Track/train dynamics test report transfer function test. Volume 1: Test

A description is presented of the transfer function test performed on an open hopper freight car loaded with 80 tons of coal. Test data and a post-test update of the requirements document and test procedure are presented. Included are a statement of the test objective, a description of the test configurations, test facilities, test methods, data acquisition/reduction operations, and a chronological test summary. An index to the data for the three test configurations (X, Y, and Z-axis tests) is presented along with test sequence, run number, test reference, and input parameters.

Vigil, R. A.↗

Design, processing, and testing of LSI arrays for space station

The work on the Process Analysis Structure was continued with the layout being completed, the 100X and 10X artwork being finalized, and the process and test sequences being prepared. Test programs were written for computer-controlled integrated-circuit testing and data reduction.

Ipri, A. C.↗

Thermal performance testing of the Explorer Platform

The Explorer Platform (EP) has been designed to accommodate on-orbit payload and bus module changeout via Space Transportation System (STS) servicing. Such a versatile spacecraft platform designed to experience widely different environmental exposures and operational conditions, coupled with program constraints on schedule and budget, presented a challenge to implementing a technically sound thermal vacuum/thermal balance test program. This paper discusses thermal performance tests implemented at the subsystem and system levels, and the risks accepted resulting from test sequence, configuration. and tests omitted from the program. No thermal cycling or thermal balance tests were performed on the integrated spacecraft level, although both the Payload (EUVE) and Platform (EP) received independent testing. The decision to take this approach is discussed with respect to the thermal design and the associated risks taken to maintain budget and schedule.

Wasson, David↗

Qualification tests and electrical measurements: Practice and problems

As part of the Flat-Plate Solar Array Project, 138 different module designs were subjected to qualification tests. Electrical measurements were subjected on well over a thousand modules representing more than 150 designs. From this experience, conclusions are drawn regarding results and problems, with discussion of the need for change or improvement. The qualification test sequence incuded application of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitation of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitating module design or process changes. However, the continued need for these tests may be questioned on the basis of technical and logistical factors. Technically, the current test sequence does not cover all design characteristics, does not include all field conditions and is not known to represent the desired 30-year module life. Logistically, the tests are time-consuming and costly, and there is a lack of, fully qualified independent test organizations. Alternatives to the current test program include simplification based on design specification and site environment, and/or the use of warranties or other commercial practices.

Smokler, M. I.↗

Solid rocket booster thrust vector control V-2 off-nominal testing

The results of the V-2 off nominal test sequence performed on the space shuttle solid rocket booster thrust vector control (SRB TVC) system are reported. The TVC subsystem was subjected to 19 off nominal test conditions. The test sequence consisted of: 8 burp starts, 30 hot firings, 14 GN2 spin tests, and 3 servicing passive system tests. It is concluded that the TVC subsystem operated nominally in response to the given commands and test conditions. Test objectives, detail results, and data are included.

Pagan, B.↗

RSRM top hat cover simulator lightning test, volume 1

The test sequence was to measure electric and magnetic fields induced inside a redesigned solid rocket motor case when a simulated lightning discharge strikes an exposed top hat cover simulator. The test sequence was conducted between 21 June and 17 July 1990. Thirty-six high rate-of-rise Marx generator discharges and eight high current bank discharges were injected onto three different test article configurations. Attach points included three locations on the top hat cover simulator and two locations on the mounting bolts. Top hat cover simulator and mounting bolt damage and grain cover damage was observed. Overall electric field levels were well below 30 kilowatts/meter. Electric field levels ranged from 184.7 to 345.9 volts/meter and magnetic field levels were calculated from 6.921 to 39.73 amperes/meter. It is recommended that the redesigned solid rocket motor top hat cover be used in Configuration 1 or Configuration 2 as an interim lightning protection device until a lightweight cover can be designed.

Source record↗

Rheoencephalographic and electroencephalographic measures of cognitive workload: analytical procedures

This investigation demonstrates the feasibility of mental workload assessment by rheoencephalographic (REG) and multichannel electroencephalographic (EEG) monitoring. During the performance of this research, unique testing, analytical and display procedures were developed for REG and EEG monitoring that extend the current state of the art and provide valuable tools for the study of cerebral circulatory and neural activity during cognition. REG records are analyzed to provide indices of the right and left hemisphere hemodynamic changes that take place during each test sequence. The EEG data are modeled using regression techniques and mathematically transformed to provide energy-density distributions of the scalp electrostatic field. These procedures permit concurrent REG/EEG cognitive testing not possible with current techniques. The introduction of a system for recording and analysis of cognitive REG/EEG test sequences facilitates the study of learning and memory disorders, dementia and other encephalopathies.

