Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.

A comparative evaluation plan for the Maintenance, Inventory, and Logistics Planning (MILP) System Human-Computer Interface (HCI)

The primary goal of this project was to develop a tailored and effective approach to the design and evaluation of the human-computer interface (HCI) to the Maintenance, Inventory and Logistics Planning (MILP) System in support of the Mission Operations Directorate (MOD). An additional task that was undertaken was to assist in the review of Ground Displays for Space Station Freedom (SSF) by attending the Ground Displays Interface Group (GDIG), and commenting on the preliminary design for these displays. Based upon data gathered over the 10 week period, this project has hypothesized that the proper HCI concept for navigating through maintenance databases for large space vehicles is one based upon a spatial, direct manipulation approach. This dialogue style can be then coupled with a traditional text-based DBMS, after the user has determined the general nature and location of the information needed. This conclusion is in contrast with the currently planned HCI for MILP which uses a traditional form-fill-in dialogue style for all data access and retrieval. In order to resolve this difference in HCI and dialogue styles, it is recommended that comparative evaluation be performed which combines the use of both subjective and objective metrics to determine the optimal (performance-wise) and preferred approach for end users. The proposed plan has been outlined in the previous paragraphs and is available in its entirety in the Technical Report associated with this project. Further, it is suggested that several of the more useful features of the Maintenance Operations Management System (MOMS), especially those developed by the end-users, be incorporated into MILP to save development time and money.

Overmyer, Scott P.

Plan de Acción Comunitario de Energía: Pastillo Tibes [Community Energy Action Plan: Pastillo Tibes]

El Plan de Acción Comunitario de Energía para Pastillo Tibes es una estrategia integral orientada a fortalecer la resiliencia del sistema eléctrico en la comunidad frente a los desafios energéticos. Este documento preliminar enfatiza la importancia de asumir la responsabilidad del plan, además de la inclusión y la adaptabilidad en el proceso de planificación, y está especificamente diseñado para esta comunidad.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record

Configuration evaluation and criteria plan. Volume 1: System trades study and design methodology plan (preliminary). Space Transportation Main Engine (STME) configuration study

The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.

Bair, E. K.

An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

Kalu, Alex

Temporal planning for transportation planning and scheduling

In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

Frederking, Robert E.

Path planning algorithms for assembly sequence planning

Planning for manipulation in complex environments often requires reasoning about the geometric and mechanical constraints which are posed by the task. In planning assembly operations, the automatic generation of operations sequences depends on the geometric feasibility of paths which permit parts to be joined into subassemblies. Feasible locations and collision-free paths must be present for part motions, robot and grasping motions, and fixtures. This paper describes an approach to reasoning about the feasibility of straight-line paths among three-dimensional polyhedral parts using an algebra of polyhedral cones. A second method recasts the feasibility conditions as constraints in a nonlinear optimization framework. Both algorithms have been implemented and results are presented.

Krishnan, S. S.

The road plan model: Information model for planning road building activities

The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

Azinhal, Rafaela K.

Plan energético estratégico: Playa de Ponce, Ponce, Puerto Rico [Strategic Energy Plan: Playa de Ponce, Ponce, Puerto Rico]

Un Nuevo Amanecer Inc. (UNA), a community-based NGO (501C(3)), sought technical assistance through the U.S. Department of Energy's (DOE's) Energy Technology Innovation Partnership Project (ETIPP) to develop a strategic energy plan (SEP) for the community of Playa de Ponce on the south coast of Puerto Rico. A SEP helps communities identify energy goals and priority projects, and outline strategies and actions to build a shared path toward their energy vision.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Mission planning and analysis division development plan for STS-2 through STS-4

The baseline products, schedules, and resource requirements for the Mission Planning and Analysis Division's support of Space Transportation System flights 2, 3, and 4 are presented. Major functions addressed are: orbiter software, Mission Control Center software, flight design, flight operations support, simulation tools, and postflight analysis.