Search NASA⌕ Search

SEARCH · Search NASA

Results for “nrho”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Robust Trajectory Optimization for NRHO Rendezvous Using SPICE Kernel Relative Motion

In this paper, robust optimization is performed on trajectory correction maneuvers during the lunar lander return phase of an Artemis mission, treating the trajectory from one hour after low lunar orbit departure to arrival in the vicinity of the lunar Gateway as a relative motion problem. To enable rapid stochastic optimization techniques requiring many candidate trajectories, SPICE kernel relative motion as implemented by the Quadratic Interpolated State Transition (QIST) system is used as the underlying dynamics propagation. The optimization is performed with a genetic optimizer using linear covariance (LinCov) software in a simplified operational context, taking into account the availability of navigation sensors with varying measurement models, ranges, and accuracies. No numerical integration is used, since the relative motion around Gateway is fully characterized with the a priori computation of the QIST coefficients. Maneuver placements are computed to optimize the minimum 3σ delta-v of the trajectory, the position dispersion at a target point, and a convex combination of these two metrics. An order of magnitude runtime improvement is provided over legacy methods with less than 10% error introduced. All QIST results are shown to be in-family with legacy methods. The tradespace for optimal delta-v design is found to range from 77.0 to 93.9 m/s, while the range of optimal dispersion is between 1.4 and 11.7 km.

Relative Motion↗

Cloud Computing Methods for Near Rectilinear Halo Orbit Trajectory Design

Complicated mission design problems require innovative computational solutions. As spacecraft depart from a proposed Gateway in a Near Rectilinear Halo Orbit (NRHO), recontact analysis is required to avoid risk of collision and ensure safe operations. Escape dynamics from NRHOs are governed by multiple gravitational bodies, yielding a trajectory design space that is exhaustively large. This paper summarizes the recontact analysis for departure from the NRHO and describes how the Deep Space Trajectory Explorer (DSTE) trajectory design software incorporates high performance cloud computing to compute and visualize the orbit design space. Recent focus on exploration missions to cislunar space has kindled accelerated interest in multibody orbit solutions. Trajectory analysis in the presence of multiple gravity fields is complex, and innovative computational tools are needed to simplify complicated design spaces, to generate large quantities of data quickly, and to visualize the output for user accessibility. The Gateway mission is a prime example. The Gateway1 is proposed as a human outpost in deep space. The current baseline orbit for the Gateway is a Near Rectilinear Halo Orbit (NRHO) near the Moon.2 The NRHO exists in a regime that experiences the gravitational effects of the Earth and the Moon simultaneously, complicating orbit analysis. The mission design process benefits greatly from updated computational tools for multibody missions like the Gateway. As an example, consider the problem of assessing the risk of collision in an NRHO. As a staging location to missions to the lunar surface and beyond the Earth-Moon system, the Gateway will experience spacecraft and other objects regularly arriving and departing. Departing objects potentially include spent logistics modules, visiting crew vehicles, debris objects, wastewater particles, and cubesats. Each departure is governed by the dynamics of the Gateway orbit and the surrounding dynamical environment. Over time, any unmaintained object in such an orbit eventually departs due to the small instabilities associated with the NRHOs. A separation maneuver speeds the departure from the NRHO, but the effects of the maneuver on the spacecraft behavior depend on the location, magnitude, and direction of the burn. Escape dynamics from the NRHO with regard to these maneuver options open up an enormous potential trajectory design space where subtle changes in input can produce dramatically large changes in the results. Any departing object must avoid recontacting the Gateway as it leaves the lunar vicinity, and a recontact analysis thus involves a significant number of computations and extensive output data. To explore the dynamics of this extensive design space, the Deep Space Trajectory Explorer3 (DSTE) trajectory design software incorporates new High Performance Computing (HPC) services and novel interactive visualizations. This paper details the HPC and cloud infrastructure techniques that are implemented in the DSTE, applying the new capabilities to analysis of recontact risk with the Gateway in NRHO. NEAR RECTILINEAR HALO ORBITS The Gateway is planned to fly in a lunar NRHO as its baseline orbit. The NRHO families of orbits are subsets of the larger halo families, which originate from planar orbits near the L1 and L2 libration points; the Earth-Moon L2 halo family appears in Figure 1. Each halo orbit is perfectly periodic in the Circular Restricted 3-Body Problem (CR3BP) and becomes a quasi-periodic orbit in a higher fidelity ephemeris force model. The NRHOs are defined as those members of the halo family with bounded stability properties;2 they pass near the Moon at perilune and are nearly polar. Families exist with apolunes located both above the lunar north pole and above the lunar south pole; the Gateway is planned to reside in a southern L2 NRHO in a 9:2 resonance with the lunar synodic period. The 9:2 NRHO is characterized by a period of about 6.5 days, a perilune radius of about 3,500 km, and an apolune radius of about 71,000 km; it is strongly affected by the gravity of both the Earth and the Moon simultaneously. This NRHO offers extended communications with assets on the south pole of the Moon,4 as well as low-cost orbit maintenance and attitude control,5 favorable eclipse avoidance properties,6 and inexpensive transfers from Earth and to other destinations.5,7 The NRHO portion of the southern L2 halo family is highlighted in black in Figure 1, and the 9:2 NRHO appears in blue.

