and affordability), and resources to meet those needs.

energy burden↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