Search NASA⌕ Search

SEARCH · Search NASA

Results for “large scale cargo”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

Unsteady Pressure Acquisition on the 1.75% Scale SLS Block 1B Cargo Liftoff Configuration

Time-varying pressure on the core of the Space Launch System (SLS) Block 1B Cargo vehicle was acquired using instrumentation typically used for steady, time averaged pressure. Resono Pressure Systems, Inc. in partnership with the University of Wyoming have developed a unique hardware and software system for measuring unsteady pressure, which was implemented in a large-scale wind tunnel test through a nonreimbursable Space Act Agreement with NASA. The technique was applied to 12 pressure ports on the 1.75% scale SLS wind tunnel model. Tubing lengths of approximately 14 inches separated the pressure transducer module from the pressure taps on the model surface, and surface-mount validation sensors (Kulites) were installed in close proximity to 5 of the 12 pressure ports. Up to about 500 Hz, the frequency response of pressure fluctuations agreed to within 1 dB of amplitude and 10° of phase difference compared to the simultaneously-acquired surface-mount transducers. Sample results using the reconstructed pressure from the full azimuthal ring of taps are presented.

unsteady pressure↗

Structural Characterization of Advanced Composite Tow-Steered Shells with Large Cutouts

The structural performance of two advanced composite tow-steered shells with large cutouts, manufactured using an automated fiber placement system, is assessed using both experimental and analytical methods. The fiber orientation angles of the shells vary continuously around their circumference from +/- 10 degrees on the crown and keel, to +/- 45 degrees on the sides. The raised surface features on one shell result from application of all 24 tows during each fiber placement system pass, while the second shell uses the tow drop/add capability of the system to achieve a more uniform wall thickness. These unstiffened shells, both without and with small cutouts, were previously tested in axial compression and buckled elastically. In this study, a single unreinforced cutout, scaled to represent a cargo door on a commercial aircraft, is machined into one side of each shell. The prebuckling axial stiffnesses and bifurcation buckling loads of these shells with large cutouts are also computed using linear finite element structural analyses for preliminary comparisons with test data. During testing, large displacements are observed around the large cutouts, but the shells maintain an average of 91 percent of the axial stiffness, and also carry 85 percent of the buckling loads, when compared to the pristine shells without cutouts. These relatively small reductions indicate that there is great potential for using tow steering to mitigate the adverse effects of large cutouts on the overall structural performance.

Wu, K. Chauncey↗

Wind tunnel investigation of aerodynamic characteristics of scale models of three rectangular shaped cargo containers

Wind tunnel tests were conducted on scale models of three rectangular shaped cargo containers to determine the aerodynamic characteristics of these typical externally-suspended helicopter cargo configurations. Tests were made over a large range of pitch and yaw attitudes at a nominal Reynolds number per unit length of 1.8 x one million. The aerodynamic data obtained from the tests are presented.

Laub, G. H.↗

Initial assessment of the effects of energetic ion injections in the magnetosphere due to the transport of satellite power system components from low earth orbit to geosynchronous earth orbit

Potentially serious environmental effects exist when cargo orbital transfer vehicle (COTV) ion propulsion is used on the scale proposed in the preliminary definition studies of the Satellite Power System. These effects of the large scale injections of ion propulsion exhaust in the plasmasphere and in the outer magnetosphere were shown to be highly model dependent with major differences existing in the predicted effects of two models, the ion cloud model and the ion sheath model. The expected total number density deposition of the propellant Ar(+) in the plasmasphere, the energy spectra of the deposited Ar(+) and time dependent behavior of the Ar(+) injected into the plasmasphere by a fleet of COTV vehicles differ drastically between the two models. The ion sheath model was demonstrated to be applicable to the proposed Ar(+) beam physics if the beam was divergent and turbulent whereas the ion cloud model was not a realistic approximation for such a beam because the "frozen-field" assumption on which it is based is not valid.

