Search NASA⌕ Search

SEARCH · Search NASA

Results for “operating expenditures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

DAWN'S Operations in Cruise from Vesta to Ceres

On 5 September 2012, Dawn concluded its successful exploration of Vesta, the second most massive object in the main asteroid belt. The spacecraft departed after 14 months in orbit and is now using its ion propulsion system to travel to dwarf planet Ceres, the most massive main-belt asteroid. The principal activity now is thrusting with the ion propulsion system to provide the 3.4 km/s required to rendezvous with Ceres early in 2015. Because two of the four reaction wheels have experienced faults and are likely unrecoverable, a substantial effort has been invested in preparing for Ceres operations with alternate attitude control methods. The project has engaged in an intensive campaign to reduce hydrazine expenditures, which has resulted in a significant increase in the hydrazine expected to be available for Ceres. Based on this work, studies provide good confidence that the required activities at Ceres can be completed. This paper describes post-Vesta operations, including measures taken to conserve hydrazine as well as other preparations for Ceres.

Dawn↗

Dawn's operations in cruise from Vesta to Ceres

On 5 September 2012, Dawn concluded its successful exploration of Vesta, the second most massive object in the main asteroid belt. The spacecraft departed after 14 months in orbit and is now using its ion propulsion system to travel to dwarf planet Ceres, the most massive main-belt asteroid. The principal activity now is thrusting with the ion propulsion system to provide the 3.3 km/s required to rendezvous with Ceres early in 2015. Because two of the four reaction wheels have experienced faults and are likely unrecoverable, a substantial effort has been invested in preparing for Ceres operations with alternate attitude control methods. The project has engaged in an intensive campaign to reduce hydrazine expenditures, which has resulted in a significant increase in the hydrazine expected to be available for Ceres. Based on this work, studies provide good confidence that the required activities at Ceres can be completed. This paper describes post-Vesta operations, including measures taken to conserve hydrazine as well as other preparations for Ceres.

Mase, Robert A.↗

Energy Expenditure During Extravehicular Activity: Apollo Skylab Through STS-135

The importance of real-time metabolic rate monitoring during extravehicular activities (EVAs) came into question during the Gemini missions, when the energy expenditure required to conduct an EVA over-tasked the crewmember and exceeded the capabilities of vehicle and space suit life support systems. Energy expenditure was closely evaluated through the Apollo lunar surface EVAs, resulting in modifications to space suit design and EVA operations. After the Apollo lunar surface missions were completed, the United States shifted its focus to long duration human space flight, to study the human response to living and working in a microgravity environment. This paper summarizes the energy expenditure during EVA from Apollo Skylab through STS-135.

Paul, Heather L.↗

Heat switch has no moving parts

No moving parts are needed for thermally actuated switch. It could also operate as variable thermal conductance, allowing temperature of equipment to be regulated with minimal expenditure of energy.

Castles, S. H.↗

Efficient Silicon Reactor

High-purity silicon efficiently produced and transferred by continuous two-cycle reactor. New reactor operates in relatively-narrow temperature rate and uses large surfaces area to minimize heat expenditure and processing time in producing silicon by hydrogen reduction of trichlorosilane. Two cycles of reactor consists of silicon production and removal.

Bates, H. E.↗

Fatigue induced cracking in aluminum LN-2 shroud of 39 foot vacuum chamber

Fourteen years after completion of Ford's 39-foot space simulation chamber, leaks began to appear in its LN2 shroud. Although the shroud had been tight since its acceptance, cracks appeared in 1983 in some of the field welds of the one inch tubes which interconnect the LN2 panels. The resulting leaks were large enough to prevent pump down to high vacuum and could be heard easily when the chamber was at ambient conditions. New cracks appeared during each thermal cycle making it impossible to utilize the chamber for thermal vacuum testing. The analysis presented here implies that many, if not all, of the aluminum LN2 shrouds now in use may be in various stages of fatigue failure. The probability is high that fatigue cracks are working through the aluminum tubing in heat-affected zones of some field welds. The cracks may not be apparent yet, but after the shroud has experienced a certain number of thermal cycles these cracks will work through the material and become serious leaks. Fortunately, appropriate planning, analysis, and checking can, with a relatively small expenditure of money, help to avoid large and unexpected shroud failures and keep the chamber operational as long as it is needed.

