Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk constraints”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Generalized Quantum Convolution for Multidimensional Data

The convolution operation plays a vital role in a wide range of critical algorithms across various domains, such as digital image processing, convolutional neural networks, and quantum machine learning. In existing implementations, particularly in quantum neural networks, convolution operations are usually approximated by the application of filters with data strides that are equal to the filter window sizes. One challenge with these implementations is preserving the spatial and temporal localities of the input features, specifically for data with higher dimensions. In addition, the deep circuits required to perform quantum convolution with a unity stride, especially for multidimensional data, increase the risk of violating decoherence constraints. In this work, we propose depth-optimized circuits for performing generalized multidimensional quantum convolution operations with unity stride targeting applications that process data with high dimensions, such as hyperspectral imagery and remote sensing. We experimentally evaluate and demonstrate the applicability of the proposed techniques by using real-world, high-resolution, multidimensional image data on a state-of-the-art quantum simulator from IBM Quantum.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

First Sagittarius A* Event Horizon Telescope Results. V. Testing Astrophysical Models of the Galactic Center Black Hole

In this paper we provide a first physical interpretation for the Event Horizon Telescope's (EHT) 2017 observations of Sgr A*. Our main approach is to compare resolved EHT data at 230 GHz and unresolved non-EHT observations from radio to X-ray wavelengths to predictions from a library of models based on time-dependent general relativistic magnetohydrodynamics simulations, including aligned, tilted, and stellar-wind-fed simulations; radiative transfer is performed assuming both thermal and nonthermal electron distribution functions. We test the models against 11 constraints drawn from EHT 230 GHz data and observations at 86 GHz, 2.2μm, and in the X-ray. All models fail at least one constraint. Light-curve variability provides a particularly severe constraint, failing nearly all strongly magnetized (magnetically arrested disk (MAD)) models and a large fraction of weakly magnetized models. A number of models fail only the variability constraints. We identify a promising cluster of these models, which are MAD and have inclination i ≤ 30°. They have accretion rate (5.2–9.5) × 10$^{−9}$ M $_{⊙}$ yr$^{−1}$, bolometric luminosity (6.8–9.2) × 10$^{35}$ erg s$^{−1}$, and outflow power (1.3–4.8) × 10$^{38}$ erg s$^{−1}$. We also find that all models with i ≥ 70° fail at least two constraints, as do all models with equal ion and electron temperature; exploratory, nonthermal model sets tend to have higher 2.2μm flux density; and the population of cold electrons is limited by X-ray constraints due to the risk of bremsstrahlung overproduction. Finally, we discuss physical and numerical limitations of the models, highlighting the possible importance of kinetic effects and duration of the simulations.

79 ASTRONOMY AND ASTROPHYSICS↗

The Design of a Multiphase CO2 Turbine Test Facility

As the energy market continues to evolve with increased renewables, such as solar and wind energy, the need to balance energy demand with its availability has become increasingly more challenging. The country’s aggressive decarbonization goals in the upcoming decades will increase renewable energy market penetration, thus exacerbating the disparity between energy demand and renewable resource availability. Long-duration energy storage technologies, such as pumped thermal energy storage (PTES), are potential solutions to this challenge with high potential round-trip efficiency (RTE), no geological or geographical constraints, and low safety risks. The charge mode of a PTES system operates a heat pump cycle, converting input power to thermal energy in hot and cold reservoirs. Fundamentally, heat pumps are commonly used in daily life, but the operating conditions required by high RTE PTES systems are outside the design experience of these systems. The low-pressure side of the cycle for a supercritical CO2 (sCO2) PTES operates just above the vapor-dome and potentially drives the turbine to expand into the dome, resulting in multiphase operation in the rear stages of the turbine. This paper presents the design of the test facility for an advanced multiphase-tolerant sCO2 turbine for the heat pump of a PTES system. Heat rejection and pressure loss estimations for the multiphase sections of the test loop presented unforeseen challenges.

