Search NASASearch

SEARCH · Search NASA

Results for “facility modification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Fuel-Flexible Gas Turbine Combustor Flametube Facility

Facility modifications have been completed to an existing combustor flametube facility to enable testing with gaseous hydrogen propellants at the NASA Glenn Research Center. The purpose of the facility is to test a variety of fuel nozzle and flameholder hardware configurations for use in aircraft combustors. Facility capabilities have been expanded to include testing with gaseous hydrogen, along with the existing hydrocarbon-based jet fuel. Modifications have also been made to the facility air supply to provide heated air up to 350 psig, 1100 F, and 3.0 lbm/s. The facility can accommodate a wide variety of flametube and fuel nozzle configurations. Emissions and performance data are obtained via a variety of gas sample probe configurations and emissions measurement equipment.

Little, James E.

Activities in Aeroelasticity at NASA Langley Research Center

This paper presents the results of recently-completed research and presents status reports of current research being performed within the Aeroelasticity Branch of the NASA Langley Research Center. Within the paper this research is classified as experimental, analytical, and theoretical aeroelastic research. The paper also describes the Langley Transonic Dynamics Tunnel, its features, capabilities, a new open-architecture data acquisition system, ongoing facility modifications, and the subsequent calibration of the facility.

Perry, Boyd, III

Aerodynamic Measurements of an Incidence Tolerant Blade in a Transonic Turbine Cascade

An overview of the recent facility modifications to NASA s Transonic Turbine Blade Cascade Facility and aerodynamic measurements on the VSPT incidence-tolerant blade are presented. This work supports the development of variable-speed power turbine (VSPT) speed-change technology for the NASA Large Civil Tilt Rotor (LCTR) vehicle. In order to maintain acceptable main rotor propulsive efficiency, the VSPT operates over a nearly 50% speed range from takeoff to altitude cruise. This results in 50 or more variations in VSPT blade incidence angles. The Transonic Turbine Blade Cascade Facility has the ability to operate over a wide range of Reynolds numbers and Mach numbers, but had to be modified in order to accommodate the negative incidence angle variation required by the LCTR VSPT operation. Details of the modifications are described. An incidence-tolerant blade was developed under an RTPAS study contract and tested in the cascade to look at the effects of large incidence angle and Reynolds number variations. Recent test results are presented which include midspan exit total pressure and flow angle measurements obtained at three inlet angles representing the cruise, take-off, and maximum incidence flight mission points. For each inlet angle, data were obtained at five flow conditions with exit Reynolds numbers varying from 2.12 106 to 2.12 105 and two isentropic exit Mach numbers of 0.72 and 0.35. Three-dimensional flowfield measurements were also acquired at the cruise and take-off points. The flowfield measurements were acquired using a five-hole and three-hole pneumatic probe located in a survey plane 8.6% axial chord downstream of the blade trailing edge plane and covering three blade passages. Blade and endwall static pressure distributions were also acquired for each flow condition.

McVetta, Ashlie B.

Shuttle mission simulator baseline definition report, volume 1

A baseline definition of the space shuttle mission simulator is presented. The subjects discussed are: (1) physical arrangement of the complete simulator system in the appropriate facility, with a definition of the required facility modifications, (2) functional descriptions of all hardware units, including the operational features, data demands, and facility interfaces, (3) hardware features necessary to integrate the items into a baseline simulator system to include the rationale for selecting the chosen implementation, and (4) operating, maintenance, and configuration updating characteristics of the simulator hardware.

Burke, J. F.

Skylab checkout and launch operations at KSC

Checkout and launch operations for the four Skylab flights, plus checkout for a fifth vehicle on rescue status during the last mission, were complex and demanding. Preparations began well before the launch of the last Apollo moon mission in December 1972, and had to be performed without interference with the ongoing program. Three major new flight modules were used in Skylab, each of which imposed specific requirements on Kennedy Space Center. A major facilities modification program resulted in the ability to launch the three Saturn IB Skylab vehicles from Saturn V facilities. This provided large cost savings, but imposed the usual problems caused by first-time use of a new system.

Moser, R. E.

NASA Plum Brook Station In-Space Propulsion Facility Test Stand Characterization Hot Fire Test

A test facility modification to enable small scale altitude propulsion testing at the NASA Glenn Research Center's In-Space Propulsion (ISP) Facility was verified with a hot fire test campaign. As the facility's primary steam supply system undergoes refurbishment, the alternate facility configuration, known as the "vacuum accumulator" mode, would enable rocket engine testing up to 10,000 lbf thrust. The NASA Johnson Space Center developed the vehicle for the verification test campaign: the Integrated Cryogenic Propulsion Test Article (ICPTA). Constructed primarily from assets of the former Morpheus Project, the ICPTA provided an integrated liquid oxygen (LOX) / liquid methane (LCH4) propulsion system including a 2,800 lbf thrust main engine. The ISP Facility's vacuum accumulator configuration leveraged the large test volume of the facility and a diffuser insert to maintain altitude conditions. During hot fire, the ICPTA main engine "started" the diffuser insert constructed for the test campaign. As a result, the test chamber upstream of the diffuser insert remained at altitude conditions throughout the hot fire. Upon engine shut down, a backflow deflector mitigated blow back into the test chamber by restricting the mass flow and redirecting it away from the test article. The test campaign successfully characterized the performance of the vacuum accumulator configuration. In addition, it provided an opportunity to collect data for an integrated LOX / LCH4 propulsion system in an altitude and thermal vacuum environment.

Rocket Engine Testing

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.

