April 2024 Public Town Hall [Slides]
Regional development plan: To be successful on-site, we also need support from the surrounding area. Ongoing construction between White Rock and Los Alamos in key areas on LANL property.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Regional development plan: To be successful on-site, we also need support from the surrounding area. Ongoing construction between White Rock and Los Alamos in key areas on LANL property.
The instrumentation development roadmap provides a guide on which measurements, and instruments, are important for future field campaigns to meet both the science objects and validation plans for their successful execution. The roadmap ensures the measurements are of sufficient type and resolution to meet science objectives and validation needs essential to the campaigns. The roadmap includes measurement categories ranging from instruments that need to be created to existing instruments essential to the field campaigns. The creation of the instrumentation development roadmap builds upon the previous Atmospheric to Electrons (A2e) validation work and formation of the American WAKE experimeNt (AWAKEN) science objectives.
This panel was deferred until 2021. The session was designed to highlight and celebrate the accomplishment of Vision 2020 at US DoE's East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Vision 2020 is the overarching strategy and guidance that have formed the foundation of success in closing one of the largest cleanup site in the DOE Complex. The session was supposed to feature representatives from the DOE Oak Ridge Office of Environmental Management (OREM) and its contractor, UCOR, in exploring the partnerships and performance excellence that have made the difference in achieving success. OREM's Vision 2020 is a collaboration with entities that have made a difference in its success: economic developers, workforce developers, the University of Tennessee, and community partners. The vigorous Oak Ridge small business contracting community has also been instrumental in helping achieve success. This session plans to celebrate the entire process, its numerous players, and the spirit of accomplishment as the Oak Ridge community comes to realize the promise of 30 years of continuous cleanup excellence. This session integrated with panel sessions 97B, 97C and 97D. Panelists with presentations: Beyond Cleanup: Achieving Risk Reduction through Partnerships and Performance Excellence (Kenneth Rueter); Strategic Approach to Achieve End States at the East Tennessee Technology Park (Jay Mullis)
To de-inventory plutonium Certified Reference Materials standards (CRMs) from the New Brunswick National Laboratory (NBL), the Argonne National Laboratory (ANL) and Savannah River National Laboratory (SRNL) formed a unique team. This teaming arrangement leveraged the different capabilities and expertise of both laboratories, helping to ensure the effort would be performed both safely and cost-effectively. With the NBL then physically housed on the ANL site, ANL served as the host-site, providing the necessary facilities and support services (e.g., supplying everything from hoods, loading equipment, and scales to Health Physics supports). From a packaging perspective, ANL's responsibilities focused mainly on characterizing and preparing the contents for shipment, followed by performing the Shipper of Record activities. With SRNL being the Package Design Authority of the 9978, the Type B packaging used for this effort, SRNL's scope included developing a Safety Analysis Report in Packaging (SARP) Letter Amendment to add the CRMs as authorized contents to the 9978. Recognizing competency, ANL prodigiously tasked SRNL to perform the actual loading of the CRMs into the 9978s, while physically on the ANL site. This paper details five different aspects of this effort. They are: 1. Characterization/validation of the CRM contents. 2. Development of the 9978 SARP Letter Amendment for the content change. 3. Development of the nitrogen inerting method to address SARP identified potential flammability concerns. 4. Renewal of the SRNL 9978 loading procedure. 5. Performance of the actual work execution activities. In 2017, the first nine packages were successfully loaded and shipped from NBL, while in 2019, the last ten were successfully loaded and planned for shipment. Without ANL leveraging SRNL's strengths, the de-inventorying of NBL of its plutonium CRMs would have likely taken many years longer. (authors)
U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)
The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.
The purpose of this Cooperative Research and Development Agreement (CRADA) was to test two rooftop commercial heating, ventilation, and air conditioning (HVAC) systems supplied by Carrier Corporation to determine if they met the laboratory test requirements of the United States Department of Energy (DOE) Commercial Building HVAC Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at Oak Ridge National Laboratory (ORNL) demonstrated that the systems met all requirements of the Challenge. Carrier Corporation has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the Challenge, the test plan created to measure the success of systems provided by Challenge participants, and the results of laboratory testing of the Carrier commercial rooftop systems.
The purpose of this CRADA was to test a nominal 3-ton capacity heat pump system supplied by Rheem Manufacturing to determine if it met the laboratory test requirements of the United States Department of Energy Cold Climate Heat Pump (CCHP) Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at ORNL demonstrated that the system met all requirements of the Challenge. Rheem Manufacturing has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the CCHP Challenge, the test plan created to measure the success of heat pump systems provided by CCHP Challenge participants, and the results of laboratory testing of the Rheem heat pump system.
