Search NASA⌕ Search

SEARCH · Search NASA

Results for “system value”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Applying the Transactive Systems Business Value Model to IRP

As part of the Transactive Systems Program at Pacific Northwest National Laboratory, a value modeling system was developed to support the evaluation of transactive systems. The technique is general enough to be applied outside transactive systems and to demonstrate this capability, a project was undertaken to use this value modeling technique as a means for modeling the valuation process undertaken by vertically integrated utilities when undergoing integrated resource planning (IRP). IRP is the process by which vertically integrated utilities (those that both serve customers directly as well as manage and run generation assets to do so) regularly go through to demonstrate to their regulators that they have a plan to meet the expected future load of their customers in a least cost and compliant manner. Traditionally this has been primarily an issue of how many and of which types of power plants to build but increasingly has included alternative measures such as demand response programs. Increasingly, environmental regulations play a significant role in both determine what types of power plants can be built under current regulations as well as what retrofits or upgrades need to be made to existing plants to allow them to continue to operate. Two use-case diagrams were constructed, one showing the showing the process by which IRP is carried out and another showing how a vertically integrated utility procures the resources it requires to meet load now and in the future. These diagrams help clarify the difference and provide a high-level outline of the two processes. A class diagram was constructed to clearly define the types of actors that would be considered in this model and the relationships between them. This diagram tacitly indicates which types of actors are and are not included in the model which provides significant guidance in defining the scope of the model. The relationship between the classes/actors provides further indication of what areas of the model have higher levels of detail and by implication bear more significance in modeling the system. Using the classes/actors defined in the class diagram, a business value diagram was constructed that defines the key value streams exchanged between the actors. This diagram provides a clear expression of the business case of the vertically integrated utility and who its counterparties are during the process of meeting load. These value streams have not only to do with meeting the load but doing so in a manner that meets environmental regulations. Increasingly, IRPs have three key metrics to evaluate a given plant to meet load: net present value of revenue required, emissions, and renewable energy credits. From this business value diagram, more detailed activity diagrams were formed that focus on a few of the key value stream exchanges, showing the process by which each party accrues value. These diagrams provide insight into the timing and sequence of the interactions in a way that the business value diagrams did not. The transactive value model was found to be highly compatible with IRP and provided a clear, simple model of the analysis done during IRP and key metrics driving IRP decisions. In particular it highlighted a few key items that may or may not have been as clear prior to the development of the model. Specifically, the role of the environmental regulations has become increasingly important and two of the three key metrics by which IRPs are typically evaluated are environmentally focused. Additionally, though generally not acknowledged, the role of the investor was included in this model as they are an essential source of capital in building new power plants and cannot be ignored when defining the business case of the vertically integrated utility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WAVES (Wind Asset Value Estimation System) [SWR-23-81]

The Wind Asset Value Estimation System (WAVES) model is a coupling framework for core NREL techno economic analysis software models to estimate capital expenditures (ORBIT), operational expenditures (WOMBAT), and energy production (FLORIS) for offshore wind power plants. Existing workflows to couple the three models for lifecycle performance and cost estimation require a large amount of manual and error-prone setup to combine both shared inputs and dependent outputs, as such WAVES's primary functionality is to wrap the core logic for running standard modeling workflows to ensure shared settings and entangled results are correctly and efficiently combined every time. SEE ALSO: https://pypi.org/project/WAVES/

Hammond, Robert↗

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.

42 ENGINEERING↗

OCTOKV: An Agile Network-Based Key-Value Storage System with Robust Load Orchestration

In this paper, we propose OctoKV, an innovative network-based key-value storage system. OctoKV addresses the repetitive address translation overhead associated with traditional key-value stores running on file systems on the client side. To mitigate this overhead, we implemented the key-value store on the server side using NVMe-oF and a user-level NVMe driver. In particular, we employed fine-grained resource monitoring and load balancing based on heuristics to optimize I/O performance. OctoKV is deployed on a Linux cluster with Intel SPDK. The extensive evaluation shows that OctoKV achieves lower I/O response times in comparison to traditional approaches where key-value stores run on the client side. Also, the proposed load balancing strategies efficiently enhance I/O response times by equally distributing the workload from overloaded cores to other cores.

