Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Novel Approach to Noise-Filtering Based on a Gain-Scheduling Neural Network Architecture

A gain-scheduling neural network architecture is proposed to enhance the noise-filtering efficiency of feedforward neural networks, in terms of both nominal performance and robustness. The synergistic benefits of the proposed architecture are demonstrated and discussed in the context of the noise-filtering of signals that are typically encountered in aerospace control systems. The synthesis of such a gain-scheduled neurofiltering provides the robustness of linear filtering, while preserving the nominal performance advantage of conventional nonlinear neurofiltering. Quantitative performance and robustness evaluations are provided for the signal processing of pitch rate responses to typical pilot command inputs for a modern fighter aircraft model.

Troudet, T.↗

NASA Deep Space Network Operations Scheduling

The functioning of the Deep Space Network Operations Scheduling, Jet Propulsion Laboratory, CA is reviewed. The primary objectives of the Operations Scheduling are: to schedule the worldwide global allocation of ground communications, tracking facilities, and equipment; and to provide deep space telecommunications for command, tracking, telemetry, and control in support of flight mission operations and tests. Elements of the earth set are Deep Space Stations (DSS) which provide the telecommunications link between the earth and spacecraft; NASA Communications Network; Network Data Processing Area; Network Operations Control Area which provides operational direction to the DSS; Mission Control and Computing systems; and Mission Support areas which provide flight control of the spacecraft. Elements of the space set include mission priorities and requirements which determine the spacecraft queue for allocating network resources. Scheduling is discussed in terms of long-range (3 years), mid-range (8 weeks), and short-range (2 weeks).

Enari, D. M.↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

NASA Deep Space Network operating control

The primary function of the Deep Space Network (DSN) is to provide effective and reliable tracking and data acquisition for planetary and interplanetary space flight missions. This involves providing data to flight project mission operations, accepting commands from mission operations and transmitting the commands to stations and spacecraft, and providing a record of telemetry and command data to mission operations. Also included are network performance monitoring, the generation of predictions for antenna pointing and signal acquisition, network scheduling, and network validation tests. Descriptions are given of the three facilities and six systems of the DSN. Also described are interfaces, automation and standardized procedures, and discrepancy reporting. It is pointed out that the greatest challenge facing the DSN is the implementation of NASA's Network Consolidation Program, which is scheduled to be completed in 1986. The objectives of this program are enumerated.

Weisman, W. D.↗

Evaluating Space Network (SN) scheduling operations concepts through statistical analysis

The Network Control Center (NCC) currently uses the NCC Data System (NCCDS) to schedule customer spacecraft communication requests for the Space Network (SN). The NCC/Request Oriented Scheduling Engine (NCC/ROSE), which implements an operational concept called flexible scheduling, is being tested as a potential replacement for the NCCDS scheduler in an effort to increase the efficiency of the NCC scheduling operations. This paper describes the high fidelity benchmark tests being conducted on NCC/ROSE, the evaluation techniques used to compare schedules, and the results of the tests. This testing will verify the increases in efficiency and productivity that can help the NCC meet the anticipated scheduling loads well into the next century.

Kwadrat, Carl↗

Developing scheduling benchmark tests for the Space Network

A set of benchmark tests were developed to analyze and measure Space Network scheduling characteristics and to assess the potential benefits of a proposed flexible scheduling concept. This paper discusses the role of the benchmark tests in evaluating alternative flexible scheduling approaches and defines a set of performance measurements. The paper describes the rationale for the benchmark tests as well as the benchmark components, which include models of the Tracking and Data Relay Satellite (TDRS), mission spacecraft, their orbital data, and flexible requests for communication services. Parameters which vary in the tests address the degree of request flexibility, the request resource load, and the number of events to schedule. Test results are evaluated based on time to process and schedule quality. Preliminary results and lessons learned are addressed.

Moe, Karen L.↗

DSN seven day/twelve week schedule program

Deep Space Network scheduling program allocates resources based on the users requirements. The system reviews and allocates the requests for equipment and resources. Depending upon the program input either the seven day or the twelve week schedule is generated.