Phillips, Sean M.↗

Space Launch System and Missions to Near Rectilinear Halo Orbits

The first major evolution of NASA’s Space Launch System (SLS) will begin its flights starting in the mid-2020’s. This new configuration, called Block 1B, replaces the Interim Cryogenic Propulsion Stage with a larger Exploration Upper Stage (EUS). The additional capability provided by the new upper stage will allow SLS to send heavier payloads into deep space. One destination of interest to the SLS program is called a Near Rectilinear Halo Orbit (NRHO). This is a type of lunar orbit with multiple advantages for deep space exploration. These benefits include Earth/lunar access, low station-keeping requirements, and high communication potential with Earth. Therefore, it is a leading candidate for the proposed Lunar Orbital Platform-Gateway (LOP-G). This paper will provide a detailed assessment of the SLS Block 1B requirements and capabilities for sending payloads to an NRHO. Analysts at Marshall Space Flight Center are producing a multi-year mission availability scan for the SLS Block 1B configuration to a predefined NRHO orbit. The analysis produces an optimized trajectory for each day of the scan window. A maximized payload and minimized propellant requirement are determined for each day. All maneuvers from launch to the end of the Trans-Lunar-Injection (TLI) are being modeled as finite burns. Injections into an NRHO are being modeled as impulsive maneuvers. The payload element is arbitrary, but includes sufficient mass to represent a large habitat or propulsion module. The resulting parameters of payload capability, delta-v requirements, and launch windows length vary over the course of the scan. Many launch days in the scan are eliminated in post-processing as they violate mission constraints such as payload mass and propellant usage to insert into an NRHO. Based off previous one-year scan results for the SLS Block 1B Design Analysis Cycle 2 (DAC-2), it is expected that there will be one to three days per week where the payload is able to insert into an NRHO within SLS constraints objectives. This scan provides results for longer than one-year, allowing analysts to better understand the launch availability and energy requirements of SLS Block 1B over time. The in-space mission design and scans utilize Copernicus, an n-body trajectory optimization tool originally developed out of the University of Texas at Austin with further development at Johnson Space Center in Houston, TX. To seed the in-space trajectory, Copernicus uses a plugin to call a database of SLS ascent trajectories optimized in the Program to Simulate Optimized Trajectories II (POST2). The ascent trajectories are developed using a framework that parametrizes payload mass and LEO inclination, and targets a 100 nmi (nautical mile) altitude circular parking orbit. Though this analysis is specific to the SLS program, it will provide a summary of mission design benefits and constraints associated with generic NRHO access, and may be applied to other programs or concepts that will utilize this orbit.