25 ENERGY STORAGE↗

Constraints on OPF Surrogates for Learning Stable Local Volt/Var Controllers

We consider the problem of learning local Volt/Var controllers in distribution grids (DGs). Our approach starts from learning separable surrogates that take both local voltages and reactive powers as arguments and predict the reactive power setpoints that approximate optimal power flow (OPF) solutions. We propose an incremental control algorithm and identify two different sets of slope conditions on the local surrogates such that the network is collectively steered toward desired configurations asymptotically. Our results reveal the trade-offs between each set of conditions, with coupled voltage-power slope constraints allowing an arbitrary shape of surrogate functions but risking limitations on exploiting generation capabilities, and reactive power slope constraints taking full advantage of generation capabilities but constraining the shape of surrogate functions. AC power flow simulations on the IEEE 37-bus feeder illustrate their guaranteed stability properties and respective advantages in two DG scenarios.

asymptotic stability↗

A High-Speed High-Power-Density Non-Heavy Rare-Earth Permanent Magnet Traction Motor

There has been a global push for higher torque density and lower cost traction motors. The use of non-heavy rare-earth (non-HRE) permanent magnet materials in traction motors are being investigated for the sustainability, profitability and affordability of electric vehicles and to broaden their adoption. A 20,000-rpm permanent magnet traction motor using non-HRE magnet materials is proposed. A dual three-phase winding configuration driven by a segmented dual three-phase drive is proposed to reduce the current ripple, and as a result, the DC Link capacitor, as well as to ease the voltage constraint at high speed and eliminate any risk of uncontrolled regeneration. Furthermore, the dual winding configuration enables a fault tolerant design which is useful for reliability. The paper presents comprehensive electromagnetic, thermal and mechanical designs and analyses using an integrated approach. The results have shown that the design is robust against demagnetization and confirmed its thermal and mechanical viability.

47 OTHER INSTRUMENTATION↗

Conformal Avoidance of Normal Organs at Risk by Perfusion-Modulated Dose Sculpting in Tumor Single-Dose Radiation Therapy

Although 24 Gy single-dose radiation therapy (SDRT) renders >90% 5-year local relapse-free survival in human solid tumor lesions, SDRT delivery is not feasible in ∼50% of oligometastatic lesions owing to interference by dose/volume constraints of a serial organ at risk (OAR). Conformal OAR avoidance is based on a hypothetical model positing that the recently described SDRT biology specifically permits volumetric subdivision of the SDRT dose, such that high-intensity vascular drivers of SDRT lethality, generated within a major tumor subvolume exposed to a high 24 Gy dose (high-dose planning target volume [PTV{sub HD]}), would equilibrate SDRT signaling intensity throughout the tumor interstitial space, rendering bystander radiosensitization of a minor subvolume (perfusion-modulated dose sculpting PTV [PTV{sub PMDS}]), dose-sculpted to meet a serial OAR dose/volume constraint. An engineered PTV{sub PMDS} may thus yield tumor ablation despite PMDS dose reduction and conformally avoiding OAR exposure to a toxic dose.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

A shared-mobility-based framework for evacuation planning and operations under forecast uncertainty

To meet evacuation needs from carless populations who need personalized assistance to evacuate safely, in this article we propose a ridesharing-based evacuation program that recruits volunteer drivers before a disaster strikes, and then matches volunteer drivers with evacuees once demand is realized. Here we optimize resource planning and evacuation operations under uncertain spatiotemporal demand, and construct a two-stage stochastic mixed-integer program to ensure high demand fulfillment rates. We consider three formulations to improve the number of evacuees served, by minimizing an expected penalty cost, imposing a probabilistic constraint, and enforcing a constraint on the conditional value at risk of the total number of unserved evacuees, respectively. We discuss the benefits and disadvantages of the different risk measures used in the three formulations, given certain carless population sizes and the variety of evacuation modes available. We also develop a heuristic approach to provide quick, dynamic and conservative solutions. We demonstrate the performance of our approaches using five different networks of varying sizes based on regions of Charleston County, South Carolina, an area that experienced a mandatory evacuation order during Hurricane Florence, and utilize real demographic data and hourly traffic count data to estimate the demand distribution.

