Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Blue Origin De-orbit Descent and Landing Tipping Point: Program Final Report

The purpose of this document is to provide a final report on the Deorbit, Descent, and Landing (DDL) Tipping Point program, a public-private partnership between Blue Origin and NASA that is partially funded by NASA contract 80LARC19C0005. In this report we summarize the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. Only the portions funded by the government with associated unlimited rights are documented in detail in this report. For the work funded by Blue Origin, summaries with unlimited rights are provided for context and completeness. The Blue Origin funded work exceeded 25% of the originally proposed total program cost and included a mixture of hardware procurement and critical technology maturation. The scope of this document is a discussion of all the major tasks performed under the contract including the sensor flight demonstrations on New Shepard, the hardware in the loop lunar landing navigator demonstration, and the ground testing of the Flash LiDAR hazard sensor. The contributions from the multiple NASA teams – Johnson Space Center, Langley Research Center, Goddard Space Flight Center, and Jet Propulsion Laboratory – are described along with the contributions from Blue Origin. This document is the Final Report for statement of work item 4.1.2.10 as Deliverable 5.8.

Stefan Bieniawski↗

Energy Management and Information Systems (EMIS) Specification and Procurement Support Materials

This annotated Request for Proposal (RFP) template includes an Energy Management and Information System (EMIS) technology specification, an ongoing services specification, RFP evaluation criteria, and more. It is designed to guide building professionals through the specification, procurement, and selection of an EMIS or related building performance monitoring and diagnostic technology.

building performance↗

CFM technologies for space transportation: Multipurpose hydrogen testbed system definition and tank procurement

The development of a test bed tank and system for evaluating cryogenic fluid management technologies in a simulated upper stage liquid hydrogen tank is covered. The tank is 10 ft long and is 10 ft in diameter, and is an ASME certified tank constructed of 5083 aluminum. The tank is insulated with a combination of sprayed on foam insulation, covered by 45 layers of double aluminized mylar separated by dacron net. The mylar is applied by a continuous wrap system adapted from commercial applications, and incorporates variable spacing between the mylar to provide more space between those layers having a high delta temperature, which minimizes heat leak. It also incorporates a unique venting system which uses fewer large holes in the mylar rather than the multitude of small holes used conventionally. This significantly reduces radiation heat transfer. The test bed consists of an existing vacuum chamber at MSFC, the test bed tank and its thermal control system, and a thermal shroud (which may be heated) surrounding the tank. Provisions are made in the tank and chamber for inclusion of a variety of cryogenic fluid management experiments.

Fox, E. C.↗

NASA Alternate Access to Station Service Concept

The evolving nature of the NASA space enterprise compels the agency to develop new and innovative space systems concepts. NASA, working with increasingly strained budgets and a declining manpower base, is attempting to transform from operational activities to procurement of commercial services. NASA's current generation reusable launch vehicle, the Shuttle, is in transition from a government owned and operated entity to a commercial venture to reduce the civil servant necessities for that program. NASA foresees its second generation launch vehicles being designed and operated by industry for commercial and government services. The "service" concept is a pioneering effort by NASA. The purpose the "service" is not only to reduce the civil servant overhead but will free up government resources for further research - and enable industry to develop a space business case so that industry can sustain itself beyond government programs. In addition, NASA desires a decreased responsibility thereby decreasing liability. The Second Generation Reusable Launch Vehicle (RLV) program is implementing NASA's Space Launch Initiative (SLI) to enable industry to develop the launch vehicles of the future. The Alternate Access to Station (AAS) project office within this program is chartered with enabling industry to demonstrate an alternate access capability for the International Space Station (ISS). The project will not accomplish this by traditional government procurement methods, not by integrating the space system within the project office, or by providing the only source of business for the new capability. The project funds will ultimately be used to purchase a service to take re-supply cargo to the ISS, much the same as any business might purchase a service from FedEx to deliver a package to its customer. In the near term, the project will fund risk mitigation efforts for enabling technologies. AAS is in some ways a precursor to the 2nd Generation RLV. By accomplishing ISS resupply with existing technologies, not only will a new category of autonomous vehicles deliver cargo, but a commercial business base will be incubated that will improve the likelihood of commercial convergence with the next generation of RLVs. Traditional paradigms in government management and acquisition philosophy are being challenged in order to bring about the objective of the AAS project. The phased procurement approach is proving to be the most questionable aspect to date. This work addresses the fresh approach AAS is adopting in management and procurement through a study of the AAS history, current solutions, key technologies, procurement complications, and an incremental forward plan leading to the purchase of a service to deliver goods to ISS. Included in this work is a discussion of the Commercial Space Act of 1998 and how it affects government purchase of space launch and space vehicle services. Industry should find these topics pertinent to their current state of business.