Curtis, S. A.↗

SOLL-E: A Module Transport and Placement Robot for Autonomous Assembly of Discrete Lattice Structures

This paper presents the design and development of a transport and placement robot that demonstrates autonomous assembly of structural building blocks. The robots are intended to serve as a critical component of automated structural assembly and maintenance systems. The Scaling Omni-directional Lattice Locomoting Explorer (SOLL-E) uses a 5-DoF bipedal inchworm locomotion architecture with locking foot and cargo grippers. The locomotion system employs large magnet gap diameter BLDC motors with moderate timing belt gearing for primary joints, and DC planetary gearmotors for turning. Foot and cargo grippers are identical, with servo-actuated locking mechanisms. Three modular controller boards are used to control these actuators in real-time, with command and telemetry data transferred between the server and each controller board via WiFi. Functionality and performance were evaluated in a ground demonstration.

robotics↗

Establishing a Robotic, LEO-to-GEO Satellite Servicing Infrastructure as an Economic Foundation for Exploration

The strategy for accomplishing civilian exploration goals and objectives is in the process of a fundamental shift towards a potential new approach called Flexible Path. This paper suggests that a government-industry or public-private partnership in the commercial development of low Earth orbit to geostationary orbit (LEO-to-GEO (LTG)) space, following or in parallel with the commercialization of Earth-to-LEO and International Space Station (ISS) operations, could serve as a necessary, logical step that can be incorporated into the flexible path approach. A LTG satellite-servicing infrastructure and architecture concept is discussed within this new strategic context. The concept consists of a space harbor that serves as a transport facility for a fleet of specialized, fully- or semi-autonomous robotic servicing spacecraft. The baseline, conceptual system architecture is composed of a space harbor equipped with specialized servicer spacecraft; a satellite command, communication, and control system; a parts station; a fuel station or depot; and a fuel/parts replenishment transport. The commercial servicer fleet would consist of several types of spacecraft, each designed with specialized robotic manipulation subsystems to provide services such as refueling, upgrade, repair, inspection, relocation, and removal. The space harbor is conceptualized as an ISS-type, octagonal truss structure equipped with radiation tolerant subsystems. This space harbor would be primarily capable of serving as an operational platform for various commercially owned and operated servicer spacecraft positioned and docked symmetrically on four of the eight sides. Several aspects of this concept are discussed, such as: system-level feasibility in terms of ISS-truss-type infrastructure and subsystems emplacement and maintenance between LEO and GEO; infrastructure components assembly in LEO, derived from ISS assembly experience, and transfer to various higher orbital locations; the evolving Earth-to-orbit (ETO) capability to deliver humans and cargo to LEO for assembly purposes; system architectural definition, optimal orbital parameters, mass estimations, delta velocity ( V) estimations, power and propulsion options, and assessments of various critical technologies. Large-scale, robotic, LTG satellite servicing is considered as an essential economic pre-condition and next parallel or sequential step on the road toward exploration beyond LEO. Such a step might produce the necessary pre-requisite economic value that can be used by future decision makers to justify further investment in exploration beyond LEO.

Horsham, Gary A. P.↗

Wind tunnel investigation of aerodynamic characteristics of a scale model of a D5 bulldozer and an M109 self-propelled 155 mm Howitzer

Wind tunnel tests were conducted on a scale model of a D5 bulldozer and an M109 self-propelled 155 MM howitzer to determine the aerodynamic characteristics of these typical externally-suspended heavy lift helicopter cargo configurations. Tests were made over a large range of pitch and yaw attitudes at a nominal Reynolds number per unit length of 1.5 x 10 to the 6th power.

Laub, G. H.↗

Hydrogen technology for maritime applications: A review of challenges, opportunities, and lessons from the port authority of New York and New Jersey

The maritime industry faces increasing demand for energy security, operational efficiency, and environmental performance improvements. Hydrogen technology, considered a potential energy carrier, is being explored for port operations, including cargo-handling equipment, heavy-duty vehicles, and stationary power systems. This review evaluates the feasibility, challenges, and potential benefits of hydrogen integration within port infrastructure, using the Port Authority of New York and New Jersey as a representative case study. Drawing on case studies, technical reports, and policy analyses, this study examines the infrastructural, regulatory, and operational factors influencing large-scale deployment, emphasizing supply chain development, storage requirements, and refueling infrastructure. By situating hydrogen within broader maritime energy transition efforts, this review provides an evidence-based assessment of its role in port operations and energy diversification strategies. In conclusion, the findings outline key barriers to adoption and emphasize the need for coordinated efforts among stakeholders to determine hydrogen's role alongside other emerging energy technologies.

