Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit trim maneuver”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Odyssey Mars Orbiter - Thirteen Years of On-Orbit Navigation

The Odyssey spacecraft has been in Mars orbit since October 24, 2001 and has nearly completed 61,490 orbits. Navigation operational objectives include the following: Control the local mean solar time for science observations; for most of the mission, this varied from 3:45 pm to 5:20 pm. Currently, an orbit trim maneuver planned for November 10, 2015 will place Odyssey at 6:45 pm/6:45 am at equator crossings in order to observe early morning ground frost, fog and clouds. Initially, Odyssey was late by 42 minutes for an over-flight of the critical seven minutes of Phoenix's entry, descent and landing (EDL). Odyssey was successfully positioned for this over-flight using the Delta V from angular momentum desaturations (AMD). Similar results for the Mars Science Laboratory's EDL and Comet Siding Spring's minimum risk location will be presented. Odyssey has and continues to relay significant quantities of rover data. Navigation successfully models frequent AMD Delta Vs in order to generate accurate sixty-day trajectory predictions; a typical timing error is 25 seconds after 60 days. However, unexpected events, such as safe-mode entries with their larger and more frequent thrusting, severely impact that trajectory accuracy. Impacted trajectories can have timing errors ranging from a few minutes to ten-to-fifteen minutes after sixty-days. Other analyses (briefly stated) include: a) the offset of the orbital ground track pattern after an initial cycle of 30 days or 362 orbits and b) an operations environment of continuous thrusting if/when one of the three remaining reaction wheels fails.

trajectory accuracy↗

A Viking satellite orbit trim strategy

One strategy is submitted for meeting the varied and stringent requirements of the Viking Project on the control of the satellite orbit to obtain reconnaissance and to prepare for lander release. To satisfy these requirements, different orbit trim maneuver strategies were developed for two typical Viking missions. In addition, a summary of recent numerical results is included to show that this strategy satisfies the mission requirements which have been identified.

Hintz, G. R.↗

Reusable Reentry Satellite (RRS) system design study

The Reusable Reentry Satellite (RRS) is intended to provide investigators in several biological disciplines with a relatively inexpensive method to access space for up to 60 days with eventual recovery on Earth. The RRS will permit totally intact, relatively soft, recovery of the vehicle, system refurbishment, and reflight with new and varied payloads. The RRS is to be capable of three reflights per year over a 10-year program lifetime. The RRS vehicle will have a large and readily accessible volume near the vehicle center of gravity for the Payload Module (PM) containing the experiment hardware. The vehicle is configured to permit the experimenter late access to the PM prior to launch and rapid access following recovery. The RRS will operate in one of two modes: (1) as a free-flying spacecraft in orbit, and will be allowed to drift in attitude to provide an acceleration environment of less than 10(exp -5) g. the acceleration environment during orbital trim maneuvers will be less than 10(exp -3) g; and (2) as an artificial gravity system which spins at controlled rates to provide an artificial gravity of up to 1.5 Earth g. The RRS system will be designed to be rugged, easily maintained, and economically refurbishable for the next flight. Some systems may be designed to be replaced rather than refurbished, if cost effective and capable of meeting the specified turnaround time. The minimum time between recovery and reflight will be approximately 60 days. The PMs will be designed to be relatively autonomous, with experiments that require few commands and limited telemetry. Mass data storage will be accommodated in the PM. The hardware development and implementation phase is currently expected to start in 1991 with a first launch in late 1993.