Bailey, Michelle D.↗

Guidelines for the Procurement of Aerospace Nickel Cadmium Cells

NASA has been using a Modular Power System containing "standard" nickel cadmium (NiCd) batteries, composed of "standard" NiCd cells. For many years the only manufacturer of the NASA "standard" NiCd cells was General Electric Co. (subsequently Gates Aerospace and now SAFT). This standard cell was successfully used in numerous missions. However, uncontrolled technical changes, and changes in industrial restructuring require a new approach. General Electric (now SAFT Aerospace Batteries) had management changes, new manufacturers entered the market (Eagle-Picher Industries, ACME Electric Corporation, Aerospace Division, Sanyo Electric Co.) and battery technology advanced. New NASA procurements for aerospace NiCd cells will have specifications unique to the spacecraft and mission requirements. This document provides the user/customer guidelines for the new approach to procuring of and specifying performance requirements for highly reliable NiCd cells and batteries. It includes details of key parameters and their importance. The appendices contain a checklist, detailed calculations, and backup information.

Thierfelder, Helmut↗

Identifying institutional barriers and policy implications for sustainable energy technology adoption among large organizations in California

Large organizations wield considerable market power, their procurement activities can be leveraged to achieve social, economic and environmental goals by ‘pulling’ more desirable products into the market. However, while there is substantial research in individual consumer buying behavior and market barriers to sustainable technology adoption, less is known about large organizational buying behavior and the impact of institutional barriers in this area. To address these research gaps, in this work we conducted an exploratory study aimed at better understanding the process through which large organizations purchase sustainable energy technologies and what internal barriers they experience during that process. Additionally, we surveyed and interviewed 120 individuals involved in procurement from Californian organizations representing both public and private sectors. Survey results indicate the need to resolve the conflict between prioritizing lowest first cost and lowest life cycle cost, better engage multiple stakeholders involved in internal decision-making around purchasing, and improve existing procurement tools or offer new ones. We provide recommendations for how policymakers can apply our findings to increase the adoption of sustainable energy technologies in their own organizations and communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

The NASA Redox Storage System Development project, 1980

The technical accomplishments pertaining to the development of Redox systems and related technology are outlined in terms of the task elements: prototype systems development, application analyses, and supporting technology. Prototype systems development provides for a major procurement to develop an industrial capability to take the current NASA Lewis technology and go on to the design, development, and commercialization of iron-chromium Redox storage systems. Application analyses provides for the definition of application concepts and technology requirements, specific definition studies, and the identification of market sectors and their penetration potential. Supporting technology includes both in house and contractual efforts that encompass implementation of technology improvements in membranes, electrodes, reactant processing, and system design. The status of all elements is discussed.

Source record↗

Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis

In support of the national goal to deploy 30 gigawatts of offshore wind by 2030, DOE’s Wind Energy Technologies Office has published an Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis. Transmission constraints— including both land-based transmission interconnections and offshore transmission—are expected to be one of the central challenges to meeting offshore wind deployment goals. Given current trends in offshore wind development, available technology, and state-level procurement goals, most of the first 30 GW of offshore wind are anticipated to be developed along the East Coast. This report summarizes current publicly available transmission analyses along the Atlantic Coast, as well as gaps in existing analyses. Improving understanding of offshore wind transmission options, establishing coordination and aligning processes among states and regions, and quantifying the long-term impacts of offshore wind transmission options will catalyze offshore wind energy’s growth and ensure adequate transmission and a reliable grid.

17 WIND ENERGY↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

Space Shuttle Upgrades: Long Life Alkaline Fuel Cell

NASA has utilized the alkaline fuel cell technology to provide electrical power for manned launch vehicles such as Gemini, Apollo, and the Space Shuttle. The current Shuttle alkaline fuel cells are procured from UTC Fuel Cells, a United Technologies Company. The alkaline fuel cells are very reliable but the operating life is limited to 2600 hours due to voltage degradation of the individual cells. The main limiting factor in the life of the cells is corrosion of the cell's fiberglass/epoxy frame by the aqueous potassium hydroxide electrolyte. To reduce operating costs, the orbiter program office approved the Long Life Alkaline Fuel Cell (LLAFC) program as a shuttle upgrade in 1999 to increase the operating life of the fuel cell powerplant to 5000 hours. The LLAFC program incorporates improving the cell by extending the length of the corrosion path, which reduces the cell frame corrosion. UTCFC performed analysis to understand the fundamental mechanisms that drive the cell frame corrosion. The analysis indicated that the corrosion path started along the bond line between the cathode and the cell frame. Analysis also showed that the oxygen available at the cathode, the catalyst on the electrode, and the electrode substrate all supported or intensified the corrosion. The new cell design essentially doubled the corrosion path to mitigate the problem. A 10-cell stack was tested for 5000 hours during the development phase of this program to verify improved cell performance. A complete 96-cell stack was then tested for 5000 hours during the full manned-space qualification phase of this program. Additional upgrades to the powerplant under this program are: replacing the aluminum body in the pressure regulator with stainless steel to reduce corrosion, improving stack insulator plate with improved resistance to stress failure and improved temperature capability, and replacing separator plate elastomer seals with a more durable material and improved seal retention.