Statham, T. L.↗

End-to-End Performance Optimization of a Crewed Lunar Landing Mission Staged from a Near Rectilinear Halo Orbit

A crewed lunar landing mission staged from a Near Rectilinear Halo Orbit (NRHO) presents a unique set of challenges not considered before for the Apollo-type direct missions. The NRHO does not have a fixed orbital plane and its period also changes with time, due to which the mission performance is very sensitive to the timing and location of the NRHO departure and arrival burns for a near-polar surface landing site. For such type of mission staged from the NRHO, an end-to-end optimization approach for the entire mission, from the NRHO departure to surface landing and from surface lift-off to the NRHO insertion, is well-suited for extracting the maximum performance out of this design. In this paper, an integrated approach for performing end-to-end optimization of a NRHO-staged crewed lunar landing mission is proposed that optimizes the in-space and powered flight segments simultaneously using Copernicus trajectory optimization tool. Copernicus is augmented with analytical approximations for the in-space, powered descent, and powered ascent segments in this work to improve the convergence of its multiple-shooting based direct optimization method. New analytical solutions are derived for the different phases of the powered flight segments by solving associated guidance problems. These analytical solutions act as initial guesses for starting the numerical optimization of the integrated mission in Copernicus. An example lunar landing mission is simulated to validate the proposed end-to-end optimization approach and the results are compared with the conventional patched trajectory approach.

Bharat Mahajan↗

Low Thrust Cis-Lunar Transfers Using a 40 kW-Class Solar Electric Propulsion Spacecraft

This paper captures trajectory analysis of a representative low thrust, high power Solar Electric Propulsion (SEP) vehicle to move a mass around cis-lunar space in the range of 20 to 40 kW power to the Electric Propulsion (EP) system. These cis-lunar transfers depart from a selected Near Rectilinear Halo Orbit (NRHO) and target other cis-lunar orbits. The NRHO cannot be characterized in the classical two-body dynamics more familiar in the human spaceflight community, and the use of low thrust orbit transfers provides unique analysis challenges. Among the target orbit destinations documented in this paper are transfers between a Southern and Northern NRHO, transfers between the NRHO and a Distant Retrograde Orbit (DRO) and a transfer between the NRHO and two different Earth Moon Lagrange Point 2 (EML2) Halo orbits. Because many different NRHOs and EML2 halo orbits exist, simplifying assumptions rely on previous analysis of orbits that meet current abort and communication requirements for human mission planning. Investigation is done into the sensitivities of these low thrust transfers to EP system power. Additionally, the impact of the Thrust to Weight ratio of these low thrust SEP systems and the ability to transit between these unique orbits are investigated.

cislunar↗

Overview of the Lunar Transit Trajectory Performed by the Power and Propulsion Element of NASA’s Gateway

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in an orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020combinedthe first two elements of the Gateway, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO), onto a single commercial launch vehicle (CLV). When launched together, the PPE and HALO make up the first two elements of NASA’s Gateway and exceed the performance capacity of commercially available launch vehicles to deliver directly to the moon. The delivery of the Gateway is enabled by and takes advantage of the high efficiency of the PPEs high-power Solar Electric Propulsion (SEP) system to transfer a significant starting mass from an initial Earth orbit to final insertion into the NRHO. The PPE is a 50-kW class high power solar electric propulsion stage comprised of two different types of electric thruster strings. The SEP system is operated in two different modes, a high thrust and high Isp (specific impulse), to both maximize the final delivered mass and attempt to minimize the time spent in the Van Allen Belts early in the transit trajectory. Additionally, this SEP system brings the capability to the assembled Gateway for transfer between orbits in cislunar space. This paper captures the preliminary low thrust lunar transfer reference trajectory to be flown by the PPE it delivers itself and HALO via a spiral trajectory from launch vehicle insertion to insertion into the NRHO as well as a preliminary reference round trip transfer of the Gateway from the NRHO to a Distant Retrograde Orbit (DRO) using the PPE. Once in its final NRHO, the Gateway is being designed to enable long duration human and robotic exploration of the lunar south pole as a precursor to Mars. The Gateway’s low thrust lunar transit trajectory is envisioned to prove out the application of and flight of a high-power SEP system as a demonstration of technologies applicable to the enabling of future human space exploration.

human exploration↗

Analysis of Near Rectilinear Halo Orbit Insertion with a 40-kW Solar Electric Propulsion System

