Search NASA⌕ Search

SEARCH · Search NASA

Results for “unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Semi-Markov Unreliability Range Evaluator (SURE)

Analysis tool for reconfigurable, fault-tolerant systems, SURE provides efficient way to calculate accurate upper and lower bounds for death state probabilities for large class of semi-Markov models. Calculated bounds close enough for use in reliability studies of ultrareliable computer systems. Written in PASCAL for interactive execution and runs on DEC VAX computer under VMS.

Butler, R. W.↗

Redundancy: How Many Unreliable Spares are Needed for High Reliability and Confidence on a Time Limited Mission?

This paper investigates the number of redundant units needed to achieve high reliability with high confidence. The approach applies to the case where the unit failure rate is too high for a single unit to provide the required reliability over the mission duration. To achieve high reliability, the design then uses N redundant units, one operating unit and N – 1 spares. If the unit failure rate is f, the mission length is L, and f * L is small (not the case assumed here), the unit failure probability over the mission duration is F1 = f * L << 1. In this case, the probability that all N units will fail is FN = F1N, and the needed N = LN(FN)/LN(F1). For the case of large f * L assumed here, F1 = f * L > 1, and F1 is the expected number of failures during the mission. The needed redundancy, N, to achieve the specified N unit reliability, FN, can be computed using the cumulative Poisson distribution with mean equal to F1. The number of spares, N - 1, is increased until the probability - that the total number of failures will be less than N -1 - achieves the required reliability. The confidence that this reliability can be achieved can be computed using the cumulative Poisson distribution or the chi-square distribution. Since the measured unit failure rate, f, has some uncertainty, the confidence that the rate is not lower than the actual failure rate and the required reliability is not overestimated is about 50%. Adding more redundant units increases the confidence that the required reliability, FN, will be achieved. For a fixed number of redundant units, the expected reliability and confidence can be traded off, since lower reliability goals have higher confidence in being achieved. Both the required reliability and confidence can be specified initially and the needed number of redundant units computed using the measured failure rate. The unit failure rate is determined by initial reliability growth testing to remove design errors and to better estimate the final constant failure rate. Reducing the failure rate and reducing its variance both reduce the number of redundant units needed for the required reliability and confidence. Since the total cost is the sum of the costs of the units and of the testing, there is an optimum test time that produces minimum cost.

Harry W. Jones↗

Redundancy: How Many Unreliable Spares are Needed for High Reliability and Confidence?

This paper investigates the number of redundant units needed to achieve high reliability with high confidence. The approach is developed for the case when the system failure rate is too high for a single unit to provide the required reliability over the mission duration. To achieve high reliability, N redundant units can be used, one operating unit and N – 1 spares. If the unit failure rate is f, the mission length is L, and f * L is small (not the case assumed here), the unit failure probability over the mission duration is F1 = f * L << 1. In this case, the probability that all N units will fail is Ffail = F1 N , and the needed redundancy N = LN(F)/LN(F1). For the case of large f * L assumed here, F1 = f * L > 1, and F1 is the expected number of failures during the mission. (When F1 = f * L << 1, F1 is the probability that a unit will fail during the mission. When F1 = f * L > 1, F1 is the expected number of failures during the mission.) The needed redundancy, N, to achieve the required N redundant unit reliability, FN, can be computed using the cumulative Poisson distribution with mean equal to F1. The number of spares, N - 1, is increased until the probability - that the total number of failures will be less than N -1 - is equal to the required reliability. The confidence that this reliability can be achieved can be computed using the cumulative Poisson distribution or the chi-square distribution. Since the measured unit failure rate, f, has some probabilistic uncertainty, the actual failure rate will be randomly higher or lower. This means that the reliability of the N redundant systems will be overestimated about half the time. Adding more redundant units increases the confidence that the required reliability will be achieved. For a fixed number of redundant units, the expected reliability and confidence can be traded off, since lower reliability goals will be achieved with higher confidence. Both the desired reliability and confidence can be specified as initial requirements and the needed number of redundant units estimated using the measured failure rate.

Redundancy↗

APIS: Honeybee Foraging Task Assignment for Use in Uncertain and Unreliable Environments

Multiagent Cyber-Physical-Human (CPH) systems in realistic environments operate under uncertain conditions. Communication among agents, aimed at reducing the uncertainty, is itself subject to uncertainty. We propose to manage uncertainties in autonomous, long-duration operations of multiagent systems via a modified Honeybee Foraging (HBF) behavioral scheme. The resulting system, Autonomous Persistent Intelligent Swarm (APIS),incorporates two new behaviors to ameliorate informational uncertainty. When “scouting”, agents are tasked based on informational quality and reliability rather than solely on priorities. When “dancing”, agents are tasked to rendezvous with other dancing agents to exchange information at close range, where successful communication is guaranteed. When coupled with uncertainty-aware modeling across agents, these behaviors improve situational awareness and resilience of the system, enabling it to function under more uncertain conditions arising during long-duration missions.

Autonomous systems↗

APIS: Honeybee Foraging Task Assignment for Use in Uncertain and Unreliable Environments

Multiagent Cyber-Physical-Human (CPH) systems in realistic environments operate under uncertain conditions. Communication among agents, aimed at reducing the uncertainty, is itself subject to uncertainty. We propose to manage uncertainties in autonomous, long-duration operations of multiagent systems via a modified Honeybee Foraging (HBF) behavioral scheme. The resulting system, Autonomous Persistent Intelligent Swarm (APIS),incorporates two new behaviors to ameliorate informational uncertainty. When “scouting”, agents are tasked based on informational quality and reliability rather than solely on priorities. When “dancing”, agents are tasked to rendezvous with other dancing agents to exchange information at close range, where successful communication is guaranteed. When coupled with uncertainty-aware modeling across agents, these behaviors improve situational awareness and resilience of the system, enabling it to function under more uncertain conditions arising during long-duration missions.

Autonomous systems↗

System Study: Residual Heat Removal 1998-2014

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified in the RHR results. A highly statistically significant decreasing trend was observed for the RHR injection mode start-only unreliability. Statistically significant decreasing trends were observed for RHR shutdown cooling mode start-only unreliability and RHR shutdown cooling model 24-hour unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2022

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the RCIC system start-only unreliability and 8-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2014

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. An extremely statistically significant increasing trend was observed for EPS system unreliability for an 8-hour mission. A statistically significant increasing trend was observed for EPS system start-only unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Isolation Condenser 1998-2014

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified. A statistically significant decreasing trend was identified for ISO unreliability. The magnitude of the trend indicated a 1.5 percent decrease in system unreliability over the last 10 years.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Auxiliary Feedwater 1998-2020

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 69 U.S. commercial nuclear reactors. Demand, run hour, and failure data from calendar year 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability and AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998-2022

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant increasing trends were identified in both the HPCS system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