Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

Preliminary Radioisotope Screening for Off-site Consequence Assessment of Advanced Non-LWR Systems

Currently a set of 71 radionuclides are accounted for in off-site consequence analysis for LWRs. Radionuclides of dose consequence are expected to change for non-LWRs, with radionuclides of interest being type-specific. This document identifies an expanded set of radionuclides that may need to be accounted for in multiple non-LWR systems: high temperature gas reactors (HTGRs); fluoride-salt-cooled high-temperature reactors (FHRs); thermal-spectrum fluoride-based molten salt reactors (MSRs); fast-spectrum chloride-based MSRs; and, liquid metal fast reactors with metallic fuel (LMRs) Specific considerations are provided for each reactor type in Chapter 2 through Chapter 5, and a summary of all recommendations is provided in Chapter 6. All identified radionuclides are already incorporated within the MACCS software, yet the development of tritium-specific and carbon-specific chemistry models are recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE↗

Combining artificial intelligence and physics-based modeling to directly assess atomic site stabilities: from sub-nanometer clusters to extended surfaces

The performance of functional materials is dictated by chemical and structural properties of individual atomic sites. In catalysts, for instance, the thermodynamic stability of constituting atomic sites is a key descriptor from which more complex properties, such as molecular adsorption energies and reaction rates, can be derived. In this study, we present a widely applicable machine learning (ML) approach to instantaneously compute the stability of individual atomic sites in structurally and electronically complex nano-materials. Conventionally, we determine such site stabilities using computationally intensive first-principles calculations. With our approach, we predict the stability of atomic sites in sub-nanometer metal clusters of 3–55 atoms with mean absolute errors in the range of 0.11–0.14 eV. To extract physical insights from the ML model, we introduce a genetic algorithm (GA) for feature selection. This algorithm distills the key structural and chemical properties governing the stability of atomic sites in size-selected nanoparticles, allowing for physical interpretability of the models and revealing structure–property relationships. The results of the GA are generally model and materials specific. In the limit of large nanoparticles, the GA identifies features consistent with physics-based models for metal–metal interactions. By combining the ML model with the physics-based model, we predict atomic site stabilities in real time for structures ranging from sub-nanometer metal clusters (3–55 atom) to larger nanoparticles (147 to 309 atoms) to extended surfaces using a physically interpretable framework. Finally, we present a proof of principle showcasing how our approach can determine stable and active nanocatalysts across a generic materials space of structure and composition.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗

MRCI Task 3: Facilitating Data Collection, Sharing, and Analysis Final Technical Summary Report

The Midwest Regional Carbon Initiative (MRCI) Task 3.0 was defined to facilitate development of carbon capture, utilization, and storage (CCUS) in the region by collection and sharing of existing and new technical data from CCUS projects and research. The task also included support for further analysis and assessment of tools by the project team and by researchers working on programs such as National Risk Assessment Partnership (NRAP), machine learning (ML) techniques, and assessment and improvement of CCUS site assessment, operations, and monitoring aspects. Work under Task 3.0 addressed key issues related to CCUS deployment and provided foundational research and datasets to help establish CCUS projects in the MRCI. Report Authors and Principal Technical Contributors: Joel Sminchak, Laura Keister, Mackenzie Scharenberg, Priya Ravi-Ganesh, Autumn Haagsma, Srikanta Mishra, Jared Hawkins, Jared Schuetter, Amy Lang, Jaelen Lewis, Derrick James, Jorge Barrios, Stuart Skopec, and Sanjay Mawalkar (Battelle). Chris Korose, Carl Carmen, Nate Grigsby, Nathan Webb (Illinois State Geological Survey). Principal Investigators: Dr Neeraj Gupta, Dr. Chris Korose.

MRCI,NRAP,data collection,data compilation,legacy ↗

EVI-LOCATE: One Stop Solution for Estimating Cost of Installing EV Charging Stations

EVI-LOCATE (Electric Vehicle Infrastructure-Locally Optimized Cost Assessment Tool and Estimator) is a site assessment tool to estimate costs to install EV charging stations. EVI-LOCATE enables users to generate site-specific, user-specific, and location-specific EV charging station installation designs and cost estimates. The tool integrates National Electrical Code, deep-learning pixel classification algorithm, and component-level costs to estimate the costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Geologic Risk Assessment Activities at SECARB Cranfield, MS Site

Risk Assessment (RA) of RCSP Phase 3 sites is a DOE requirement and valuable to DOE’s program because this process encourage careful consideration of elements that could damage an individual project, or if severe ,damage credibility and public commercial acceptance of the sequestration process. Poor outcomes even from small projects can have negative consequences larger than the cost to the individual project. In addition, practice in risk assessment compared to project evolution is needed as part of the confidence-building toward future large scale, long term industrial activities.

01 COAL, LIGNITE, AND PEAT↗

National Demonstration Reactor Siting Study—Phase I (Revision 1)

In 2020, the Department of Energy Office of Nuclear Energy (DOE-NE) initiated the Advanced Reactor Demonstration Program (ARDP), with the goal of demonstrating two advanced reactor designs within the next five to seven years. When evaluating challenges in meeting this deadline, the newly established National Reactor Innovation Center (NRIC) determined that there was a limited number of well-characterized sites that could support this time-sensitive demonstration requirement. To close this gap, NRIC initiated a two-phase joint analytic effort including DOE, National Laboratory, and academic partners to examine demonstration reactor siting alternatives. The first phase of the study, which is documented in this report, describes the development of a methodology for site assessment and a preliminary assessment of a limited number of known siting alternatives. Revision 1 of this report includes 3 additional (13 total) siting alternatives and 2 additional (4 total) example scenarios.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Emission Inventories from Natural Gas Storage Facilities using Regional Frequency Comb Laser Monitoring and Aircraft Flyovers. Final Report

