Tethered nuclear power for the Space Station

A nuclear space power system the SP-100 is being developed for future missions where large amounts of electrical power will be required. Although it is primarily intended for unmanned spacecraft, it can be adapted to a manned space platform by tethering it above the station through an electrical transmission line which isolates the reactor far away from the inhabited platform and conveys its power back to where it is needed. The transmission line, used in conjunction with an instrument rate shield, attenuates reactor radiation in the vicinity of the space station to less than one-one hundredth of the natural background which is already there. This combination of shielding and distance attenuation is less than one-tenth the mass of boom-mounted or onboard man-rated shields that are required when the reactor is mounted nearby. This paper describes how connection is made to the platform (configuration, operational requirements) and introduces a new element the coaxial transmission tube which enables efficient transmission of electrical power through long tethers in space. Design methodology for transmission tubes and tube arrays is discussed. An example conceptual design is presented that shows SP-100 at three power levels 100 kWe, 300 kWe, and 1000 kWe connected to space station via a 2 km HVDC transmission line/tether. Power system performance, mass, and radiation hazard are estimated with impacts on space station architecture and operation.

Bents, D. J.↗

Tethered nuclear power for the space station

A nuclear space power system the SP-100 is being developed for future missions where large amounts of electrical power will be required. Although it is primarily intended for unmanned spacecraft, it can be adapted to a manned space platform by tethering it above the station through an electrical transmission line which isolates the reactor far away from the inhabited platform and conveys its power back to where it is needed. The transmission line, used in conjunction with an instrument rate shield, attenuates reactor radiation in the vicinity of the space station to less than one-one hundredth of the natural background which is already there. This combination of shielding and distance attenuation is less than one-tenth the mass of boom-mounted or onboard man-rated shields that are required when the reactor is mounted nearby. This paper describes how connection is made to the platform (configuration, operational requirements) and introduces a new element the coaxial transmission tube which enables efficient transmission of electrical power through long tethers in space. Design methodology for transmission tubes and tube arrays is discussed. An example conceptual design is presented that shows SP-100 at three power levels 100 kWe, 300 kWe, and 1000 kWe connected to space station via a 2 km HVDC transmission line/tether. Power system performance, mass, and radiation hazard are estimated with impacts on space station architecture and operation.

Bents, D. J.↗

Advanced continuously variable transmissions for electric and hybrid vehicles

A brief survey of past and present continuously variable transmissions (CVT) which are potentially suitable for application with electric and hybrid vehicles is presented. Discussion of general transmission requirements and benefits attainable with a CVT for electric vehicle use is given. The arrangement and function of several specific CVT concepts are cited along with their current development status. Lastly, the results of preliminary design studies conducted under a NASA contract for DOE on four CVT concepts for use in advanced electric vehicles are reviewed.

Loewenthal, S. H.↗

Design studies of continuously variable transmissions for electric vehicles

Preliminary design studies were performed on four continuously variable transmission (CVT) concepts for use with a flywheel equipped electric vehicle of 1700 kg gross weight. Requirements of the CVT's were a maximum torque of 450 N-m (330 lb-ft), a maximum output power of 75 kW (100 hp), and a flywheel speed range of 28,000 to 14,000 rpm. Efficiency, size, weight, cost, reliability, maintainability, and controls were evaluated for each of the four concepts which included a steel V-belt type, a flat rubber belt type, a toroidal traction type, and a cone roller traction type. All CVT's exhibited relatively high calculated efficiencies (68 percent to 97 percent) over a broad range of vehicle operating conditions. Estimated weight and size of these transmissions were comparable to or less than equivalent automatic transmission. The design of each concept was carried through the design layout stage.

Parker, R. J.↗

Flex-gear electrical power transmission

This study was conducted to develop an alternative way of transferring electricity across a continuously rotating joint, with little wear and the potential for low electrical noise. The problems with wires, slip rings, electromagnetic couplings, and recently invented roll-rings are discussed. Flex-gears, an improvement of roll-rings, are described. An entire class of flexgear devices is developed. Finally, the preferred flex-gear device is optimized for maximum electrical contact and analyzed for average mechanical power loss and maximum stress. For a device diameter of six inches, the preferred device is predicted to have a total electrical contact area of 0.066 square inches. In the preferred device, a small amount of internal sliding produces a 0.003 inch-pound torque that resists the motion of the device.

Vranish, John↗

Assessment of Electric Grid Transmission System Simulator for Human Factors Research

Over the past decades, various technologies have been developed for electric grid operations to support clean energy, meet rising electricity demands, and address infrastructure concerns. However, the human factors aspect is often overlooked during rapid integration. Questions persist about how these technologies impact human performance. Simulators play a critical role in supporting investigation of human factors design concepts and conducting comprehensive usability testing to evaluate human performance and assess human reliability. This paper aims to address human factors research simulator requirements and conduct a comparative study of six different simulators. A detailed evaluation reveals that the evaluated simulators lack the ability to customize user interfaces. Additionally, their user interface designs do not fulfill the basic human factors design principles, potentially leading to increased response variability and reduced statistical power when conducting controlled experimental research. In the future, it is essential to develop scripting tools to integrate customizable user interfaces and simulation models, ensuring meeting research requirements.