97 MATHEMATICS AND COMPUTING↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Gains in operational flexibility, safety margins, and cost efficiencies via integrated Plant Reload Optimization platform

The U.S. Department of Energy Light Water Reactor Sustainability Program Risk-Informed Systems Analysis Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimizing core design. Optimizing the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible core configuration options, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization platform, which supports artificial-intelligence-based reactor core designing, is now fully capable of handling realistic problems. The Plant ReLoad Optimization platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual ENvironment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multiobjective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pressurized-Water Reactor Core Design using Multi-Objective Plant Fuel Reload Optimization Platform

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program Risk-Informed Systems Analysis (RISA) Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimization of core design. The optimization of the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible options of core configuration, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization (PRLO) platform which supports artificial-intelligence-based reactor core designing is now fully capable of handling realistic problems. The PRLO Platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm-II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual Environment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multi-objective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

42 ENGINEERING↗

Stochastic scheduling of generating units with weekly energy storage: A hybrid decomposition approach

We propose a solution method for the large-scale stochastic unit commitment (SUC) problem with weekly-dispatched energy storage and significant weather-dependent stochastic generating capacity. Weekly storage facilities that mostly charge during weekends and discharge during weekdays require a weekly scheduling of generating units, which result in a large-scale optimization problem. This SUC problem is formulated as a two-stage stochastic model and we use the conditional value-at-risk as a risk measure. Using a Benders framework, the proposed solution method decomposes the problem into a mixed-integer linear master problem and linear and continuous subproblems. The master problem corresponds to the first-stage decisions throughout the week and includes all the commitment (binary) variables and their corresponding constraints. The subproblems correspond to the actual dispatch of the generating units on a weekly basis. Based on the success of column-and-constraint generation algorithms to solve robust optimization problems, we improve the low communication between the master problem and the subproblems in the standard Benders decomposition by adding primal variables and constraints from the subproblems to the master problem, which provides a better approximation of the recourse function. Furthermore, our computational experiments demonstrate the effectiveness of the proposed decomposition method using an instance of the South Carolina synthetic system with 90 generating units under 40 scenarios.

25 ENERGY STORAGE↗

Power Plant Water Risk and Adaptive Measures Database

Project objective was to understand water-related constraints affecting conventional powerplant operations, specifically coal-fired power plants. Of concern were threats related to drought and flood affecting both water supply and ability of plant to discharge wastewater. Also of interest were adaptive measures taken to mitigate identified threats. This spreadsheet contains the responses provided by the power plant operators and owners. Data have been "sanitized" (e.g., random plant ID, binned location and generation capacity information) to ensure anonymity of individual power plants.

Adaptive Measures↗

Exploring the fusion power plant design space: comparative analysis of positive and negative triangularity tokamaks through optimization

The optimal configuration choice between positive triangularity (PT) and negative triangularity (NT) tokamaks for fusion power plants hinges on navigating different operational constraints rather than achieving specific plasma performance metrics. This study presents a systematic comparison using constrained multi-objective optimization with the integrated FUsion Synthesis Engine (FUSE) framework. Over 200 000 integrated design evaluations were performed exploring the trade-offs between capital cost minimization and operational reliability (maximizing q 95 ) while satisfying engineering constraints including 250 ± 50 MW net electric power, tritium breeding ratio > 1.1, power exhaust limits and an hour flattop time. Both configurations achieve similar cost-performance Pareto fronts through contrasting design philosophies. PT, while demonstrating resilience to pedestal degradation (compensating for up to 40% reduction), are constrained to larger machines (R 0 > 6.5 m) by the narrow operational window between L–H threshold requirements and the research-established power exhaust limit (P sol /R < 15 MW m –1 ). This forces optimization through comparatively reduced magnetic field (∼8 T). NT configurations exploit their freedom from these constraints to access compact, high-field designs (R 0 ~ 5.5 m, B 0 >12 T), creating natural synergy with advancing HTS technology. Sensitivity analyses reveal that PT’s economic viability depends critically on uncertainties in L–H threshold scaling and power handling limits. Notably, a 50% variation in either could eliminate viable designs or enable access to the compact design space. These results suggest configuration selection should be risk-informed: PT offers the lowest-cost path when operational constraints can be confidently predicted, while NT is robust to large variations in constraints and physics uncertainties.