The preponderance of matter over antimatter in the early universe, the dynamics of the supernovae that produced the heavy elements necessary for life, and whether protons eventually decay -- these mysteries at the forefront of particle physics and astrophysics are key to understanding the early evolution of our universe, its current state, and its eventual fate. The Deep Underground Neutrino Experiment (DUNE) is an international world-class experiment dedicated to addressing these questions as it searches for leptonic charge-parity symmetry violation, stands ready to capture supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector technical design report (TDR) describes the DUNE physics program and the technical designs of the single- and dual-phase DUNE liquid argon TPC far detector modules. Volume III of this TDR describes how the activities required to design, construct, fabricate, install, and commission the DUNE far detector modules are organized and managed. This volume details the organizational structures that will carry out and/or oversee the planned far detector activities safely, successfully, on time, and on budget. It presents overviews of the facilities, supporting infrastructure, and detectors for context, and it outlines the project-related functions and methodologies used by the DUNE technical coordination organization, focusing on the areas of integration engineering, technical reviews, quality assurance and control, and safety oversight. Because of its more advanced stage of development, functional examples presented in this volume focus primarily on the single-phase (SP) detector module.
The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.
Ecological restoration programs in dynamic coastal environments can benefit from adaptive management, including an iterative process for identifying and addressing critical uncertainties. We highlight key developments under the three pillars that have increased the rate of restoration by the Columbia Estuary Ecosystem Restoration Program (CEERP) over 20 years: science, coordination, and management. We show how such programs can be institutionalized to ensure that estuary ecosystems are better understood, conserved, and restored. The principal conservation effort under CEERP is to reconnect historical floodplain wetlands to the mainstem. The program also supports other restoration actions that demonstrate a high potential to benefit ecosystem function and endangered salmon populations, however, there is greater uncertainty regarding these less-utilized techniques. Through adaptive management, we address both technical uncertainty regarding benefits to the environmental resource and programmatic uncertainty pertaining to decision-making. Here, we examine three periods of CEERP growth to establish how complementary research and restoration actions have improved program outcomes over time. We highlight the tools and processes that were developed and integrated into the program to refine program strategy, improve project design, and maximize ecological benefits. CEERP supported 77 restoration projects and reconnected over 7,000 acres of floodplain habitat to the lower Columbia River between 2004 and 2021. Building on these successes, we outline current plans to better engage landowners and local communities, solicit new project types, and maintain enough flexibility within the program to adapt to new priorities.
In this article, we provide an overview of the experimental design, execution, education and public outreach, data collection, and initial scientific results from the Remote Sensing of Electrification, Lightning, and Mesoscale/Microscale Processes with Adaptive Ground Observations (RELAMPAGO) field campaign. RELAMPAGO was a major field campaign conducted in the Córdoba and Mendoza provinces in Argentina and western Rio Grande do Sul State in Brazil in 2018–19 that involved more than 200 scientists and students from the United States, Argentina, and Brazil. This campaign was motivated by the physical processes and societal impacts of deep convection that frequently initiates in this region, often along the complex terrain of the Sierras de Córdoba and Andes, and often grows rapidly upscale into dangerous storms that impact society. Observed storms during the experiment produced copious hail, intense flash flooding, extreme lightning flash rates, and other unusual lightning phenomena, but few tornadoes. The five distinct scientific foci of RELAMPAGO—convection initiation, severe weather, upscale growth, hydrometeorology, and lightning and electrification—are described, as are the deployment strategies to observe physical processes relevant to these foci. The campaign’s international cooperation, forecasting efforts, and mission planning strategies enabled a successful data collection effort. In addition, the legacy of RELAMPAGO in South America, including extensive multinational education, public outreach, and social media data gathering associated with the campaign, is summarized.