Arousal/physiology↗

A simulation-based fault injection experiment to evaluate self-test diagnostics for a fault-tolerant computer

The design and results of a fault injection experiment conducted in the Airlab facility at NASA-Langley using a logic network simulator are described. An attempt was made to determine the effectiveness of the diagnostic self-test sequences used to detect failures in the communicator/interstage (C/I) of a fault-tolerant processor (FTP). Identification of the undetected faults in the C/I Status Register logic resulted in changes in the diagnostic test sequences implemented for the FTP.

Baker, Robert L.↗

Sequential Testing Algorithms for Multiple Fault Diagnosis

In this paper, we consider the problem of constructing optimal and near-optimal test sequencing algorithms for multiple fault diagnosis. The computational complexity of solving the optimal multiple-fault isolation problem is super-exponential, that is, it is much more difficult than the single-fault isolation problem, which, by itself, is NP-hard. By employing concepts from information theory and AND/OR graph search, we present several test sequencing algorithms for the multiple fault isolation problem. These algorithms provide a trade-off between the degree of suboptimality and computational complexity. Furthermore, we present novel diagnostic strategies that generate a diagnostic directed graph (digraph), instead of a diagnostic tree, for multiple fault diagnosis. Using this approach, the storage complexity of the overall diagnostic strategy reduces substantially. The algorithms developed herein have been successfully applied to several real-world systems. Computational results indicate that the size of a multiple fault strategy is strictly related to the structure of the system.

Shakeri, Mojdeh↗

Sequential Test Strategies for Multiple Fault Isolation

In this paper, we consider the problem of constructing near optimal test sequencing algorithms for diagnosing multiple faults in redundant (fault-tolerant) systems. The computational complexity of solving the optimal multiple-fault isolation problem is super-exponential, that is, it is much more difficult than the single-fault isolation problem, which, by itself, is NP-hard. By employing concepts from information theory and Lagrangian relaxation, we present several static and dynamic (on-line or interactive) test sequencing algorithms for the multiple fault isolation problem that provide a trade-off between the degree of suboptimality and computational complexity. Furthermore, we present novel diagnostic strategies that generate a static diagnostic directed graph (digraph), instead of a static diagnostic tree, for multiple fault diagnosis. Using this approach, the storage complexity of the overall diagnostic strategy reduces substantially. Computational results based on real-world systems indicate that the size of a static multiple fault strategy is strictly related to the structure of the system, and that the use of an on-line multiple fault strategy can diagnose faults in systems with as many as 10,000 failure sources.

Shakeri, M.↗

X-ray Emission from Pre-Main-Sequence Stars - Testing the Solar Analogy

This LTSA award funded my research on the origin of stellar X-ray emission and the validity of the solar-stellar analogy. This research broadly addresses the relevance of our current understanding of solar X-ray physics to the interpretation of X-ray emission from stars in general. During the past five years the emphasis has been on space-based X-ray observations of very young stars in star-forming regions (T Tauri stars and protostars), cool solar-like G stars, and evolved high-mass Wolf-Rayet (WR) stars. These observations were carried out primarily with the ASCA and ROSAT space-based observatories (and most recently with Chandra), supplemented by ground-based observations. This research has focused on the identification of physical processes that are responsible for the high levels of X-ray emission seen in pre-main-sequence (PMS) stars, active cool stars, and WR stars. A related issue is how the X-ray emission of such stars changes over time, both on short timescales of days to years and on evolutionary timescales of millions of years. In the case of the Sun it is known that magnetic fields play a key role in the production of X-rays by confining the coronal plasma in loop-like structures where it is heated to temperatures of several million K. The extent to which the magnetically-confined corona interpretation can be applied to other X-ray emitting stars is the key issue that drives the research summarized here.

