Search NASA⌕ Search

SEARCH · Search NASA

Results for “power simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Rapid ISS Power Availability Simulator

The ISS (International Space Station) Power Resource Officers (PROs) needed a tool to automate the calculation of thousands of ISS power availability simulations used to generate power constraint matrices. Each matrix contains 864 cells, and each cell represents a single power simulation that must be run. The tools available to the flight controllers were very operator intensive and not conducive to rapidly running the thousands of simulations necessary to generate the power constraint data. SOLAR is a Java-based tool that leverages commercial-off-the-shelf software (Satellite Toolkit) and an existing in-house ISS EPS model (SPEED) to rapidly perform thousands of power availability simulations. SOLAR has a very modular architecture and consists of a series of plug-ins that are loosely coupled. The modular architecture of the software allows for the easy replacement of the ISS power system model simulator, re-use of the Satellite Toolkit integration code, and separation of the user interface from the core logic. Satellite Toolkit (STK) is used to generate ISS eclipse and insulation times, solar beta angle, position of the solar arrays over time, and the amount of shadowing on the solar arrays, which is then provided to SPEED to calculate power generation forecasts. The power planning turn-around time is reduced from three months to two weeks (83-percent decrease) using SOLAR, and the amount of PRO power planning support effort is reduced by an estimated 30 percent.

Downing, Nicholas↗

Mathematical simulation of power conditioning systems. Volume 1: Simulation of elementary units. Report on simulation methodology

Methods and algorithms used for the simulation of elementary power conditioning units buck, boost, and buck-boost, as well as shunt PWM are described. Definitions are given of similar converters and reduced parameters. The various parts of the simulation to be carried out are dealt with; local stability, corrective network, measurements of input-output impedance and global stability. A simulation example is given.

Prajous, R.↗

A Clustering-Based Scenario Generation Framework for Power Market Simulation with Wind Integration

A critical step in stochastic optimization models of power system analysis is to select a set of appropriate scenarios and significant numbers of scenario generation methods exist in the literature. This paper develops a clustering based scenario generation method, which aims to improve the performance of existing scenario generation techniques by grouping a set of correlated wind sites into clusters according to their cross-correlations. Copula based models are utilized to model spatiotemporal correlations and the Gibbs sampling is then used to generate scenarios for day-ahead markets. Our results show that the generated scenarios based on clustered wind sites outperform existing approaches in terms of reliability and sharpness and can reduce the total computational time for scenario generation and reduction significantly. The clustering-based framework can therefore provide a better support for real-world market simulations with high wind penetration.

data visualization↗

Coupling of CTF and RELAP5-3D Within an Enhanced Fidelity Nuclear Power Plant Simulator

A robust and accurate multiphysics engineering simulator is being developed to model the core behavior and system response of pressurized water reactors. This simulator relies on the NESTLE and CTF computer codes to model the neutronics and thermal hydraulics (TH), respectively, inside the core on a nodal scale and on the Reactor Excursion and Leak Analysis Program—Three Dimensional (RELAP5-3D) to model the entire nuclear steam supply system. The RELAP5-3D model includes highly detailed nodalization and multidimensional flow modeling throughout the vessel. Previously, pin-resolved data generated via the Virtual Environment for Reactor Analysis core simulator were used to improve the accuracy of the NESTLE core predictions. The engineering simulator being developed as part of this work uses the 3KEYMASTER platform to couple the enhanced NESTLE model to a nodal-fidelity CTF model to balance run time with accuracy; NESTLE provides node-dependent powers to CTF, and CTF provides node-dependent coolant densities and fuel temperatures to NESTLE.An overlapping domain approach is used for the core TH in which RELAP5-3D provides core boundary conditions based on the system response and CTF provides a node-dependent coolant heating rate to the RELAP5-3D core solution. In the preliminary TH demonstration discussed in this paper, CTF and RELAP5-3D provided similar steady-state core predictions, indicating the hydraulic compatibility between the codes, as well as reasonable and expected behavior under hypothetical transient conditions. This provides an initial step in ongoing efforts toward a robust, multiscale TH/neutronics engineering simulator capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Airflow calibration of a bellmouth inlet for measurement of compressor airflow in turbine-powered propulsion simulators

The development of turbine-powered propulsion simulators for high-speed wind tunnel models requires a bellmouth inlet which can accurately measure compressor-inlet airflow. A bellmouth inlet was instrumented with total pressure probes, static pressure probes, and thermocouples for airflow measurement. The bellmouth flowmeter against a critical venturi flowmeter was calibrated. The calibration was done at four inlet pressures ranging from 58 to 114 kPa. The bellmouth discharge coefficient varied as a function of bellmouth-throat Mach number. Over the range of Reynolds number and Mach number tested the Reynolds number was not a significant influence on the discharge coefficient. The overall accuracy of the bellmouth inlet as a flowmeter was estimated to be + or - 0.5% of the flowmeter reading.