The purpose of this report is to provide molten salt reactor (MSR) developers and future US Nuclear Regulatory Commission (NRC) license applicants with recommendations for developing an effective and practical material control and accounting (MC&A) plan, focused primarily on MSR designs that use circulating liquid fuel. Because of the breadth of MSR designs, there is no single, generic, detailed MC&A plan that will work for every design. The wide variation of fresh fuel salts, the method and frequency of loading fresh fuel, the reactor system design components (e.g., tanks, filtration systems, chemical processing streams), and waste streams will determine the specific measurement locations and instrumentation that can best meet MC&A objectives throughout an MSR facility. Additionally, MSR designs are rapidly evolving, and new design features and deployment scenarios that will affect MC&A are being explored and pursued. This report defines a generic MC&A approach that was developed for terrestrial (as opposed to maritime) deployments to meet the intent of NRC domestic safeguards and MC&A. MSR license applicants should consider nuclear safeguards (both domestic and international) and security throughout the design, as early as the preconceptual design phase. MC&A of special nuclear material (SNM) is an aspect of the NRC’s domestic safeguards program, alongside physical protection. Because liquid-fueled MSRs are reactors with SNM in nondiscrete (or item) form, it is likely that the NRC may require liquid-fueled MSR license applicants to submit a formal MC&A plan as a part of their license application. Currently, the NRC licensing protocol presents a challenge because the NRC MC&A regulations have not been updated to accommodate advanced reactors, including types of MSRs. Because no liquid-fueled MSR has been licensed for operation at the time of this report, no template or precedence for a successfully licensed MSR MC&A plan exists. However, the MSR license applicant can take advantage of the NRC’s published commitments to performance-based regulations. The authors recommend that the license applicant, or MSR designers, develop an MC&A plan throughout the design lifecycle and plan to submit a detailed MC&A program description, or MC&A plan, to the NRC as a part of a license application. No MC&A plan template or guidance exists that is specific to liquid-fueled MSRs. The authors recommend that license applicants discuss the topic of MC&A during preapplication engagement. Because of the uniqueness of MC&A for liquid fueled MSRs, the authors recommend that liquid fueled MSR developers engage with the NRC on the topic of MC&A in the early phases of its design development and follow up any time there are significant modifications in design plans that would affect MC&A. For example, topics like modifications in fuel handling processes, changes in uranium enrichment, or additional chemical processing streams added to the design could be discussed with the NRC specifically on the topic of MC&A.
This report presents the success merits, logic design details, and test plans for adaptive protection schemes for microgrids, secondary distribution networks, and radial distribution feeders. Success merits are presented in terms of challenges and issues which should be mitigated. The challenges and issues were identified during site-specific simulations and analysis presented in a prior report. The adaptive protection logic designs are presented in a vendor-neutral manner to make them readily adaptable to site--specific protection relays and controllers which support custom logic design. Vendor-specific implementations of the logic for the adaptive protection laboratory tests are also presented. The final section of the report presents details of the testing methodology, plans, and documentation for each of the three adaptive protection schemes.
The Fermilab Linac delivers 400 MeV H- beam to the rest of the accelerator complex. The Linac will be replaced by a SRF Linac that doubles the output energy as part of the Proton Improvement Plan-II (PIP-II) project. For successful PIP-II commissioning and operation, a comprehensive suite of longitudinal and transverse measurements are planned to fully characterize the beam dynamics. In the 400 MeV Linac, we used prototype programs to demonstrate the viability of these workflows. Here we present the results of these measurements of longitudinal and transverse optics.
Experiments have been carried out at the EAST tokamak to study ITER-relevant scenario integration issues, related to edge localized mode (ELM) control in H-mode plasmas by the application of three-dimensional (3D) resonant magnetic perturbations (RMPs), which have a large impact on the execution of the ITER research plan. The EAST experiments have successfully demonstrated ELM suppression at normalized torque inputs similar to ITER. The application of RMP fields with high toroidal mode number (n = 4) reduces the impact of ELM control on energy and particle confinement compared to those use lower n (n = 1, 2) RMPs. Injection of successive pellets is found to be effective in increasing the plasma density in ELM-suppressed H-modes and reducing the divertor power without triggering large ELMs at EAST. Access to high recycling and radiative divertor conditions while maintaining ELM suppression has been demonstrated in EAST by the use of gas fuelling and neon impurity seeding. Both approaches have been found to be effective in reducing power fluxes to the divertor strike points in near-separatrix lobes for both n = 2 and n = 4 RMPs. Furthermore, reduction of power fluxes in off-separatrix lobes is only effective for n = 4 RMP application, which is consistent with magnetic topology modelling (including plasma response) results showing a shallow penetration into the confined plasma region of field lines connected to these lobes compared to n = 2. The EAST results support the use of high n 3D fields for ELM suppression in ITER high Q DT scenarios since they provide optimum integration features regarding energy and particle confinement, pellet fuelling, radiative divertor operation while eliminating ELM transient power loads and being compatible with low torque input.
This project, in completion of the Illinois Institute of Technology’s Professional Masters of Health Physics program, represents a two part independent study wherein (1) a Statistical Analysis is performed on a new data process implemented at a Los Alamos National Laboratory facility and (2) a Project Management Plan is designed for the successful implementation of this new radiation protection management process.
This project used turquoise computing time to support a LANL TED project focused on porting E3SM to classified computing resources. Computing time was used to test and confirm a complete and working simulation and analysis workflow prior to porting to yellow and SCI-level computing platforms. The code port and all planned simulations and analysis were successful. E3SM analysis from simulations on classified platforms was published to C2S and will be used to demonstrate and advertise LANL’s classified Earth system modeling and analysis capabilities to current and new customers in the intelligence community. This project also significantly improved library and E3SM analysis support on turquoise, yellow, and classified computing platforms at LANL, which will result in benefits beyond the work discussed here.