Khan, Awais↗

Solar System Initial Abundnace Reader

This code is a simply python module that allows the user to read in the solar system value from a provided database. It simply reads in the database, and calculates ratios with various values. Currently, the solar system values from Lodders et al. (2009) are solely included. The tool is designed to assist a astrophysics / cosmochemist user in their daily life of calculating those ratios for programs and was written by the author to simplify his own life. A setup.py routine has been written as well. Release is anticipated via github as well as in the form of a pypi package.

Trappitsch, RetoG.↗

The value of compressed air energy storage with wind in transmission-constrained electric power systems

In this work, we examine the potential advantages of co-locating wind and energy storage to increase transmission utilization and decrease transmission costs. Co-location of wind and storage decreases transmission requirements, but also decreases the economic value of energy storage compared to locating energy storage at the load. This represents a tradeoff which we examine to estimate the transmission costs required to justify moving storage from load-sited to wind-sited in three different locations in the United States. We examined compressed air energy storage (CAES) in three “wind by wire” scenarios with a variety of transmission and CAES sizes relative to a given amount of wind. In the sites and years evaluated, the optimal amount of transmission ranges from 60% to 100% of the wind farm rating, with the optimal amount of CAES equal to 0–35% of the wind farm rating, depending heavily on wind resource, value of electricity in the local market, and the cost of natural gas.

Denholm, Paul↗

An Effective Earned Value Management System (EVMS) is a Team Sport

We present a novel framework to assess 27 earned value management system (EVMS) environment factors and investigate their impact on project performance. A study of the EVMS literature, a survey of practitioners, and focus group meetings with 36 EVMS industry and government experts, supported the development of the framework. Focus groups involving 80 practitioners refined and tested it. We analyzed performance data from 35 completed projects/programs representing over US$21.8 billion in total cost; a project demonstrating a positive environment could save up to 25% in cost versus baseline. Practitioners can develop an effective EVMS environment by following the provided guidance.

Aramali, Vartenie↗

Hybrid renewable energy systems: the value of storage as a function of PV-wind variability

As shares of variable renewable energy (VRE) on the electric grid increase, sources of grid flexibility will become increasingly important for maintaining the reliability and affordability of electricity supply. Lithium-ion battery energy storage has been identified as an important and cost-effective source of flexibility, both by itself and when coupled with VRE technologies like solar photovoltaics (PV) and wind. In this study, we explored the current and future value of utility-scale hybrid energy systems comprising PV, wind, and lithium-ion battery technologies (PV-wind-battery systems). Using a price-taker model with simulated hourly energy and capacity prices, we simulated the revenue-maximizing dispatch of a range of PV-wind-battery configurations across Texas, from the present through 2050. Holding PV capacity and point-of-interconnection capacity constant, we modeled configurations with varying wind-to-PV capacity ratios and battery-to-PV capacity ratios. We found that coupling PV, wind, and battery technologies allows for more effective utilization of interconnection capacity by increasing capacity factors to 60%–80%+ and capacity credits to close to 100%, depending on battery capacity. We also compared the energy and capacity values of PV-wind and PV-wind-battery systems to the corresponding stability coefficient metric, which describes the location-and configuration-specific complementarity of PV and wind resources. Our results show that the stability coefficient effectively predicts the configuration-location combinations in which a smaller battery component can provide comparable economic performance in a PV-wind-battery system (compared to a PV-battery system). These PV-wind-battery hybrids can help integrate more VRE by providing smoother, more predictable generation and greater flexibility.