The project centers around a ground-based regional methane sensor developed by the CU/NIST team members under the DOE ARPA-E MONITOR program, and sophisticated aircraft measurement techniques developed by the UCD/Scientific Aviation team (responsible for a recent Science publication quantifying the Aliso Canyon storage field release). The dual frequency-comb spectrometer is an invisible, eye-safe laser capable of measuring atmospheric methane concentrations along beam paths 1+ miles in length with high precision and stability (<1 ppb methane over 1 mile). The CU/NIST team has developed a unique approach to using a single, central spectrometer to locate and size methane emissions as small as 6 scfh from specific gas field structures within the 1+ mile range of the laser. Deployment involves the stationing of small cubic mirrors at strategic locations across the gas storage site. The mirrors direct light from the spectrometer back to a detector, where methane concentrations are recorded based on light absorption at specific wavelengths. The measurements are coupled with high resolution gas transport models based on meteorological measurements (wind, etc.) to determine the precise location and emission rate of methane sources. The calibration-free and continuous nature of dual frequency-comb spectrometer measurements means that a large area can be monitored continuously for temporal variability of emissions over long periods of time. The aircraft measurements involve spiral flights around storage facilities with a sensitive ethane/methane measurement package. Upwind/downwind concentration comparisons and wind data provide total facility emissions data. During this project, a new micrometeorological package was integrated onto the Scientific Aviation aircraft to provide even greater emissions quantification capability. In this project, the ground-based measurement system was deployed for 11 months (to capture seasonal variability) at a West Coast storage facility, together with a campaign of twice monthly aircraft total facility emissions flights. The data from these two modalities was combined to quantify the methane emissions from the facility with first-of-its-kind temporal and spatial detail. Concurrent with this deployment, the aircraft team performed flights to quantify emissions at a wider array of previously un-surveyed storage sites. The ground-based measurement system was then moved to an additional site of differing total storage and delivery capacity. Aircraft mass balance flights continued, repeatedly surveying (twice monthly) this site, as well as surveying a large number of previously un-assessed sites spanning a variety of size, reservoir type and age. Assessment of ground-based, temporally and spatially detailed methane emissions information alongside aircraft-derived methane total facility emissions information led to an improved understanding of emissions, relevant for inventories of the natural gas storage sector. In particular, this work provided temporal detail (seasonal of emissions and frequency of leaks) to stakeholders and personnel responsible for updates to the EPA’s GHGI. The impact of the proposed work has been a dramatic improvement in the temporal, spatial, and site- and type- specific detail and quantification of emissions inventories for the natural gas storage sector. This work directly benefits the EPA’s GHGI, directly ameliorates the environmental impacts and public health and safety of the natural gas storage sector, and aids policymakers and industry to make sound choices with respect to management and regulation.

03 NATURAL GAS↗

Smart Planning for Radioactive Source Transport Advanced Tools for Increased Safety and Efficiency

End-of-life (EOL) management of high-activity radioactive sources is made uniquely challenging by the inherent risks associated with storage and transportation of these sources, the complex logistics involved, and the strict requirements for regulatory compliance. Traditional methods lack comprehensive tools for accurate site assessments and precision planning for the transportation of radioactive sources. They also frequently fail to provide the adaptability required to consider diverse operational environments, resulting in inefficiencies and potential safety concerns. This paper introduces a novel software solution developed to address these issues by integrating advanced technologies such as light detection and ranging (LiDAR)-based 3D environment modeling, smart dynamic route planning, and customizable measurement functionalities. This software enables detailed terrain visualizations, facilitating thorough environmental assessments and enabling users to virtually navigate, analyze, and plan site-specific operations. Among the key features are a user-centric interface for virtual navigation, precise site measurement tools for site evaluations, interactive visualizations that highlight potential operational hazards, dynamic route planning capabilities, and real-time collision detection to promote safe workflows. By demonstrating the effectiveness of this tool through real-world application, the present work underscores the tool’s potential to revolutionize radioactive source EOL management by improving operational efficiencies, minimizing risk, and advancing the state of practice to achieve suitable and secure radioactive material handling.

99 - GENERAL AND MISCELLANEOUS↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Depolymerization in Mesopores Using Dynamic Properties of Polymeric Melt Accessed via Dielectric Spectroscopy

Traditional design principles for heterogeneous catalysis guide the use of catalytic particles with mesosized (∼2–50 nm) pores to increase the number of surface-active sites by way of an increased surface area. However, the entry of long-chain polymers into such pores may be significantly limited by the size and entanglement of polymers in the melt state, thereby decreasing the number of accessible sites. Assessment of catalyst performance from traditional reactor-based studies averages over intrapore reaction events as well as reactions on the surface of a particle, resulting in an inability to distinguish between differences in site accessibility and activity. Techniques that assess the intrapore performance can inform the design of future heterogeneous catalysts for polymer upcycling. In this work, we demonstrate the use of broadband dielectric spectroscopy to monitor depolymerization of a polymer melt within mesopores via changes in the segmental relaxation time scale of amorphous polymer chains. In particular, we highlight the use of an anodic aluminum oxide (AAO) membrane as a readily available model for catalyst pores with a well-characterized pore morphology. The decrease in the segmental relaxation (α-relaxation) time of the melt with increasing chain scission emerges as a measure of the extent of polymer deconstruction inside mesopores. To demonstrate the utility of this technique, we demonstrate the decomposition of two commercial poly(propylene carbonate) polymers with different decomposition rates within mesopores. As the polymers depolymerize, their segmental relaxation time decreases as the molecular weight decreases (as predicted by the Fox–Flory equation). The BDS-measured change in segmental relaxation time mirrors the expected trend based on change in molecular weight measured by size exclusion chromatography.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