Source record↗

Cassini Engineering Operations at Saturn

These presentation viewgraphs shows the engineering operations that have contributed to the unprecedented scientific success of the Cassini and Huygens missions, and how engineering operations are planned and implemented in concert with the required sequence of science observations. Frequent Orbit Trim Maneuvers (OTM) keep Cassini on the correct trajectory to complete the planned Saturn Tour. Considerable effort has been invested in detailed planning of the complete set of science observations associated with this Tour, so a robust OTM strategy is necessary to protect this investment by ensuring the spacecraft keeps to the planned trajectory.

systems engineering↗

Onboard Atmospheric Modeling and Prediction for Autonomous Aerobraking Missions

Aerobraking has proven to be an effective means of increasing the science payload for planetary orbiting missions and/or for enabling the use of less expensive launch vehicles. Though aerobraking has numerous benefits, large operations cost have been required to maintain the aerobraking time line without violating aerodynamic heating or other constraints. Two operations functions have been performed on an orbit by orbit basis to estimate atmospheric properties relevant to aerobraking. The Navigation team typically solves for an atmospheric density scale factor using DSN tracking data and the atmospheric modeling team uses telemetric accelerometer data to recover atmospheric density profiles. After some effort, decisions are made about the need for orbit trim maneuvers to adjust periapsis altitude to stay within the aerobraking corridor. Autonomous aerobraking would reduce the need for many ground based tasks. To be successful, atmospheric modeling must be performed on the vehicle in near real time. This paper discusses the issues associated with estimating the planetary atmosphere onboard and evaluates a number of the options for Mars, Venus and Titan aerobraking missions.

Tolson, Robert H.↗

Orbit Determination and Navigation Software Testing for the Mars Reconnaissance Orbiter

During the extended science phase of the Mars Reconnaissance Orbiter's lifecycle, the operational duties pertaining to navigation primarily involve orbit determination. The orbit determination process utilizes radiometric tracking data and is used for the prediction and reconstruction of MRO's trajectories. Predictions are done twice per week for ephemeris updates on-board the spacecraft and for planning purposes. Orbit Trim Maneuvers (OTM-s) are also designed using the predicted trajectory. Reconstructions, which incorporate a batch estimator, provide precise information about the spacecraft state to be synchronized with scientific measurements. These tasks were conducted regularly to validate the results obtained by the MRO Navigation Team. Additionally, the team is in the process of converting to newer versions of the navigation software and operating system. The capability to model multiple densities in the Martian atmosphere is also being implemented. However, testing outputs among these different configurations was necessary to ensure compliance to a satisfactory degree.

Deep Space Network↗

A Flight-Calibrated Methodology for Determination of Cassini Thruster On-Times for Reaction Wheel Biases

This paper describes a methodology for accurate and flight-calibrated determination of the on-times of the Cassini spacecraft Reaction Control System (RCS) thrusters, without any form of dynamic simulation, for the reaction wheel biases. The hydrazine usage and the delta V vector in body frame are also computed from the respective thruster on-times. The Cassini spacecraft, the largest and most complex interplanetary spacecraft ever built, continues to undertake ambitious and unique scientific observations of planet Saturn, Titan, Enceladus, and other moons of Saturn. In order to maintain a stable attitude during the course of its mission, this three-axis stabilized spacecraft uses two different control systems: the RCS and the reaction wheel assembly control system. The RCS is used to execute a commanded spacecraft slew, to maintain three-axis attitude control, control spacecraft's attitude while performing science observations with coarse pointing requirements, e.g. during targeted low-altitude Titan and Enceladus flybys, bias the momentum of reaction wheels, and to perform RCS-based orbit trim maneuvers. The use of RCS often imparts undesired delta V on the spacecraft. The Cassini navigation team requires accurate predictions of the delta V in spacecraft coordinates and inertial frame resulting from slews using RCS thrusters and more importantly from reaction wheel bias events. It is crucial for the Cassini spacecraft attitude control and navigation teams to be able to, quickly but accurately, predict the hydrazine usage and delta V for various reaction wheel bias events without actually having to spend time and resources simulating the event in flight software-based dynamic simulation or hardware-in-the-loop simulation environments. The methodology described in this paper, and the ground software developed thereof, are designed to provide just that. This methodology assumes a priori knowledge of thrust magnitudes and thruster pulse rise and tail-off time constants for eight individual attitude control thrusters, the spacecraft's wet mass and its center of mass location, and a few other key parameters.

