Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling planning resources model based systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

27 records · Page 2

Quantitative Metrics for Grid Resilience Evaluation and Optimization

Power system resilience has become a critical topic in recent years because of the increasing trend of extreme events and the growing integration of intermittent renewable energy sources. To enhance grid resilience against high-impact, low-frequency events, two questions should be answered: how to quantify the resilience of a given grid and how to incorporate the quantification into power system planning, operation, and restoration. Here this paper develops a new set of quantitative metrics with clear physical interpretation to comprehensively evaluate power system resilience. Using microgrids as an example, an event-based corrective scheduling (ECS) model and an online model predictive control (OMPC) model are developed to integrate the proposed quantitative resilience metrics into power system optimization models for resilience enhancement. The ECS model employs extreme event data to investigate the optimal restoration solution and to help microgrid operators prepare to respond to similar events. The OMPC model provides online decision-making support for operators to handle ongoing outages in the most resilient fashion. The effectiveness and superiority of the proposed quantitative resilience metrics and the resilience enhancement models are demonstrated through simulations and comparative studies on an IEEE test feeder and a real distribution feeder in Southern California.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Design of Sustainable Ammonia-Based Food–Energy–Water Systems with Nitrogen Management

As the basis for virtually any form of nitrogen fertilizers, ammonia plays a vital role in agriculture; in addition, there has been an increased interest in its use as a carbon-free energy carrier. However, ammonia is also associated with two major environmental concerns: CO 2 emissions from the conventional production process and nitrogen pollution from the excessive use of ammonia-based fertilizers. To mitigate these environmental impacts, we develop an optimization framework for the design of a sustainable ammonia-based agricultural system that synergistically integrates the production of ammonia from renewable resources and effective measures for nitrogen management. The proposed model captures the effect of intermittency by incorporating both design and detailed operational decisions. Here, by applying a multiscale time representation that reduces the problem size and a tailored surrogate model that accurately approximates model nonlinearity, we are able to achieve optimal solutions within reasonable computation times. A computational case study is conducted using real-world data from a local farm in Morris, Minnesota, and the results indicate the trade-off between cost and nitrogen loss. Importantly, we show that practicing effective nitrogen management can significantly reduce the nitrogen loss with only a small increase in net present cost.

10 SYNTHETIC FUELS↗

Radiological Recovery Logistics Tool - 20161

Argonne is building and testing a tool, the Radiological Recovery Logistics Tool (RRLT), that can be used during the response and recovery from a radiological or nuclear incident to effectively allocate appropriate commercial and public works equipment to mitigate, remove, and contain radiological contamination. The requirements for this tool - as well as development of the resulting software - is overseen by a steering committee of stakeholders from DHS's National Urban Security Technology Laboratory (NUSTL), the Federal Emergency Management Agency (FEMA), and the Environmental Protection Agency (EPA). One essential requirement is for RRLT to support the efficient and appropriate allocation of resources for a radiological response. Subsequent discussions between ANL and stakeholders have solidified the nature of this support to include identification of the types of resources to be allocated. The study reported in this paper has both factored fundamental concepts and connections out of this identification process and created a Knowledge Base detailing support goals, response scenarios, and efficacy information on dozens of equipment types. In short, RRLT will dynamically apply these findings to situational conditions surrounding contamination incidents. RRLT's Domain, the model of elements, ideas and relationships with which the tool will work, draws concepts from technical reports and stakeholder vocabularies to connect response goals and scenarios to types of equipment that offer utility towards those goals in those scenarios. RRLT's Knowledge Base will contain details on dozens of equipment types and facilitate the operator's discovery and consumption of these details most pertinent to a dynamically selected subset of goals. The core of its Domain Model is based on a report authored by this team. This report [1] contains a comprehensive list of proposed equipment to accomplish various missions or scenarios that might arise after a large-scale radiological contamination incident in an urban environment or critical infrastructure. The report divides potential response and recovery efforts into five support goals: Survey and monitoring of the contaminated area; Mitigation of received dose to first responders: Decontamination (gross and final) of buildings, vehicles, roadways, parks, and other surfaces: Waste management of solid waste generated during recovery operations: and Containment of wastewater and other waste generated during the response and recovery phases. RRLT's development is driven by use cases. A use case is an intention with which a user approaches the software. Use cases are grouped into delivery increments to schedule development, testing, and presentation to stakeholders. This model partitions the system into seven increments: User Arrival and Authentication, Search and Navigation, Equipment Recommendation, Plan Management, Content Management, and Expanded Access. Once a user 15 authenticated, RRLT will present the user with a dashboard that allows them to explore or search RRLT's content. The dashboard will also include a 'Plan' panel for collecting decisions and relevant observations about an incident at hand to facilitate development of an equipment list. RRLT will offer three general modes of access to items in the knowledge base: - Keyword search for direct discovery of items, - Navigation along predetermined paths from recovery goal towards equipment types, and - Interactive guidance towards equipment types by an autonomous software agent: the Equipment Recommendation Wizard. This presentation will detail progress in the development of the RRLT and also discuss opportunities for those interested in providing feedback on its content and functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