Edwards, A. A.↗

Personnel Launch System definition

A lifting-body Personnel Launch System (PLS) is defined for assured manned access to space for future U.S. space missions. The reusable craft described is configured for reliable and safe operations, maintainability, affordability, and improved operability, and could reduce life-cycle costs associated with placing personnel into orbit. Flight simulations show the PLS to be a very flyable vehicle with very little control and propellant expenditure required during entry. The attention to crew safety has resulted in the design of a system that provides protection for the crew throughout the mission profile. However, a new operations philosophy for manned space vehicles must be adopted to fully achieve low-cost, manned earth-to-orbit transportation.

Piland, William M.↗

Concepts and requirements for shuttle/payload orbital operations of the space transportation system

The results of studies and software development activities are summarized. Technical reports and memoranda are presented in a graphical history of contract activities and the expenditure of engineering manhours. Major topics and activities are: (1) flight phase standardization; (2) flight profile standardization; (3) maneuver targeting for solid rocket motors; (4) relative motion and RCS (Reaction Control System) jet flowfield plotting programs; (5) on-orbit aerodynamic models; (6) terminal approach strategy for payload retrieval/docking; (7) proximity navigation; and (8) desk-top flight simulator for proximity operations. A list of recommendations is also presented.

Wilson, S. W.↗

Vehicle conversion to hybrid gasoline/alternative fuel operation

The alternative fuels considered are compressed natural gas (CNG), liquefied natural gas (LNG), liquid petroleum gas (LPG), and methanol; vehicles were required to operate in a hybrid or dual-fuel gasoline/alternative fuel mode. Economic feasibility was determined by comparing the costs of continued use of gasoline fuel with the use of alternative fuel and retrofitted equipment. Differences in the amounts of future expenditures are adjusted by means of a total life-cycle costing. All fuels studied are technically feasible to allow a retrofit conversion to hybrid gasoline/alternative fuel operation except for methanol. Conversion to LPG is not recommended for vehicles with more than 100,000 km (60,000 miles) of prior use. Methanol conversion is not recommended for vehicles with more than 50,00 km (30,000 miles).

Donakowski, T. D.↗

On the effect of emotional states on operator thinking

A combination sonic and electrical skin stimuli stress test is reported that is suitable for the psychological selection of individuals to perform operator functions. The behavior of these people is characterized by a fighting spirit, increased work capacity, minimum expenditure of strength and insignificant fatigue.

Solodkova, A. V.↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

Quantifying Caloric Expenditure During Zero-G Exercise

BACKGROUND: Exercise is a fundamental component of maintaining astronaut health on long-duration space missions, where the microgravity environment poses unique challenges to physiological homeostasis. Accurate quantification of energy expenditure during such exercises is crucial for optimizing nutritional and physical health strategies for spacefarers. OBJECTIVE: This study aims to develop a comprehensive model to estimate caloric expenditure during exercise in a microgravity environment, employing a combination of spirometry, heart rate data, and other relevant parameters. By assessing energy utilization under these conditions, we seek to facilitate enhanced health management protocols for astronauts in space. METHODS & OUTCOMES: A multivariate predictive model will be constructed, utilizing spirometry and heart rate data, coupled with additional physiological and environmental parameters. A systematic approach will be applied to analyze the relationship between these variables and energy expenditure during various exercises. The proposed model will subsequently undergo rigorous validation to ensure accuracy and reliability. This research is expected to yield a precise and reliable predictive model, contributing to improved strategies for exercise prescription and nutritional intake, addressing the unique challenges presented by microgravity environments. We anticipate that our findings will support the development of more effective health maintenance protocols for astronauts during extended space missions, mitigating the adverse effects of space travel on the human body. SIGNIFICANCE: The development of an accurate and adaptable model to quantify caloric expenditure during exercise in space represents a pivotal advancement in space medicine. The insights gained from this study have the potential to inform the design of enhanced health and wellness strategies, ensuring the well-being and operational effectiveness of astronauts in long-duration space missions.