Earth Mean Equatorial↗

The Cassini Live Update Process

The Cassini orbiter is an international science mission to the Saturnian system with 12 science instruments onboard. The Cassini spacecraft lacks a scan platform, which means the entire spacecraft must be rotated to control pointing of any one instrument's boresight. The resulting complex sequences of commands are built beginning many months before execution onboard. Late ephemeris updates from improved navigation data (i.e. after an orbital trim maneuver) often result in pointing commands in the sequence no longer being accurate enough to obtain the desired science observation. This paper will provide an overview of how Cassini uses live updates to address this potential loss of data, including the software developed for this process.

Vandermey, Nancy↗

Cassini's Grand Finale: A Mission Planning Retrospective

On September 15, 2017, Cassini plunged deep into Saturn, down to where the atmosphere was sufficiently dense to destroy the spacecraft, making it part of Saturn forever. In the five months leading up to its destruction, Cassini flew between Saturn and its rings 22 times, collecting data from the never before-explored region of the Kronian system. These orbits, the Grand Finale of Cassini, were the culmination of years of planning by the Cassini flight team. This paper looks back upon the mission planning effort in particular, comparing the baseline operational scenarios and contingency plans to the as flown Grand Finale. The bulk of the Grand Finale mission planning effort was focused on the environmental hazards present in the region between Saturn and its rings: the dust and the atmosphere. Dust hazard and atmospheric transit contingency plans were in place to help ensure spacecraft health and maximize science data return. The dust hazard plan gave the operations team the option to turn the spacecraft to a safe attitude during ring-plane crossings had the dust environment proved more threatening than anticipated. The atmospheric transit plan would have made use of an orbital trim maneuver in order to raise or lower periapsis depending on the density of the atmosphere. The proximal environment did have its surprises, though they were good surprises. The dust was significantly less hazardous than predicted. So much so that elements of the contingency plan were leveraged in order to remove a dust hazard protection from the baseline plan, rather than add one to it. While the atmosphere was substantially denser than predicted, it was not dense enough to warrant a periapsis-raise maneuver and actually meant that better in-situ data was gathered. Ultimately, from a mission planning perspective, the Grand Finale went better than expected.

Sturm II, Erick J.↗

The Cassini Grand Finale Mission: Planning for a New Mission Environment

The Cassini F-Ring & Proximal Orbits (FRPO) is a new and unique mission; to ensure the highest priority science gets implemented, the POST (Proximal Orbit Science Team) was created to pre-allocate the time around periapse for all 22 proximal orbits. The F-ring orbits, and proximal time outside of POST, were handled similar to Cassini’s Solstice Mission using the Pre-Integrated Event (PIE) process. The new and unique properties of the spacecraft’s trajectory required much forethought to be flown safely while still planning for the most and best science return possible. Some ring-plane crossings (RPX) will be protected against dust impacts by turning the high gain antenna (HGA) to the dust RAM direction (HGA2RAM). If on the first proximal RPX higher than expected dust readings are seen then the Project Office may choose to require more (all) subsequent RPX to be HGA2RAM, implemented via a real-time command overlay for uplinked sequences. The pointing uncertainties will be larger than usual after the final targeted flyby; some of the process changes to address this include adding extra orbit trim maneuvers (OTMs) (fuel permitting) to resync to the reference trajectory and reduce pointing uncertainties; and movable blocks of commands to be used for some periapses where atmospheric drag may cause large timing shifts Changes made for FRPO to address perceptions that these sequences will be hard to implement include requiring early pointing designs (during integration) for certain types of observations, requiring teams to check early on that they can turn to and from their observation attitude, and that their attitude is safe, and adjusting the Implementation process to give more time for science observation designers. This paper will discuss these process changes and lessons learned so far.

Ray, Trina↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the pre-Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Signorelli, Joel↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Kumar, Meghana↗

Power subsystem performance prediction /PSPP/ computer program.