08 HYDROGEN↗

Ares I First Stage Booster Deceleration System: An Overview

In 2005, the Congressional NASA Authorization Act enacted a new space exploration program, the "Vision for Space Exploratien". The Constellation Program was formed to oversee the implementation of this new mission. With an intent not simply to support the International Space Station, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains, the Constellation Program is supervising the development of a brand new fleet of launch vehicles, the Ares. The Ares lineup will include two new launch vehicles: the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle. A crew exploration vehicle, Orion, will be launched on the Ares I. It will be capable of docking with the Space Station, the lunar lander, Altair, and the Earth Departure Stage of Ares V. The Ares V will be capable of lifting both large-scale hardware and the Altair into space. The Ares First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low Earth orbit. The Ares I First Stage booster is a 12-foot diameter, five-segment, reusable solid rocket booster derived from the Space Shuttle's four segment reusable solid rocket booster (SRB). It is separated from the Upper Stage through the use of a Deceleration Subsystem (DSS). Booster Tumble Motors are used to induce the pitch tumble following separation from the Upper Stage. The spent Ares I booster must be recoverable using a parachute deceleration system similar to that of the Shuttle SRB heritage system. Since Ares I is much heavier and reenters the Earth's atmosphere from a higher altitude at a much higher velocity than the SRB, all of the parachutes must be redesigned to reliably meet the operational requisites of the new launch vehicles. This paper presents an overview of this new booster deceleration system. It includes comprehensive detail of the parachute deceleration system, its design and deployment sequences, including how and why it is being developed, the requirements it must meet, and the testing involved in its implementation.

King, Ron↗

Air Force Reusable Booster System: A Quick-look, Design Focused Modeling and Cost Analysis Study

This paper presents a method and an initial analysis of the costs of a reusable booster system (RBS) as envisioned by the US Department of Defense (DoD) and numerous initiatives that form the concept of Operationally Responsive Space (ORS). This paper leverages the knowledge gained from decades of experience with the semi-reusable NASA Space Shuttle to understand how the costs of a military next generation semi-reusable space transport might behave in the real world - and how it might be made as affordable as desired. The NASA Space Shuttle had a semi-expendable booster, that being the reusable Solid Rocket MotorslBoosters (SRMlSRB) and the expendable cryogenic External Tank (ET), with a reusable cargo and crew capable orbiter. This paper will explore DoD concepts that invert this architectural arrangement, using a reusable booster plane that flies back to base soon after launch, with the in-space elements of the launch system being the expendable portions. Cost estimating in the earliest stages of any potential, large scale program has limited usefulness. As a result, the emphasis here is on developing an approach, a structure, and the basic concepts that could continue to be matured as the program gains knowledge. Where cost estimates are provided, these results by necessity carry many caveats and assumptions, and this analysis becomes more about ways in which drivers of costs for diverse scenarios can be better understood. The paper is informed throughout with a design-for-cost philosophy whereby the design and technology features of the proposed RBS (who and what, the "architecture") are taken as linked at the hip to a desire to perform a certain mission (where and when), and together these inform the cost, responsiveness, performance and sustainability (how) of the system. Concepts for developing, acquiring, producing or operating the system will be shown for their inextricable relationship to the "architecture" of the system, and how these too relate to costs. Design and technology features bear special relevance to early program research and development directions. Given the uncertainties involved in both their actual performance promise and their relation to costs of operational systems, this later relationship is also given special attention.