This paper examines low thrust trajectories for delivery of a 40-kW solar electric propulsion spacecraft and potential additional payload to a desired NRHO. One option considered is a trans-lunar injection launch as a co-manifested payload on the Space Launch System. For this option, a reference trajectory is designed and a scan of launch dates is completed to understand the propellant mass sensitivity. A 15-day period cyclical variation in required propellant is observed that is attributed to solar gravity effects. A second option considered is to launch on a smaller commercial launch vehicle to a less energetic elliptical orbit and use SEP to spiral out to NRHO. For this option, analysis is completed to understand the trades between delivered mass to NRHO, total propellant required, time of flight, and solar array degradation. Results show that, while launching to lower altitudes can deliver greater payload mass to NRHO, significant solar array degradation can be observed.

Trajectory↗

Trajectory Design Considerations for Lunar Surface to Near Rectilinear Halo Orbit Rendezvous

NASA’s Artemis program plans to use a 9:2 resonant southward Near-Rectilinear Halo Orbit (NRHO) at the Earth-Moon’s L2 libration point to stage assets for a sustained lunar exploration campaign. This architecture includes the use of the Gateway space station positioned in this orbit. While the proximity operations in the NRHO are similar to field-free space dynamics, the far-field rendezvous aspect of the problem is more complicated. We analyze the key drivers of the ΔV performance of the far-field rendezvous problem from low lunar orbit to the Gateway. We find that lunar latitudinal libration is a driving factor to ΔV performance for surface ascent missions that rendezvous with the NRHO, and that transfer time from low lunar orbit to NRHO affects more aspects of the geometry and performance than expected from rendezvous in Keplerian orbits.

NRHO↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

Analysis of Near Rectilinear Halo Orbit Insertion with a 40-kW Solar Electric Propulsion System

This paper examines low thrust trajectories for delivery of a 40-kW solar electric propulsion spacecraft and potential additional payload to a desired NRHO. One option considered is a trans-lunar injection launch as a co-manifested payload on the Space Launch System. For this option, a reference trajectory is designed and a scan of launch dates is completed to understand the propellant mass sensitivity. A 15-day period cyclical variation in required propellant is observed that is attributed to solar gravity effects. A second option considered is to launch on a smaller commercial launch vehicle to a less energetic elliptical orbit and use SEP to spiral out to NRHO. For this option, analysis is completed to understand the trades between delivered mass to NRHO, total propellant required, time of flight, and solar array degradation. Results show that, while launching to lower altitudes can deliver greater payload mass to NRHO, significant solar array degradation can be observed.

Mccarty, Steven L.↗

Development Of 12 Kw Hall Thrusters for Nasa Lunar Gateway Power And Propulsion Element

NASA is embarking on a new and exciting era of human exploration to the Moon and its vicinity. As part of the Artemis program, NASA is developing the lunar Gateway, an orbiting platform in Near Rectilinear Halo Orbit (NRHO) about the Moon. The first two elements of the Gateway will be launched in 2024 and will be transferred from a high Earth orbit to the NRHO via the use of Solar Electric Propulsion (SEP). The SEP system is located on the Power and Propulsion Element (PPE) which will provide up to 60 kW of power. Aerojet Rocketdyne is developing the 12 kW flight Hall thrusters to be used for transferring the PPE and the Habitat and Logistics Outpost (HALO) module to NRHO. Work is continuing on the development testing, and these results will be described in the paper. The project has also recently completed its critical design review and is transitioning to the fabrication of the three flight thrusters. The 12 kW Hall thrusters are being developed under the NASA Advanced Electric Propulsion System (AEPS) program. As part of the AEPS program, AR built two Engineering Test Unit (ETU) Hall thrusters based on the NASA HERMeS engine and conducted a series of tests to validate the design. One series of tests focused on environments and functional testing, while the other series was mainly focused on long duration test blocks. Results from these tests were used to compare with NASA data from the HERMeS thruster. The comparison of the test results showed no change to the critical performance and lifetime parameters, which enabled the next phase of the program to proceed. Currently testing is continuing on the Engineering Development Units (EDU) as part of the flight qualification activities. The successful completion of the CDR serves as the starting point for the flight thruster fabrication, which is now underway to support the launch of the Gateway modules in 2024. The development and qualification of the AEPS 12 kW Hall thrusters is proceeding well. As the program completes CDR and transitions into flight builds of the three 12 kW Hall thrusters that will be used to transfer the combined PPE and HALO stack to the NRHO, the results of the development testing are reviewed in this presentation, and a status of the program and future plans is provided. The launch of the two Gateway modules and the transfer of this large payload to cislunar orbit will mark a significant milestone in electric propulsion, as it will demonstrate the ability of SEP to transfer very large payloads over great distances. This establishes the precedent that could lead to cargo transfers from the Earth to the Moon or even to Mars using SEP.