A computer program which simulates the operation of the Viking Orbiter Power Subsystem has been developed. The program simulates the characteristics and interactions of a solar array, battery, battery charge controls, zener diodes, power conditioning equipment, and the battery spacecraft and zener diode-spacecraft thermal interfaces. This program has been used to examine the operation of the Orbiter power subsystem during critical phases of the Viking mission - from launch, through midcourse maneuvers, Mars orbital insertion, orbital trims, Lander separation, solar occultations and unattended operation - until the end of the mission. A typical computer run for the first 24 hours after launch is presented which shows the variations in solar array, zener diode, battery charger, batteries and user load characteristics during this period.

Weiner, H.↗

Orbit trim strategies for the 1975 Mars Viking mission

Propulsive maneuver strategies have been developed for the Mars orbital phases of the Viking mission, including the activities before and after lander deployment. These strategies have been formulated as fixed sequences of orbit parameter-correction maneuvers which will be performed on specified spacecraft revolutions. Certain adaptive features are also available to ensure efficient use of propellants. Numerical simulations demonstrate that it is possible (to within a very high probability) to satisfy mission requirements on orbital navigation, using these strategies and Viking technology.

Hintz, G. R.↗

Orbit and attitude determination results during launch support operations for SBS-5

Presented are orbit and attitude determination results from the launch of Satellite Business Systems (SBS)-5 satellite on September 8, 1988 by Arianespace. SBS-5 is a (HS-376) spin stabilized spacecraft. The launch vehicle injected the spacecraft into a low inclination transfer orbit. Apogee motor firing (AMF) attitude was achieved with trim maneuvers. An apogee kick motor placed the spacecraft into drift orbit. Postburn, reorientation and spindown maneuvers were performed during the next 25 hours. The spacecraft was on-station 19 days later. The orbit and attitude were determined by both an extended Kalman filter and a weighted least squares batch processor. Although the orbit inclination was low and the launch was near equinox, post-AMF analysis indicated an attitude declination error of 0.034 deg., resulting in a saving of 8.5 pounds of fuel. The AMF velocity error was 0.4 percent below nominal. The post-AMF drift rate was determined with the filter only 2.5 hours after motor firing. The filter was used to monitor and retarget the reorientation to orbit normal in real time.

Hartman, K. R.↗

Orbit determination strategy and results for the Pioneer Venus Orbiter mission

This paper examines the orbit of the Pioneer Venus Orbiter as determined from earth based radio data. The basic orbit determination strategy together with its associated accuracy is presented, and the effect of the changing earth-Venus geometry on that accuracy is discussed. Orbital evolution from insertion to the present time is described and related to the primary forces acting on the spacecraft as well as to the weekly periapsis altitude trim maneuvers. Lastly, the technique used for orbit prediction in the presence of the uncertain Venus atmosphere and gravity environment is discussed.

Jacobson, R. A.↗

Orbit determination support for Hiten's aerobraking in the Earth's atmosphere

Two passes of the ISAS (Japan's Institute of Space and Astronautical Science) Hiten spacecraft through the Earth's atmosphere, at perigee altitudes of 125 km and 120 km, during Mar. 1991 marked the first aerobraking technology demonstrations for an object in cis-lunar orbit traveling at near Earth escape velocity. Prediction and control of perigee altitude to better than 1 km was desired to assure spacecraft survival. Covariance analysis provided confidence that prediction accuracy better than 200 m for support of final trim maneuver design was achievable with NASA DSN (Deep Space Network) tracking support. ISAS used orbit determination results in their decisions to cancel final trim maneuvers. Post flight reconstructions, marking the first combined use of DSN and ISAS tracking data, yielded perigee altitude solutions which agree with the near real time mission operations support predictions to better than 50 m.

Efron, L.↗

Mars Observer mission

The salient features of the Mars Observer mission are overviewed. Special attention is given to the science objectives of the mission, the spacecraft design, the mapping orbit to be used, and the mission operations. The mission is to be launched in August 1993 and, after four months of trim maneuvers, will come into a low-altitude circular orbit where it will make systematic measurements of the atmosphere, the surface, and the interior of Mars.

Albee, A. L.↗