Zapata, Edgar↗

Architecture in Mission Integration, Choreographing Constraints

In any building project the Architect's role and skill is to balance the client's requirements with the available technology, a site and budget. Time, place and resources set the boundaries and constraints of the project. If these boundaries are correctly understood and respected by the Architect they can be choreographed into producing a facility that abides by those constraints and successfully meets the clients needs. The design and assembly of large scale space facilities whether in orbit around or on the surface of a planet require and employs these same skills. In this case the site is the International Space Station (ISS) which operates at a nominal rendezvous altitude of 220 nautical miles. With supplies to support a 7 day mission the Shuttle nominally has a cargo capacity of 35,000 pounds to that altitude. Through the Mission Integration process the Launch Package Management Team choreographs the constraints of ascent performance, hardware design, cargo, rendezvous, mission duration and assembly time in order to meet the mission objective.

Jones, Rod↗

Unmanned Vehicle Material Flammability Test

Microgravity combustion phenomena have been an active area of research for the past 3 decades however, there have been very few experiments directly studying spacecraft fire safety under low-gravity conditions. Furthermore, none of these experiments have studied sample and environment sizes typical of those expected in a spacecraft fire. All previous experiments have been limited to samples of the order of 10 cm in length and width or smaller. Terrestrial fire safety standards for all other habitable volumes on earth, e.g. mines, buildings, airplanes, ships, etc., are based upon testing conducted with full-scale fires. Given the large differences between fire behavior in normal and reduced gravity, this lack of an experimental data base at relevant length scales forces spacecraft designers to base their designs using 1-g understanding. To address this question a large scale spacecraft fire experiment has been proposed by an international team of investigators. This poster presents the objectives, status and concept of this collaborative international project to examine spacecraft material flammability at realistic scales. The concept behind this project is to utilize an unmanned spacecraft such as Orbital Cygnus vehicle after it has completed its delivery of cargo to the ISS and it has begun its return journey to earth. This experiment will consist of a flame spread test involving a meter scale sample ignited in the pressurized volume of the spacecraft and allowed to burn to completion while measurements are made. A computer modeling effort will complement the experimental effort. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. This will facilitate the examination of fire behavior on a scale that is relevant to spacecraft fire safety and will provide unique data for fire model validation. This will be the first opportunity to examine microgravity flame behavior at scales approximating a spacecraft fire.

Combustion↗

Vibrational metrics for the evaluation of internal conditions in a scaled nuclear dry storage cask

In many countries, permanent repositories for high burnup spent nuclear fuel assemblies have yet to be established. As a result, much of the spent fuel from nuclear reactors is contained within dry storage casks, with many being beyond their designed service life. The assessment of the internal structural integrity of these casks and the fuel assemblies contained therein is of critical importance for both extended storage and transport to permanent repositories. The large size, structural complexity, and inaccessibility of the interior of the casks make this task challenging. To address these difficulties, a 1:6 scaled model based closely on the design of a Transnuclear (TN-32) dry storage cask was fabricated to facilitate controlled studies of these structures in the laboratory. Vibrational spectroscopy was used to evaluate the state of the cargo and internal structures within the cask utilizing only measurements on the outer surface. Using modes identified through Finite Element modeling corresponding to those previously measured on a full-scale TN-32 cask, we report on the development of amplitude- and phase-based metrics that are sensitive to internal conditions in the lab cask. Steel rod bundles and steel shot were used as surrogates for intact and damaged fuel assemblies, and various internal configurations of these materials were investigated. Finally, the metrics were based on acquired spectra involving the (1, 2) global bending mode and the (2, 1) radial-with-shearing mode. The results show that the metrics are sensitive to the condition of a single assembly and have some ability to determine the locations of damaged and empty slots.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Model Development of Large-Scale Spacecraft Fires During the Saffire-IV Experiments

An accidental fire can pose dire consequences to crew safety and mission success. The Saffire Project aims to investigate large-scale fire behavior in microgravity in order to aid in the prediction of spacecraft fires. These series of experiments ignite solid materials within the Northrup Grumman Cygnus vehicle after it departs from a resupply mission to the International Space Station. A model of the Cygnus vehicle during the Saffire-IV experiment was developed using the commercial software PyroSim. The cargo arranged during the descent phase was used for the geometry of the model. In the model, cabin air flows into the Saffire payload while heat and combustion species flow out of the Saffire downstream through a standoff to a bed of sensors called the Far Field Diagnostic (FFD). The temperature sensors near the Saffire payload were used to determine the heat release rate at the outlet of Saffire, while the details of the combustion and stoichiometry are used to determine the species flow at the outlet. Gas measurements previously reported for the Saffire-IV experiments are compared against the simulation results and sources of error are discussed.