Smith, S. C.↗

Incorporation of Thermal Hydraulic Models for Thermal Power Dispatch into a PWR Power Plant Simulator

This report describes the development, modeling, and results of a generic pressurized water reactor power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process located approximately one kilometer from the nuclear power plant. The simulator is a commercial PWR simulator that has been modified to include thermal power dispatch as described in past milestone reports [ , ]. The commercial PWR simulator is a generic simulator available from GSE SYSTEMS® (Sykesville, MD, USA) that is built using RELAP5-HDTM Real-Time Solution and in-house software developed by GSE Systems. This generic PWR (GPWR) simulator performs real-time simulation of the complete power plant from the reactor neutronics to the electricity generation and distribution. All primary, secondary, and auxiliary systems are modeled including all control logic in order to provide the most accurate representation of actual nuclear power plant (NPP) operation, and the simulator results have been rigorously verified by an actual NPP operating at approximately 1 GWe. This report is a continuation of worked performed in previous years, and supplemental information from previous reports is included in the appendix for reference.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hardware-based Advanced Electromagnetic Transient Simulation for A Large-Scale PV Plant in Real Time Digital Simulator

Power electronics-based resources, such as high-voltage direct current (HVdc) substations, photovoltaic (PV) plants, wind plants, electric vehicle charging stations, and energy storage systems, are increasingly being integrated within the power grid. Recently, multiple reports have emphasized the necessity for high-fidelity electromagnetic transient (EMT) simulations of these large-scale power electronics-based resources to accurately understand their behavior in power grids. However, performing hardware-based EMT simulations with high-fidelity models for such large power electronics systems is challenging due to the small time-step requirements and the involvement of a large number of states. This paper presents the implementation of hardware-based high-fidelity EMT dynamic model of a large-scale PV plant, accomplished through custom model development using the specific-C language in real-time digital simulator hardware (RTDS) and software (RSCAD).

Choi, Jongchan↗

Efficient and Robust Dynamic Simulation of Power Systems With Holomorphic Embedding

Dynamic simulation is vitally important in power system analysis, but traditional approaches based on numerical integration over small time steps are time-consuming. Also, the Newton-Raphson method suffers from difficulty in convergence when solving nonlinear algebraic equations. In this paper, we propose a novel dynamic simulation approach based on holomorphic embedding. By obtaining a high-order approximation of system dynamics, it achieves a much larger time step and thus enhances the computational efficiency significantly. In addition, the new approach avoids non-convergence issues in solving algebraic equations, which improves robustness. The approach includes flexible modeling of synchronous generators and controllers, and we propose a method for modeling generator coordinate transformations. The approach is tested on the IEEE 39-bus, 10-generator system and a Polish 2383-bus, 327-generator system. The results demonstrate promising computational efficiency and satisfactory numerical robustness for the analysis of large-scale power systems.

42 ENGINEERING↗

Development and Demonstration of a Reduced-Order PWR Power Dispatch Simulator

This report describes the development, modeling, and results of a reduced-order thermal power dispatch pressurized water reactor (RO-TPD-PWR) power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process. The simulator is built on models that have been developed in previous work, including a Rancor Microworld model previously developed by INL and the University of Idaho [Ref] and reactor core and secondary system models that have been published previously [Ref]. The simulator also includes a scalable model of a high temperature electrolysis (HTE) system that has been developed at INL. A particular benefit of the Rancor Microworld model is that it is compatible with a human-system interface (HMI) that has already been developed by the Human System Simulation Laboratory (HSSL) at INL that can emulate the control room of a PWR for realistic human-in-the-loop studies with mock nuclear power plant operating procedures. The results of these human-in-the-loop tests will be compared with similar tests using a commercial full-scope generic PWR (GPWR) simulator that has been modified to include thermal power dispatch, referred to as the TPD-GPWR [ , ]. The simplicity of the RO-TPD-PWR helps to better understand and verify the results of the TPD-GPWR, which employs >1,000 variables and has much greater complexity. A second key purpose of the RO-TPD-PWR simulator is that its relative simplicity allows it scale between lab-size equipment (~100 kW) and full-scale nuclear power plants (~1 GW) by adjusting only a few parameters in the models, such as fluid masses and heat exchanger areas. The RO-TPD-PWR simulator will be used to guide the controls of lab tests, so that equipment in those tests, such as the Thermal Energy Distribution System (TEDS) and pilot-scale high temperature electrolysis (HTE) units at scales of 50-250 kW, may operate in a manner that is relevant to full-scale PWR operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources

The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.