Holzman, R. E.↗

Architectural impact of FDDI network on scheduling hard real-time traffic

The architectural impact on guaranteeing synchronous message deadlines in FDDI (Fiber Distributed Data Interface) token ring networks is examined. The FDDI network does not have facility to support (global) priority arbitration which is a useful facility for scheduling hard real time activities. As a result, it was found that the worst case utilization of synchronous traffic in an FDDI network can be far less than that in a centralized single processor system. Nevertheless, it is proposed and analyzed that a scheduling method can guarantee deadlines of synchronous messages having traffic utilization up to 33 pct., the highest to date.

Agrawal, Gopal↗

IRIS-GNN: Leveraging Graph Neural Networks for Scheduling on Truly Heterogeneous Runtime Systems

The diversity of accelerators in computer systems poses significant challenges for software developers, such as managing vendor-specific compiler toolchains, code fragmentation requiring different kernel implementations, and performance portability issues. To address these, the Intelligent Runtime System (IRIS) was developed. IRIS works across various systems, from smartphones to supercomputers, enabling automatic performance scaling based on available accelerators. It introduces abstract tasks for seamless execution transitions between accelerators while ensuring memory consistency and task dependencies. Although IRIS simplifies system details, optimal dynamic scheduling still requires user input to understand workload structures. To address this, we introduce a new scheduling policy for IRIS, termed IRIS-GNN, which is the first IRIS hybrid policy that operates in conjunction with the dynamic policies. This policy employs a Graph-Neural Network (GNN) to conduct Graph Classification of any task graphs submitted to IRIS. This GNN analyzes the structure and attributes of the task graph, categorizing it as either locality, concurrency, or mixed. This classification subsequently guides the selection of the dynamic policy used by IRIS. We provide a comparison of the performance of IRIS-GNN against the complete spectrum of IRIS’s dynamic policies, assess the overhead introduced by the GNN within this scheduling framework, and ultimately explore its practical application in real-world scenarios.

Johnston, Beau↗

Low Latency and High Data Rate (LLHD) Scheduler: A Multipath TCP Scheduler for Dynamic and Heterogeneous Networks

The scheduler is a crucial component of the multipath transmission control protocol (MPTCP) that dictates the path that a data packet takes. Schedulers are in charge of delivering data packets in the right order to prevent delays caused by head-of-line blocking. The modern Internet is a complicated network whose characteristics change in real-time. MPTCP schedulers are supposed to understand the real-time properties of the underlying network, such as latency, path loss, and capacity, in order to make appropriate scheduling decisions. However, the present scheduler does not take into account all of these characteristics together, resulting in lower performance. We present the low latency and high data rate (LLHD) scheduler, which successfully makes scheduling decisions based on real-time information on latency, path loss, and capacity, and achieves around 25% higher throughput and 45% lower data transmission delay than Linux’s default MPTCP scheduler.

97 MATHEMATICS AND COMPUTING↗

Robust Scheduling of Networked Microgrids for Economics and Resilience Improvement

The benefits of networked microgrids in terms of economics and resilience are investigated and validated in this work. Considering the stochastic unintentional islanding conditions and conventional forecast errors of both renewable generation and loads, a two-stage adaptive robust optimization is proposed to minimize the total operating cost of networked microgrids in the worst scenario of the modeled uncertainties. By coordinating the dispatch of distributed energy resources (DERs) and responsive demand among networked microgrids, the total operating cost is minimized, which includes the start-up and shut-down cost of distributed generators (DGs), the operation and maintenance (O&M) cost of DGs, the cost of buying/selling power from/to the utility grid, the degradation cost of energy storage systems (ESSs), and the cost associated with load shedding. The proposed optimization is solved with the column and constraint generation (C&CG) algorithm. The results of case studies demonstrate the advantages of networked microgrids over independent microgrids in terms of reducing total operating cost and improving the resilience of power supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DSN Scheduling Engine

The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

Clement, Bradley↗

SPRINT: Scheduling Planning Routing Intersatellite Network Tool

The Scheduling Planning Routing Intersatellite Network Tool (SPRINT) software system plans and schedules the operations (observations, inter-satellite crosslink communications, and ground communications) of Earth observation (EO) constellations of hundreds of resource-constrained small satellites to enable global, near real-time science. Historically, most CubeSats have flown radios only for direct-to-ground downlink of data; as a result, data availability is delayed by as long as it takes for the capturing satellite to pass over a ground station, typically hours. Current Planning and Scheduling (P&S) systems for constellations cannot handle data routing through a large, dynamic network topology, and all planning is handled on the ground without .the ability to autonomously prioritize important observations, or respond to unexpected changes in communication window or bandwidth. SPRINT directly handles both data routing for low latency bulk observation data downlink and replanning onboard to deal with dynamic priorities and fault response, maximizing the utility of downlinked data.