Modeling↗

Large-Scale Spacecraft Fire Safety Tests

An international collaborative program is underway to address open issues in spacecraft fire safety. Because of limited access to long-term low-gravity conditions and the small volume generally allotted for these experiments, there have been relatively few experiments that directly study spacecraft fire safety under low-gravity conditions. Furthermore, none of these experiments have studied sample sizes and environment conditions typical of those expected in a spacecraft fire. The major constraint has been the size of the sample, with prior experiments limited to samples of the order of 10 cm in length and width or smaller. This lack of experimental data forces spacecraft designers to base their designs and safety precautions on 1-g understanding of flame spread, fire detection, and suppression. However, low-gravity combustion research has demonstrated substantial differences in flame behavior in low-gravity. This, combined with the differences caused by the confined spacecraft environment, necessitates practical scale spacecraft fire safety research to mitigate risks for future space missions. To address this issue, a large-scale spacecraft fire experiment is under development by NASA and an international team of investigators. This poster presents the objectives, status, and concept of this collaborative international project (Saffire). The project plan is to conduct fire safety experiments on three sequential flights of an unmanned ISS re-supply spacecraft (the Orbital Cygnus vehicle) after they have completed their delivery of cargo to the ISS and have begun their return journeys to earth. On two flights (Saffire-1 and Saffire-3), the experiment will consist of a flame spread test involving a meter-scale sample ignited in the pressurized volume of the spacecraft and allowed to burn to completion while measurements are made. On one of the flights (Saffire-2), 9 smaller (5 x 30 cm) samples will be tested to evaluate NASAs material flammability screening tests. The first flight (Saffire-1) is scheduled for July 2015 with the other two following at six-month intervals. A computer modeling effort will complement the experimental effort. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. This will facilitate the first examination of fire behavior on a scale that is relevant to spacecraft fire safety and will provide unique data for fire model validation.

Combustion↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

Measurement and Analysis of Terminal Shock Oscillation and Buffet Forcing Functions on a Launch Vehicle Payload Fairing

The buffet loads on a launch vehicle payload shroud can be impacted by the unsteadiness associated with a terminal shock at high subsonic speeds. At these conditions, flow accelerates to supersonic speeds on the nose of the payload fairing and is terminated by a normal shock on the cylindrical section downstream of the nose cone/cylinder shoulder. The location of the terminal shock and associated separated boundary layer is affected by the freestream Mach number, Reynolds number, and the pitch/yaw of the launch vehicle. Furthermore, even when the freestream conditions and vehicle attitude are constant, this terminal shock oscillates on the surface of the vehicle. The time-varying surface pressure associated with the terminal shock results in unsteady aerodynamic loads that may interact with vehicle structural dynamic modes and the guidance and control of the vehicle. Buffet testing of a 3-percent scale rigid buffet model of a launch vehicle cargo configuration with a tangent-ogive payload shroud was conducted in 2012 and in 2016. Initial buffet forcing functions (BFFs) utilized a coarse pressure sensor distribution on the vehicle surface in which a single longitudinal station with eight sensors observed the terminal shock environment at Mach 0.90. An examination of these circumferential pressures reveal large impulse-like pressure fluctuations and an asymmetry in pressure when the vehicle is at a nonzeroangle of attack that result in high BFFs. Revisions to the shock integration region were made based on computational fluid dynamics and shadowgraph video of shock motion to better represent the BFFs and reduce the high loads resulting from this environment. To more clearly understand this terminal shock environment, a second wind tunnel test was conducted with a dense distribution of 256 sensors at the terminal shock location. These sensor arrays presents a unique opportunity to observe the unsteady terminal shock environment and to characterize the impact of various integration schemes on the BFFs. This paper presents a summary of the development of BFFs for this terminal shock and a detailed analyses of shock region pressure coefficients, coherence, BFFs, shock location time histories, and power spectral density to help guide development of BFFs for other launch vehicle test and analysis programs.

Piatak, David J.↗