Contact dynamics testing of automated three-point docking mechanism

An evaluation of an OMV docking mechanism, based on an adaptation of the Shuttle Flight Support System Pallet Berthing Mechanism was completed. The mechanism uses automatically actuated motorized latches to engage towel bars on the target satellite. LED sensors establish the towel bar position within the capture envelope and the latch capture commands are issued. Then, locking pawls engage the bar, locking and pre-loading the mechanism. Two series of tests were conducted to test nominal and failure mode captures and to evaluate design parameters such as LED sensor locations, automatic closure algorithms, latch closure velocity, position/velocity entry envelopes, and closure method. The first test series involved single latch testing on the Flat Floor Facility, the 6 DOF Facility, and an analytic simulation model. The intent was to compare results in order to validate the various facilities. Reasonably good agreement was achieved. The second test series repeated the single latch testing on the refurbished 6 DOF Facility to validate the facility modifications. The individual latches were tested under free-drift conditions for functionality and performance. Next, the three-latch configuration underwent parametric testing. Test results validated the improved fidelity of the 6 DOF Facility and verified successful docking at the required entry velocity. The tests determined the 'best' design parameter definitions and concluded that the locking pawls should not lock until all three latches completely close.

Rourke, Kenneth H.

DSN Aperture Enhancement Project Office

All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

DSN Aperture Enhancement Project (DAEP)

Evaluation of flow quality in two large NASA wind tunnels at transonic speeds

Wind tunnel testing of low drag airfoils and basic transition studies at transonic speeds are designed to provide high quality aerodynamic data at high Reynolds numbers. This requires that the flow quality in facilities used for such research be excellent. To obtain a better understanding of the characteristics of facility disturbances and identification of their sources for possible facility modification, detailed flow quality measurements were made in two prospective NASA wind tunnels. Experimental results are presented of an extensive and systematic flow quality study of the settling chamber, test section, and diffuser in the Langley 8 foot transonic pressure tunnel and the Ames 12 foot pressure wind tunnel. Results indicate that the free stream velocity and pressure fluctuation levels in both facilities are low at subsonic speeds and are so high as to make it difficult to conduct meaningful boundary layer control and transition studies at transonic speeds.

Harvey, W. D.

HISCAT: A proposed new scatter facility in Northern Scandinavia

It is proposed that a new versatile ionospheric and atmospheric scatter radar be constructed in northern Scandavia through a multinational collaborative effort. The new facility tentatively named HISCAT (High frequency, High power, High latitude, Heating and Ionospheric Scatter facility), should be used for scientific investigations of: the physics of the neutral (middle) atmosphere; fundamental plasma phenomena, natural or artificially induced in the ionosphere; electrodynamic conditions at high altitudes above the auroral region and in the polar cap ionosphere; plasma waves in the solar atmosphere. The system should thus be able to operate as a mesosphere-stratosphere-troposphere (MST) radar, a so-called ionospheric modification facility, incoherent-scatter radar, coherent-scatter radar, and solar radar. Basically, the new facility should be a device that can operate simultaneously on several frequencies in the frequency range 5 to 50 MHz not covered by other instruments. It should comprise: powerful transmitters, capable of delivering a total average power of several megawatts; an advanced phased antenna array of high gain forming one or two steerable and well collimated beams; and an advanced data collection and analysis system.

Bostrom, R.

Custom Equipment Development for Processing of Surplus Plutonium

Facilities and Material • Location: Savannah River Site K-Area, South Carolina • Plutonium designated as surplus is blended with adulterant material, re-packaged and shipped to WIPP in New Mexico • Currently one operational glovebox for downblending, facility modifications and construction of three additional glovebox lines in progress • Current operations are highly manual requiring full PPE and reader/worker steps

Krementz, Daniel [Savannah River National Laborato

Single stage earth orbital reusable vehicle. Volume 6: Resources

The results of a conceptual study of the resource requirements for a single-stage earth-orbital vehicle are presented. All aspects of program costs for the design, manufacture, test, transportation, launch, and facility modifications were considered. The following program costs are discussed: configuration definition, cost groundrules and assumptions, program requirements, work breakdown structure, cost estimation methods, and cost analysis. High cost areas are identified.

Source record

Computer-controlled environmental test systems - Criteria for selection, installation, and maintenance.

Applications for presently marketed, new computer-controlled environmental test systems are suggested. It is shown that capital costs of these systems follow an exponential cost function curve that levels out as additional applications are implemented. Some test laboratory organization changes are recommended in terms of new personnel requirements, and facility modification are considered in support of a computer-controlled test system. Software for computer-controlled test systems are discussed, and control loop speed constraints are defined for real-time control functions. Suitable input and output devices and memory storage device tradeoffs are also considered.

Chapman, C. P.

Advanced supersonic inlet technology.

Recently, relatively new analytical procedures have been successfully used to design bleed systems for mixed-compression inlets designed to operate efficiently up to Mach number 2.65. The procedures used constitute a major advance in inlet technology by offering a promising approach to attain high internal and external performance for mixed-compression inlets that operate over a large supersonic Mach number range. Unfortunately, there is a lack of data describing bleed hole performance characteristics to verify these procedures at high Mach numbers. This paper briefly discusses the analytical procedures for designing advanced inlet systems and suggests facility modifications wherein the procedures can be verified on large-scale inlet models up to approximately Mach number 4.5.

Sorensen, N. E.

STS cargo processing at the Kennedy Space Center

Space Shuttle-related payload processing operations at the Kennedy Space Center have resulted in a major increase in the number of items being simultaneously processed, with two or more intermediate spacecraft being prepared, along with several smaller payload items, for launch on the same mission. When full operational status is achieved, some elements of three or more Space Shuttle flight cargoes will undergo processing at the Center simultaneously. It is also expected that long lead time items will often arrive earlier than those requiring a shorter checkout span. These and other complications due to the progressive increase in the scale of operations have prompted facility modifications, new operational procedures, and advance planning.

Rock, W. H.