Kerri McCurdy↗

Deep Retrofits for Multifamily: Experiences in Scaling to Zero Energy: Preprint

Zero net energy (ZNE) buildings are needed to reverse the growing trend of increasing energy consumption. But to make dramatic changes, existing buildings must be renovated at scale. In addition, the building stock must be electrified so that its energy needs could be met by renewable generation. Such aggressive goals often mean very high custom design and capital construction costs. Suitable options for comprehensive envelope retrofits can be too expensive to be practical, and electrification requires upgrades to building-level electrical infrastructure. This paper is a case study of eight projects—primarily multifamily residential—that strived for zero-energy, all-electric retrofits. The design teams were challenged to create solutions that could be replicated at scale, showing decreasing costs with broader adoption. Key technologies considered in designing cost-effective, scalable solutions include industrialized prefabricated retrofit components, modular HVAC solutions, and innovative domestic hot water systems. We trace the progress toward the goals set and examine the choices made by the teams as they encountered technical, logistical, and cost barriers. We also discuss financial challenges for multifamily retrofits, provide guidance for incentives, and examine procurement processes for design services and technologies.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Ramp Technology and Intelligent Processing in Small Manufacturing

To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.

Rentz, Richard E.↗

Energy Storage Market Transformation Through Stored Energy Targets

Aggressive energy decarbonization targets will require the rapid deployment of renewable energy in the U.S. in coming years. As the amount of variable generation on the grid grows, there will be an increasing need for long-duration energy storage (LDES) technologies to maintain grid reliability. Meeting that need will require a suite of technology alternatives with different capabilities. Many of these alternatives, however, are in a nascent state and face significant commercialization challenges. In the last decade, 10 U.S. states have enacted energy storage mandates as a vehicle for market transformation to accommodate energy storage. Those mandates, however, fail to send appropriate investment signals for LDES technologies because they are based on energy storage capacity and treat all technologies the same, regardless of duration. This paper explores the idea of replacing capacity-based storage procurement targets with stored energy targets, which would be technology-neutral policies designed to enable the market transformation necessary to support a competitive LDES industry.

Twitchell, Jeremy B.↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

NASA Hybrid Thermally Efficient Core (HyTEC) Phase 2 Q3’GFY25 to Q2’GFY26 Unlimited Rights Annual Report for CLIN 1 and 2

The HyTEC Phase 2 Project focuses on the development and demonstration of high-power density, small engine core gas turbine engine technologies. The focus of HyTEC on these small engine core technologies will provide direct benefits to the next single-aisle class aircraft in terms of thermal efficiency, as well as integrate with other technologies, through increased hybridization, as they mature to provide substantial continuous fuel burn reductions during the aircraft lifecycle. These advances will strengthen the US position in the commercial aviation engine market and enable cost benefits in commercial aviation. In Government fiscal year 26 the HyTEC Project was closed and contract moved to the Subsonic Vehicle Technologies and Tools Project. GE Aerospace is executing two major work plans as part of the HyTEC Phase 2 contract. The first is Contract Line-Item Number (CLIN) 001 and its objective is to mature High Pressure Turbine (HPT) aerodynamics technology to TRL 5 through multiple rigs so that it may be incorporated into a complete TRL 6 evaluation and unlock learnings for the engine core demonstration as applicable. CLIN 002, the second work plan, is to design, procure and test a cost shared portion of technologies on the TRL6 Compact Core test vehicle. The compact core demonstrated through HyTEC Phase 2 along with the HPT rig TRL advancement directly matures the technologies being developed as part of the CFM RISE demonstrator program which is targeting a more than 20% fuel burn reduction at the engine level versus today’s state of the art. The RISE program’s objective is to advance both the novel Open Fan architecture, compact core technologies and advanced systems such as hybrid electric needed to achieve the desired fuel burn reduction to TRL6 ahead of a new product introduction in the single-aisle class aircraft in the 2030s timeframe.

gas turbine engine↗