Li, Ruixuan↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CPUC Avoided Transmission and Distribution Cost Study to Support the Avoided Cost Calculator: Avoided Transmission Costs Draft Research Plan

Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) have been contracted by the California Public Utilities Commission (CPUC) Energy Division (ED) to perform a study which explores and selects an improved methodology to estimate avoided electricity transmission and distribution (T&D) infrastructure costs that can be attributed to the presence of distributed energy resources (DERs). PNNL is performing the study for avoided electricity transmission infrastructure costs and LBNL is performing the study for avoided electricity distribution infrastructure costs. This document summarizes CPUC’s research questions related to avoided transmission infrastructure costs and PNNL’s proposed technical approach to answer these questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical signal transmission and gap junction regulation in a bone cell network: a cable model for an osteon

A cable model is formulated to estimate the spatial distribution of intracellular electric potential and current, from the cement line to the lumen of an osteon, as the frequency of the loading and the conductance of the gap junction are altered. The model predicts that the characteristic diffusion time for the spread of current along the membrane of the osteocytic processes, 0.03 sec, is nearly the same as the predicted pore pressure relaxation time in Zeng et al. (Annals of Biomedical Engineering. 1994) for the draining of the bone fluid into the osteonal canal. This approximate equality of characteristic times causes the cable to behave as a high-pass, low-pass filter cascade with a maximum in the spectral response for the intracellular potential at approximately 30 Hz. This behavior could be related to the experiments of Rubin and McLeod (Osteoporosis, Academic Press, 1996) which show that live bone appears to be selectively responsive to mechanical loading in a specific frequency range (15-30 Hz) for several species.

NASA Discipline Musculoskeletal↗

Techno-economic analysis of offshore wind PEM water electrolysis for H 2 production

A model for producing hydrogen via offshore wind electrolysis was developed and the levelized costs of both energy and hydrogen were calculated. Here, this model calculated the cost of hydrogen produced by offshore wind and showed that the levelized cost of energy for hydrogen production and transportation to shore could be lower than for electricity transmission from offshore wind farms, using real wind data from a particular location. Therefore, direct coupling of the electrolysis system with offshore wind turbine is more advantageous than transmitting electricity to shore and then producing hydrogen via traditional electrolysis; the cost of hydrogen from offshore wind electrolysis is estimated to be $\$2.09$/kg, vs $\$3.86$/kg from traditional electrolysis using wind power.

08 HYDROGEN↗

Multidisciplinary Design, Analysis, and Optimization (MDO) for Co-Designed Transmission & Distribution Electric Grid Planning

This paper describes early experiences and example use cases applying multi-disciplinary design analysis and optimization (MDO) to the integrated design of power grids. Adapted from aerospace, MDO enables combining multiple existing tools into a coordinated optimization. Here we use MDO to simultaneously capture integrated transmission-distribution and investment-engineering trade-offs in an automated framework. Example use cases showcase prototype interactions among existing grid models using MDO and hint at the types of integrated analyses enabled by this approach. In addition, we share experiences and thoughts on grid-specific challenges and opportunities to help advance further work in this area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Transmission Value in 2023: Market Data Shows the Value of Transmission Remained High in Certain Locations Despite Overall Low Wholesale Electricity Prices

In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Longitudinal variations of very-low-frequency chorus activity in the magnetosphere - Evidence of excitation by electrical power transmission lines

The distribution of VLF chorus in the high-altitude magnetosphere as detected by the Ogo 3 satellite was investigated. Chorus occurrence frequency over 4,668 samples of 5 min of broadband data was computed for Northern Hemisphere bins of 10 deg by 10 deg in dipole invariant latitude and longitude. Peaks in activity were noted over Alaska, the eastern U.S. and Canada, western Europe, and western Siberia, and were shown not to be the result of biased sampling. It is suggested that power line radiation of only about 1 W or less at a given harmonic frequency may be sufficient to stimulate the observed chorus activity and that such power levels can be expected in industrial areas or from large distribution networks. Preliminary results show that chorus starting frequencies are highly correlated with 60 Hz harmonics in the American sector and with 50 Hz harmonics in the European sector.

Luette, J. P.↗

Transmission mounted electrical charging system and dual driveline load coupling

A system includes a PTO device that selectively couples to a driveline of a vehicle at each of two driveline coupling positions, and a motor/generator electrically coupled to an electrical power storage system. The system further includes a shared load selectively powered by the driveline or the motor/generator. The PTO device further includes a coupling actuator that couples the shared load to the motor/generator in a first position, and couples the shared load to the driveline in a second position.

Fortune, Glenn Clark↗