Skinner, Stephen L.↗

Experimental Investigation of the Effect of Gravity on Heat Pipe Startup

This paper describes an experimental investigation of the effect of the gravity pressure head on the startup of a heat pipe under the reflux mode. In this study, a heat pipe with internal axial grooves was placed in an upright position with two different tilt angles relative to the horizontal plane. Heat was applied to the evaporator at the bottom and cooling was provided to the condenser at the top. The liquid-flooded evaporator was divided into seven segments along the axial direction, and electrical heaters were attached to each segment. Heat was applied to individual heaters in various combinations and sequences. Test results show that as long as an individual evaporator segment was flooded with liquid initially, a superheat was required to vaporize the liquid in that segment. The amount of superheat required for liquid vaporization was a function of gravity pressure head imposed on that evaporator segment. The most effective way to start the heat pipe was to apply a heat load with a high heat flux to the lowest segment of the evaporator. This paper describes an experimental investigation of the effect of the gravity pressure head on the startup of a heat pipe under the reflux mode. In this study, a heat pipe with internal axial grooves was placed in an upright position with two different tilt angles relative to the horizontal plane. Heat was applied to the evaporator at the bottom and cooling was provided to the condenser at the top. The liquid-flooded evaporator was divided into seven segments along the axial direction, and electrical heaters were attached to each segment. Heat was applied to individual heaters in various combinations and sequences. Test results show that as long as an individual evaporator segment was flooded with liquid initially, a superheat was required to vaporize the liquid in that segment. The amount of superheat required for liquid vaporization was a function of gravity pressure head imposed on that evaporator segment. The most effective way to start the heat pipe was to apply a heat load with a high heat flux to the lowest segment of the evaporator.

Heat Pipes↗

Experimental, Computational, Theoretical and Analytical Investigation of Flow Boiling in Reduced Gravity

Two-phase thermal management systems are far superior to their single-phase counterparts because of their ability to capitalize on the coolant’s both sensible and latent heats, thereby yielding orders of magnitude higher heat transfer coefficients and smaller system footprints. A vital knowledge necessary for their implementation in future space systems is performance in microgravity. Long-duration microgravity experiments are necessary to obtain reliable databases, which would then be used to build reliable predictive tools. To achieve this goal, investigators at the Purdue University Boiling and Two-Phase Flow Laboratory (PU-BTPFL) and the NASA Glenn Research Center (NASA-GRC) have been collaborating towards the development of the Flow Boiling and Condensation Experiment (FBCE) and eventual execution onboard the International Space Station (ISS). FBCE has now matured to a point where it is ready for transport to the ISS, where first tests will be conducted using the Flow Boiling Module (FBM). In preparation for the ISS tests, a series of pre-launch Mission Sequence Tests (MSTs) was performed at GRC in Earth gravity with FBM mounted in a vertical upflow orientation using n-perfluorohexane as working fluid. The pre-launch tests included variations of flow rate, surface heat flux, inlet conditions, and both single-sided and double-sided wall heating. This presentation will summarize experimental results from these tests as well as both analytic and theoretical tools for prediction of two-phase heat transfer coefficient and critical heat flux (CHF). Also discussed will be an assessment of predictive accuracy of these tools against the experimental data.

Mission Sequence tests↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.

Foster, William M., II↗

Capacitor-Test System

Polycarbonate film capacitors tested for leakage paths with microprocessor controlled multiplexer test sequence. Microprocessor based capacitor test system simultaneously monitors 80 capacitors.

Ott, F. M.↗

X-Ray Emission from Pre-Main-Sequence Stars - Testing the Solar Analogy

This LTSA award funds my research on the origin of stellar X-ray emission and the solar-stellar analogy. The focus during most of this reporting period continued to be on the reduction and analysis of data acquired with the ASCA observatory (Advanced Satellite for Cosmology and Astrophysics). During the last few months of this reporting period, considerable time and effort was also devoted to the submission of AXAF observing proposals in preparation for the upcoming AXAF launch. During this reporting period, five papers appeared in refereed journals for which I was either author or co-author, and two additional papers have recently been submitted to ApJ. Also, three conference proceedings papers were submitted. These publications are listed in the attached bibliography.

Skinner, Stephen L.↗

A Simulation Based Investigation of High Latency Space Systems Operations

This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control systems, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions and assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

Li, Zu Qun↗