Calorie↗

Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

risk management↗

Optimal trajectories for aeroassisted orbital transfer

Consideration is given to classical and minimax problems involved in aeroassisted transfer from high earth orbit (HEO) to low earth orbit (LEO). The transfer is restricted to coplanar operation, with trajectory control effected by means of lift modulation. The performance of the maneuver is indexed to the energy expenditure or, alternatively, the time integral of the heating rate. Firist-order optimality conditions are defined for the classical approach, as are a sequential gradient-restoration algorithm and a combined gradient-restoration algorithm. Minimization techniques are presented for the aeroassisted transfer energy consumption and time-delay integral of the heating rate, as well as minimization of the pressure. It is shown that the eigenvalues of the Jacobian matrix of the differential system is both stiff and unstable, implying that the sequential gradient restoration algorithm in its present version is unsuitable. A new method, involving a multipoint approach to the two-poing boundary value problem, is recommended.

Miele, A.↗

Minimum energy, liquid hydrogen supersonic cruise vehicle study

The potential was examined of hydrogen-fueled supersonic vehicles designed for cruise at Mach 2.7 and at Mach 2.2. The aerodynamic, weight, and propulsion characteristics of a previously established design of a LH2 fueled, Mach 2.7 supersonic cruise vehicle (SCV) were critically reviewed and updated. The design of a Mach 2.2 SCV was established on a corresponding basis. These baseline designs were then studied to determine the potential of minimizing energy expenditure in performing their design mission, and to explore the effect of fuel price and noise restriction on their design and operating performance. The baseline designs of LH2 fueled aircraft were than compared with equivalent designs of jet A (conventional hydrocarbon) fueled SCV's. Use of liquid hydrogen for fuel for the subject aircraft provides significant advantages in performance, cost, noise, pollution, sonic boom, and energy utilization.

Brewer, G. D.↗

NASA 2nd Generation RLV Program Introduction, Status and Future Plans

The Space Launch Initiative (SLI), managed by the Second Generation Reusable Launch Vehicle (2ndGen RLV) Program, was established to examine the possibility of revolutionizing space launch capabilities, define conceptual architectures, and concurrently identify the advanced technologies required to support a next-generation system. Initial Program funds have been allocated to design, evaluate, and formulate realistic plans leading to a 2nd Gen RLV full-scale development (FSD) decision by 2006. Program goals are to reduce both risk and cost for accessing the limitless opportunities afforded outside Earth's atmosphere fo civil, defense, and commercial enterprises. A 2nd Gen RLV architecture includes a reusable Earth-to-orbit launch vehicle, an on-orbit transport and return vehicle, ground and flight operations, mission planning, and both on-orbit and on-the-ground support infrastructures All segments of the architecture must advance in step with development of the RLV if a next-generation system is to be fully operational early next decade. However, experience shows that propulsion is the single largest contributor to unreliability during ascent, requires the largest expenditure of time for maintenance, and takes a long time to develop; therefore, propulsion is the key to meeting safety, reliability, and cost goals. For these reasons, propulsion is SLI's top technology investment area.

Dumbacher, Dan L.↗

Orbital Propagation of Momentum Exchange Tether Systems

An advanced concept in in-space transportation currently being studied is the Momentum-Exchange/Electrodynamic Reboost Tether System (MXER). The system acts as a large momentum wheel, imparting a Av to a payload in low earth orbit (LEO) at the expense of its own orbital energy. After throwing a payload, the system reboosts itself using an electrodynamic tether to push against Earth's magnetic field and brings itself back up to an operational orbit to prepare for the next payload. The ability to reboost itself allows for continued reuse of the system without the expenditure of propellants. Considering the cost of lifting propellant from the ,ground to LEO to do the same Av boost at $10000 per pound, the system cuts the launch cost of the payload dramatically, and subsequently, the MXER system pays for itself after a small number of missions.1 One of the technical hurdles to be overcome with the MXER concept is the rendezvous maneuver. The rendezvous window for the capture of the payload is on the order of a few seconds, as opposed to traditional docking maneuvers, which can take as long ets necessary to complete a precise docking. The payload, therefore, must be able to match its orbit to meet up with the capture device on the end of the tether at a specific time and location in the future. In order to be able to determine that location, the MXER system must be numerically propagated forward in time to predict where the capture device will be at that instant. It should be kept in mind that the propagation computation must be done faster than real-time. This study focuses on the efforts to find and/or build the tools necessary to numerically propagate the motion of the MXER system as accurately as possible.

John Westerhoff↗