Kerri Cahoy↗

Mission Operations Centers (MOCs): Integrating key spacecraft ground data system components

In an environment characterized by decreasing budgets, limited system development time, and user needs for increased capabilities, the Mission Operations Division (MOD) at the National Aeronautics and Space Administration Goddard Space Flight Center initiated a new, cost-effective concept in developing its spacecraft ground data systems: the Mission Operations Center (MOC). In the MOC approach, key components are integrated into a comprehensive and cohesive spacecraft planning, monitoring, command, and control system with a single, state-of-the-art graphical user interface. The MOD is currently implementing MOC's, which feature a common, reusable, and extendable system architecture, to support the X-Ray Timing Explorer (XTE), Tropical Rainfall Measuring Mission (TRMM), and Advanced Composition Explorer (ACE) missions. As a result of the MOC approach, mission operations are integrated, and users can, with a single system, perform real-time health and safety monitoring, real-time command and control, real-time attitude processing, real-time and predictive graphical spacecraft monitoring, trend analysis, mission planning and scheduling, command generation and management, network scheduling, guide star selection, and (using an expert system) spacecraft monitoring and fault isolation. The MOD is also implementing its test and training simulators under the new MOC management structure. This paper describes the MOC concept, the management approaches used in developing MOC systems, the technologies employed and the development process improvement initiatives applied in implementing MOC systems, and the expected benefits to both the user and the mission project in using the MOC approach.

Harbaugh, Randy↗

GradientGraph

Under this SBIR Phase II, Reservoir Labs has developed G2 Analytics, a new technology that allows network operators to analyze bottleneck and flow performance with high precision. G2 delivers a new analytical approach and framework to resolve a variety of key problems found in modern communication networks, including: traffic engineering, routing, flow scheduling, network design, capacity planning, resiliency analysis, network slicing, or service level agreement (SLA) management, among others. G2 leverages the bottleneck structure of congestion-controlled communication networks, a recent mathematical discovery by the Reservoir team [RL19b, RL20a, RL20b, RL21a]. Bottleneck structures reveal how perturbations on flows and links propagate through the network, providing an analytical framework to measure (qualitatively and quantitatively) the ripple effects induced as they traverse the network. Leveraging the mathematics of bottleneck structures, Reservoir Labs is developing the G2 technology to provide network operators with a framework to design, optimize and troubleshoot network performance. This delivery includes the G2 software stack.

Yellamraju, Sruthi↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

In this paper, we propose to solve the constrained optimization problem in two phases. The first phase uses heuristic methods such as the ant colony method, particle swarming optimization, and genetic algorithm to seek a near optimal solution among a list of feasible initial populations. The final optimal solution can be found by using the solution of the first phase as the initial condition to the SQP algorithm. We demonstrate the above problem formulation and optimization schemes with a large-scale network that includes the DSN ground stations and a number of spacecraft of deep space missions.

Communication Network Scheduling↗

Timeline Resource Analysis Program (TRAP): User's manual and program document

The Timeline Resource Analysis Program (TRAP), developed for scheduling and timelining problems, is described. Given an activity network, TRAP generates timeline plots, resource histograms, and tabular summaries of the network, schedules, and resource levels. It is written in ANSI FORTRAN for the Honeywell SIGMA 5 computer and operates in the interactive mode using the TEKTRONIX 4014-1 graphics terminal. The input network file may be a standard SIGMA 5 file or one generated using the Interactive Graphics Design System. The timeline plots can be displayed in two orderings: according to the sequence in which the tasks were read on input, and a waterfall sequence in which the tasks are ordered by start time. The input order is especially meaningful when the network consists of several interacting subnetworks. The waterfall sequence is helpful in assessing the project status at any point in time.

Sessler, J. G.↗