Search NASA⌕ Search

SEARCH · Search NASA

Results for “service systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Satellite services system analysis study. Volume 2, part 2: Study results

The development of an effective satellite services system was investigated. Satek Satellite user market, design reference missions, satellite service functions, service equipment, and cost estimates are discussed. Extensive program plans for a satellite service system implementation are included.

Source record↗

International GPS (Global Positioning System) Service for Geodynamics

The International GPS (Global Positioning System) Service for Geodynamics (IGS) began formal operation on January 1, 1994. This first annual report is divided into sections, which mirror different aspects of the service. Section (1) contains general information, including the history of the IGS, its organization, and the global network of GPS tracking sites; (2) contains information on the Central Bureau Information System; (3) describes the International Earth Rotation Service (IERS); (4) details collecting and distributing IGS data in Data Center reports; (6) describes how the IGS Analysis Centers generate their products; (7) contains miscellaneous contributions from other organizations that share common interests with the IGS.

Zumberge, J. F.↗

Space Station user Servicing System architecture and operational aspects

The structure of the Space Station Servicing System architecture, operational aspects of the system, and the potential evolution of the servicing capabilities to accomodate a variety of missions are disscussed. Services to be performed include replacement or repair of failed modules, subsystems or parts, replacement or upgrading of spacecraft or instrument subsystems, replacement of limited lifetime subsystems or components, replenishment of consumables, and assembly of attached payloads and instruments. Elements of the system discussed include intravehicular servicing, the flight telerobotic servicer, and the mobile servicing center. Ground, preservicing, extravehicular and intravehicular servicing, and postservicing operations are examined. Also, a typical mission scenario for mature servicing operations is given.

Cline, Helmut P.↗

The development of the Canadian Mobile Servicing System Kinematic Simulation Facility

Canada will develop a Mobile Servicing System (MSS) as its contribution to the U.S./International Space Station Freedom. Components of the MSS will include a remote manipulator (SSRMS), a Special Purpose Dexterous Manipulator (SPDM), and a mobile base (MRS). In order to support requirements analysis and the evaluation of operational concepts related to the use of the MSS, a graphics based kinematic simulation/human-computer interface facility has been created. The facility consists of the following elements: (1) A two-dimensional graphics editor allowing the rapid development of virtual control stations; (2) Kinematic simulations of the space station remote manipulators (SSRMS and SPDM), and mobile base; and (3) A three-dimensional graphics model of the space station, MSS, orbiter, and payloads. These software elements combined with state of the art computer graphics hardware provide the capability to prototype MSS workstations, evaluate MSS operational capabilities, and investigate the human-computer interface in an interactive simulation environment. The graphics technology involved in the development and use of this facility is described.

Beyer, G.↗

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water↗

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water↗

Global services systems - Space communication

The requirements projected to the year 2000 for space-based global service systems, including both personal communications and innovative services, are developed based on historic trends and anticipated worldwide demographic and economic growth patterns. The growing demands appear to be best satisfied by developing larger, more sophisticated space systems in order to reduce the size, complexity, and expense of ground terminals. The availability of low-cost ground terminals will, in turn, further stimulate the generation of new services and new customers.

Shepphird, F. H.↗

Robotic servicing system for space material experiment

A containerless image furnace with an electrostatic positioning device has been developed as one of the material experiment facilities on the Japanese experimental module (JEM). It is characterized by heating/melting/cooling the sample whose position is kept without any contacts by actively controlled electrostatic force exerted between the sample and a set of electrodes. The experiment using the image furnace requires various servicing operations. We have been developing a robotic servicing system with an internal robot accommodated in the rack as an alternative to the crew. It aims to reduce the load on the crew by automating regular tasks and to increase the flexibility applicable to simple irregular tasks by introducing a remote teleoperation scheme. The present robot has poor capability to replace the crew. In order to compensate it, introducing of the concept of the robot friendliness and improving the controllability of the teleoperation by the ground operator aids are essential. In this paper, we identify the tasks to be performed by the robotic servicing system and discuss the way to compensate the capability of the robot. In addition we describe the evaluation tests using an experimental model.