The Transactive Energy Network Template Metamodel

While transactive energy, which is defined as an allocation of electricity based on dynamically discovered values or prices, has been extensively studied, its uptake and use has been slow. This report describes a tool, the transactive network template, which should hasten the creation and uptake of transactive energy networks. Some basic principles of transactive energy are familiar from existing wholesale electricity markets. Locational prices are calculated today for zones within bulk electric transmission systems. Locational prices differ while accounting for the locational costs of electricity generation and the losses and constraints incurred when electricity is transmitted from generators and distributed to consumers. A transactive energy network might include these transmission zones. However, current research strives to apply transactive energy also in electricity distribution circuits, buildings, and even for individual generating and consuming devices. At the same time, researchers explore how to apply transactive energy in real time during increasingly shorter time intervals. Automated computational agents become necessary as transactive energy becomes applied to smaller circuit zones and at faster dynamic timescales. A transactive energy network is an example of a multi-agent system. Each zone in the network is represented by its transactive agent, which makes decisions for and acts on behalf of a business entity that is responsible for and manages one of the circuit regions. A transactive energy network is also an example of a decentralized, distributed control system. Control decisions and responsibilities are distributed among the network’s transactive agents. The transactive agents are independent; that is, there typically is no centralized authority or oversight function. Instead, transactive agents exchange transactive signals and thereby negotiate the prices and quantities of electricity that they will exchange. Initially, the circuit regions and responsibilities of transactive agents appear to be very dissimilar. Each circuit region may comprise transmission, distribution, or building-level circuits. Each has a unique position and electrical connectivity within the transactive energy network. Each possesses unique assets that either generate or consume electricity, and these (e.g., renewable energy generator, diesel generator, aggregate utility load, building load, space conditioning, refrigerator, etc.) may further differ in their price flexibility and in their strategies for responding to dynamic electricity prices. Given such diversity, an implementer’s first inclination might be to start from scratch to define all these devices and to engineer their seemingly unique interactions. Given that each implementer’s perspective may be narrow within a transactive energy network, it is unlikely that uniquely engineered systems would interact well. This is where the transactive network template is applicable. The transactive network template is a metamodel that has been developed to guide implementers as they configure their own transactive agent within a network of such agents. The object-oriented design of the transactive network template provides basic code object types that may be used and extended by implementers to represent each of the assets in their circuit region. These objects further facilitate the transactive agent’s necessary computations, which are divided among responsibilities to schedule power usage, balance electric supply and demand, and coordinate the exchange of electricity with the other transactive agents. This report addresses the conceptual transactive network template design. Implementers are directed to more formal design documents and reference implementations. A Python™-based1 reference implementation of the transactive network template has been coded, and three implementations have been configured to represent a national laboratory and two university campuses. Version 2 of the transactive node template generalizes the market class and its methods to facilitate multiple, and more diverse market coordination mechanisms than were facilitated by and demonstrated using Version 1. Version 3 includes new Appendix B, which addresses the designs of methods that would make dynamic prices track approved electricity rates. In the future, the author wishes to make the transactive network template more generally applicable to networks that require more accurate power flow. Development of the transactive network template is jointly funded by the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy and the DOE Office of Electricity. In late 2015, one of the first projects to be funded by the DOE Grid Laboratory Modernization Laboratory Consortium was the Clean Energy and Transactive Campus project, led by Pacific Northwest National Laboratory. DOE funds were matched by an investment by the Washington Department of Commerce through its Clean Energy Fund. The transactive network template was developed to guide the implementation of transactive energy networks within this project’s scope.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