EMT simulation↗

Emerging Computing Architectures: Simulation of Power Electronics in Power Grids

As the penetration of power electronics increases in power grids, new computing architectures needed to be evaluated for the simulation of high-fidelity models of power electronics in power grids in operations. In this paper, emerging computing architectures such as quantum processing units are evaluated for the simulation of power electronics in power grids. A hybrid algorithm based on classical computing and quantum computing is developed and tested for different use cases of electromagnetic transient (EMT) simulation of power electronics (PE)-based systems and simple circuits. The algorithms needed to simulate power electronics in emerging computing architectures are discussed and thereafter, simulation results are shown.

Debnath, Suman↗

Numerical Propulsion System Simulation (NPSS) Power Systems Library

This presentation covers the Numerical Propulsion System Simulation (NPSS) Power Systems Library being developed by NASA. This library is a set of components, models, and interfaces for the NPSS language to enable building electric power system models for electrified propulsion systems. The presentation is to be given at the 3rd annual RVLT Toolchain Workshop, where attendees from across the eVTOL industry will be informed of NASA’s tools for eVTOL conceptual design from the vehicle level down through subsystems including propulsion, noise, electrical power, and others. It covers where the NPSS Power System Library fits into NASA’s RVLT toolchain and RVLT work in general, and will inform the audience of how the tool can be useful in their own work.

Electric vertical takeoff and landing↗

Rain-fade simulation and power augmentation for satellite communication systems

The design and implementation of an automated rain-fade simulation and power augmentation system is presented. The system experimentally simulates and measures the effects of radiofrequency power fade on a 20 GHz communication link using a multimode travelling wave tube amplifier for loss compensation. Precision, computer-controlled attenuators are used in the fade simulation. Test plans for analog and digital testing are discussed.

Shalkhauser, Kurt A.↗

Large-Scale Grid Models: Synthetic Data and Co-Simulation

Power grid modernization and wide-spread distributed energy resource (DER) integration are driving an explosion of interest in advanced algorithms and new optimization schemes. However, there has historically been a lack of open-access realistically sized and detailed datasets-particularly for the distribution system-and simulation tools able to model these systems. This talk will present recent advances with very large-scale (>>1M nodes) distribution data sets and the use of co-simulation to tractably model large integrated transmission-distribution grids and their interactions with new controls/optimization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Applied Mathematics Challenge: Simulation of Power Electronics in Future Power Grid

There has been a buzz around increased grid modernization for more than a decade. Grid modernization includes, but is not limited to, upgrades to the grid to enhance reliability, resilience, security, and access to clean energy sources. One significant change that has been happening in this context is the increased penetration of computing power and controlled devices like power electronics in the power grid. As this change happens, the operation and characteristics of the power grid are set to undergo a significant change. The power grid moves from an older electric machine dominated grid that used analog electronics for controls to a power electronics dominated grid that uses digital computing for controls. As this transition happens, there are significant problems of applied mathematics that will need to be resolved in power electronics and power grid. The problems include the ability to simulate in different timescales, while also leveraging the significantly improved computing capabilities available today. In this paper, the challenges related to simulation of power electronics are discussed and the challenge problems laid down that applied mathematics may help resolve in future.

Debnath, Suman↗

Smart-PGSim: Using Neural Network to Accelerate AC-OPF Power Grid Simulation

In this work we address the problem of accelerating complex power-grid simulation through machine learning ( ML). Specifically, we develop a framework, Smart-PGSim,which generates multitask-learning (MTL) neural network (NN)models to predict the initial values of variables critical to the problem convergence. MTL models allow information sharing when predicting multiple dependent variables while including customized layers to predict individual variables. We show that,to achieve the required accuracy, it is paramount to embed domain-specific constraints derived from the specific power-grid components in the MTL model. Smart-PGSim then employs the predicted initial values as a high-quality initial condition for the power-grid numerical solver (warm start), resulting in both higher performance compared to state-of-the-art solutions while maintaining the required accuracy. Smart-PGSim brings 2.60×speedup on average (up to 3.28×) computed over 10,000 problems, without losing solution optimality.

machine learning, neural networks↗