Yamawaki, Toshihiko↗

Satellite servicer system flight demonstration program

A program to develop the capability of servicing satellites in remote locations, where a series of flight that will demonstrate autonomous rendezvous and docking, supervised autonomous Orbital Replacement Unit (ORU) exchange, supervised autonomous fluid transfer and, proximity operations for Space Station Freedom were planned, is described. The flight demonstrations are the results of several mission scenarios with complex technical objectives. Three Shuttle flights are planned to complete the multi-objective program. The major hardware elements of the program are described and discussed. Demonstration objectives and technical approaches to the flight demonstrations are discussed. Existing and developing technologies are assessed for applicability to the Satellite Servicer System (SSSFD) program.

James S. Moore↗

Satellite services system analysis study. Volume 2: Satellite and services user model

Satellite services needs are analyzed. Topics include methodology: a satellite user model; representative servicing scenarios; potential service needs; manned, remote, and automated involvement; and inactive satellites/debris. Satellite and services user model development is considered. Groundrules and assumptions, servicing, events, and sensitivity analysis are included. Selection of references satellites is also discussed.

Source record↗

Satellite services system analysis study. Volume 5: Programmatics

The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.

Source record↗

User assembly and servicing system for Space Station, an evolving architecture approach

On-orbit assembly and servicing of a variety of scientific and applications hardware systems is expected to be one of the Space Station's primary functions. The hardware to be serviced will include the attached payloads resident on the Space Station, the free-flying satellites and co-orbiting platforms brought to the Space Station, and the polar orbiting platforms. The requirements for assembly and servicing such a broad spectrum of missions have led to the development of an Assembly and Servicing System Architecture that is composed of a complex array of support elements. This array is comprised of US elements, both Space Station and non-Space Station, and elements provided by Canada to the Space Station Program. For any given servicing or assembly mission, the necessary support elements will be employed in an integrated manner to satisfy the mission-specific needs. The structure of the User Assembly and Servicing System Architecture and the manner in which it will evolved throughout the duration of the phased Space Station Program are discussed. Particular emphasis will be placed upon the requirements to be accommodated in each phase, and the development of a logical progression of capabilities to meet these requirements.

Lavigna, Thomas A.↗

Satellite Servicer System flight demonstration program

The major hardware elements, demonstration objectives, and technical approaches, as well as existing and developing technologies for applicability to the Satellite Servicer System (SSSFD) program are presented. In a project to develop the capability of servicing satellites in remote locations, NASA and SDI have planned a series of flights to demonstrate autonomous rendezvous and docking, supervised autonomous fluid transfer, and supervised autonomous orbital replacement unit exchange. Program objectives, design reference mission, and flight demonstrations are described. The expanded capability demonstrated by the SSSFD program will provide alternatives to excessive dependence on ground operations personnel and training, increase the reach into unique space environments, and decrease the costs of managing and operating space assets.

Moore, James S.↗

Satellite services system analysis study. Volume 1, part 2: Executive summary

The early mission model was developed through a survey of the potential user market. Service functions were defined and a group of design reference missions were selected which represented needs for each of the service functions. Servicing concepts were developed through mission analysis and STS timeline constraint analysis. The hardware needs for accomplishing the service functions were identified with emphasis being placed on applying equipment in the current NASA inventory and that in advanced stages of planning. A more comprehensive service model was developed based on the NASA and DoD mission models segregated by mission class. The number of service events of each class were estimated based on average revisit and service assumptions. Service Kits were defined as collections of equipment applicable to performing one or more service functions. Preliminary design was carrid out on a selected set of hardware needed for early service missions. The organization and costing of the satellie service systems were addressed.

Source record↗

Remote orbital servicing system concept

Increased applications of automation technology identified as necessary for NASA to carry out its missions within the constraints of future funding and available physical resources are described. A concept for a Remote Orbital Servicing System (ROSS) based on present teleoperator and robotics technology is presented. A single servicer design compatible with three specified spacecraft, capable of performing service to the same extent as manned extravehicular activity, controlled from a ground control station, and using currently available technology is conceptualized.

Meintel, A. J.↗