Hall thrusters↗

Orbit Maintenance Burn Details for Spacecraft in a Near Rectilinear Halo Orbit

The baseline orbit for Gateway is a Near Rectilinear Halo Orbit (NRHO) in a 9:2 resonance with the lunar synodic period. A spacecraft in this slightly unstable NRHO requires orbit maintenance (OM) for long-duration operations. An updated OM algorithm is described, including a discussion of desirable OM burn location along the NRHO and the effects of changing weighting parameters and tolerances. The directions of the OM burns are explored in depth, both in the Earth-Moon rotating frame and from a Sun-relative perspective. A technique to augment the OM algorithm to enable long-term operations in NRHO is outlined, and the effects of constraints on OM attitudes are investigated.

Diane C. Davis↗

Perturbations and Recovery in the Gateway Near Rectilinear Halo Orbit

The Gateway and CAPSTONE spacecraft are planned to orbit the Moon in a Near Rectilinear Halo Orbit (NRHO) that experiences a 9:2 resonance with the lunar synodic period. Disturbances applied to spacecraft in this NRHO must be corrected to achieve a reasonable lifetime in orbit. This investigation explores the variations between a spacecraft operating under nominal orbit maintenance and the baseline NRHO. The effects of perturbations on an unmaintained spacecraft are examined, with a focus on the time to depart the NRHO. Finally, the costs of correcting disturbances of varying magnitudes are computed using a simple but robust orbit maintenance algorithm.

Diane C. Davis↗

Assessment of Cislunar Staging Orbits to Support the Artemis III Lunar Surface Mission

Since NASA’s selection of an L2 9:2 lunar synodic resonant Near Rectilinear Halo Orbit (NRHO) as the baseline for the Gateway Program, the agency has worked to mature its understanding of this orbit and its use for the Artemis III, IV, and V missions. In parallel with these efforts, NASA has investigated alternative staging orbits to perform the Artemis III lunar surface landing mission and compared those options to the baseline NRHO. This paper evaluates a number of alternative orbits on their feasibility and favorability and compares them to the agency baseline NRHO.

Artemis↗

Trajectory Design Considerations for Low Lunar Orbit to Near Rectilinear Halo Orbit Transfers

NASA’s Artemis program plans to use a Near-Rectilinear Halo Orbit (NRHO) to stage assets for a lunar exploration campaign. While the proximity operations in the NRHO are simple and very similar to flat-space dynamics, the far-field ren-dezvous has considerations that are non-intuitive, especially to those that may be steeped in the dynamics of rendezvous in Keplerian orbits. This paper will discuss some key drivers to the delta-V performance of far-field rendezvous from Low Lunar Orbit to the Gateway space station in its 9:2 resonant south-ward NRHO.

NRHO↗

Rephasing and Loitering Strategies in the Gateway Near Rectilinear Halo Orbit

NASA's Gateway plans to operate in an L2 9:2 lunar synodic Near Rectilinear Halo Orbit (NRHO) for nominal operations. During the mission's lifetime, scenarios may arise where rephasing within the NRHO or loitering in an alternate trajectory are advantageous. This investigation discusses two strategies to perform this rephasing in the NRHO over a relatively short timespan. The first method uses two maneuvers to shift the phase along a single transfer arc. The second strategy employs four maneuvers, leveraging an intermediate orbit for rephasing. An optimization strategy is formulated to construct locally optimal solutions in the Circular Restricted Three-Body Problem (CR3BP) and verified in a higher-fidelity ephemeris model.

NRHO↗