14 SOLAR ENERGY↗

Decommissioning Cost Estimating Factors And Earned Value Integration

The Rocky Flats 771 Project progressed from the planning stage of decommissioning a plutonium facility, through the strip-out of highly-contaminated equipment, removal of utilities and structural decontamination, and building demolition. Actual cost data was collected from the strip-out activities and compared to original estimates, allowing the development of cost by equipment groupings and types and over time. Separate data was developed from the project control earned value reporting and compared with the equipment data. The paper discusses the analysis to develop the detailed factors for the different equipment types, and the items that need to be considered during characterization of a similar facility when preparing an estimate. The factors are presented based on direct labor requirements by equipment type. The paper also includes actual support costs, and examples of fixed or one-time start-up costs. The integration of the estimate and the earned value system used for the 771 Project is also discussed. The paper covers the development of the earned value system as well as its application to a facility to be decommissioned and an existing work breakdown structure. Lessons learned are provided, including integration with scheduling and craft supervision, measurement approaches, and verification of scope completion. In summary: The work of decommissioning the Rocky Flats 771 Project process equipment was completed in 2003. Early in the planning process, we had difficulty in identifying credible data and implementing processes for estimating and controlling this work. As the project progressed, we were able to collect actual data on the costs of removing plutonium contaminated equipment from various areas over the life of this work and associate those costs with individual pieces of equipment. We also were able to develop and test out a system for measuring the earned value of a decommissioning project based on an evolving estimate. These were elements that would have been useful to us in our early planning process, and we would expect that they would find application elsewhere as the DOE weapons complex and some commercial nuclear facilities move towards closure. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An assessment of the net value of CSP systems integrated with thermal energy storage

Within this study, we evaluate the operational and capacity value—or total system value—for multiple concentrating solar power (CSP) plant configurations under an assumed 33% renewable penetration scenario in California. We calculate the first-year bid price for two CSP plants, including a 2013 molten-salt tower integrated with a conventional Rankine cycle and a hypothetical 2020 molten-salt tower system integrated with an advanced supercritical carbon-dioxide power block. The overall benefit to the regional grid, defined in this study as the net value, is calculated by subtracting the first-year bid price from the total system value.

14 SOLAR ENERGY↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Climate change deniers, hippies, and preppers. Oh my!: Unpacking engineering student perceptions of renewable energy technology adoption in the United States

Engineers play a key role in the formation, operation, and maintenance of large socio-technical systems. Enmeshed in these practices of engineering are shared perceptions and visions of how society should be ordered, and what role of engineers should play. These value systems and how they shape the perception of who and where alternative energy belongs will shape who does or does not have the opportunity to participate in these alternative visions of energy. Drawing on engineering studies and dialectology research this study examines how a group of engineering students engaged in learning about renewable energy systems perceive the kinds of people in the United States who would or would not adopt alternative energy. Rather than see adoption/non-adoption as a purely “technical” matter, students brought their own perceptions of regional, social, and political differences to characterize the potential acceptability of each technology. Certain regions of the United States, despite their technical potential based on government and industry sources, are cast as too culturally backward and resistant to change to embrace new energy sources. In conclusion, these insights elucidate the importance of 'engineers' value systems as they continue to play a significant role in shaping the development of alternative energy technologies and markets.

Adoption↗

Expert perspectives on the wind plant of the future

Abstract Wind power technology has changed rapidly in recent years. Technology innovation, evolving power markets, and competing land and ocean uses continue to influence the design and operation of wind turbines and plants. Anticipating these trends and their impact on future facilities can inform commercial strategies and research priorities. Drawing from a recent survey of 140 of the world's foremost wind experts, we identify expectations of future wind plant design in 2035, both for onshore and offshore wind. Experts anticipate continued growth in turbine size, to 5.5 (onshore) and 17 MW (offshore), with plants located in increasingly less favorable wind and siting regimes. They expect plant sizes of 1,100 MW for fixed‐bottom and 600 MW for floating offshore wind. Experts forecast enhanced grid‐system value from wind through significant to widespread use of larger rotors, hybrid projects with batteries and hydrogen production, and more. To explain experts' perspectives on future plant design and operation, we identify five mechanisms: economies of unit, plant, and resource scale; grid‐system value economies; and production efficiencies. We characterize learning effects as a moderating influence on the strength of these mechanisms. In combination, experts predict that these design choices support levelized cost of energy reductions of 27% (onshore) and 17%–35% (floating and fixed‐bottom offshore) by 2035 compared to today, while enhancing wind energy's grid service offerings. Our findings provide a much‐needed benchmark for representing future wind technologies in power sector models and address a critical research gap by explaining the economics behind wind energy design choices.

17 WIND ENERGY↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