FUSE framework↗

Probabilistic feasibility assessment of sequestration reliance for climate targets

Countries worldwide are transforming their energy systems to achieve Carbon-Neutrality. Investing in renewable resources-based technologies and implementing Carbon Capture and Storage (CCS) are common strategies to achieve higher sequestration levels. Negative emissions through Bioenergy with CCS are expected to play an essential role in the transition to full decarbonization. On top of that, biomass is a limited resource that depends on environmental factors, which create uncertainties related to the amount that can be sustainably provided to the energy system. Here this study emphasizes the relevance of variability in carbon sequestration for achieving climate targets by 2050. Here this paper proposes a probabilistic approach that integrates the Global Change Analysis Model for Latin America (GCAM-LA) with a chance constraint approach. GCAM-LA is used to assess the impact on the energy sector of different limits of sustainable biomass and carbon budget scenarios. The risk associated with exceeding the sequestration capacity of a given region is modeled via Chance Constraint. Results show that electrification is an appropriate long-term decarbonization strategy. It smoothes the effects of uncertainty in sequestration capacity and responds to end-user demands. For this case study, higher levels of electrification are obtained at likelihood levels >66% for end-use sectors.

54 ENVIRONMENTAL SCIENCES↗

Biomass carbon removal can help sustainable aviation fuels achieve on-time arrival

Biofuels, including sustainable aviation and marine fuels, and biomass carbon removal and storage (BiCRS) are often viewed as potentially competing pathways for advancing climate and energy goals. Their comparative economic, environmental, and temporal advantages remain debated. Rather than identifying a “best-use” for biomass, we show that the relative economic advantages of BiCRS versus biofuels exist along a continuum shaped by energy- and decarbonization-focused market conditions. These pathways need not be adversarial: BiCRS can enable, rather than displace, future biofuel deployment. While the lignocellulosic biofuel sector continues to face barriers associated with underdeveloped supply chains and technologies that have not yet been commercialized at scale, emerging BiCRS approaches are comparatively feedstock-flexible, rapidly deployable, and responsive to carbon removal markets. Early BiCRS deployment can help establish reliable biomass supply chains, reducing investment risk for future lignocellulosic biorefineries. By easing initial supply chain constraints, BiCRS can serve as a practical stepping stone toward meeting both near-term carbon removal needs and long-term sustainable fuel objectives under uncertain future market and policy conditions.

bioenvironmental engineering↗

A strategy for automated core design to increase economic viability and minimize fuel fragmentation, relocation, and dispersal susceptibility in high-burnup cores

The nuclear industry aims to increase the cycle length of pressurized water reactors from 18 to 24 months to increase power plant capacity factors and economic viability. These cycle length extensions will inherently require fuel rods to exceed the current peak rod average burnup limit of 62 GWd/MTU. A chief concern of operating beyond the current burnup limit is the fuel fragmentation, relocation, and dispersal (FFRD) phenomenon in which pulverized fuel fragments can axially relocate and escape through a burst in the cladding formed during a loss-of-coolant accident. In this work, we demonstrate an approach for automating core design employing an optimization tool based on a penalty-free, parallel simulated annealing algorithm to produce pressurized water reactor core designs with two different optimization objectives. The two objectives were to produce core designs with (1) mitigated FFRD susceptibility while achieving 24-month cycle lengths (2) maximum cycle length with no regard for the likelihood of FFRD. Batch size was considered in tandem with both cases to maximize economic viability. The PARCS nodal model was the primary reactor physics tool used in the optimizations and used nuclear cross sections calculated with 2D Polaris lattice physics models. Reactor performance and safety characteristics of the optimized cores were verified using high-fidelity Virtual Environment for Reactor Applications models. The core designs produced by the optimization tool are compared with each other and to a high-burnup core design produced and analyzed in previous works to highlight the fuel management strategies that may enhance high-burnup reactor safety and economic viability. The optimized cores satisfied their respective objective functions, producing a maximum cycle length of 720 effective full-power days in one core design and one that may reduce FFRD susceptibility by up to 50% based on the first-order approximation to FFRD risk formulated in this work. The optimized cores met most constraints but exceeded the hot channel factor limit, especially in FFRD cases where fresh fuel carried more power. Furthermore, this highlights the need for future lattice-level optimizations and broader assembly options.

Cycle length↗