Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Creating an Advanced Sensor Network to calculate real-time, mass-weighted flue gas composition and air heater leakage of a coal-fired utility boiler under dynamic operating conditions

Utilization of renewable energy sources to minimize the environmental impact of energy production has changed the way utility boilers operate, requiring frequent load cycling between full load and partial loads as low as 30%. Dynamic operation of coal-fired utility boilers significantly reduces boiler efficiency when compared to steady state at full load. Data-driven plant optimization has shown success with coal-fired utility boilers under dynamic operating conditions. The purpose of this work was to create an Advanced Sensor Network (ASN) to provide more extensive real-time data to inform dynamic plant optimization of Net Unit Heat Rate (NUHR). The ASN consists of gas sampling grids in the convective pass of the boiler and downstream of the air heater. These sampling grids allow for quantification of spatial variation of flue gas within the boiler and calculation of mass-weighted composition of flue gas through the combination of composition, velocity, and temperature measurements. The comparison of O 2 between the inlet and outlet of the air heater is used to calculate air leakage in real time. Flue gas composition and air heater leakage are both important factors in boiler efficiency and NUHR. Further, the results of this work support the value of mass-weighted averages for determining flue gas composition accurately. The measurements from the ASN show increased composition stratification during dynamic operation, with an average standard deviation 38% higher than observed during steady-state operation. Air heater leakage was also observed to increase from 2.8% to 5.1% following a load change. Prior to the installation of the ASN, these data would not have been available for dynamic control. These real-time data will be leveraged to calculate and optimize for NUHR during dynamic operation in future work.

42 ENGINEERING↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Real-Time Multiprocessor Programming Language (RTMPL) user's manual

A real-time multiprocessor programming language (RTMPL) has been developed to provide for high-order programming of real-time simulations on systems of distributed computers. RTMPL is a structured, engineering-oriented language. The RTMPL utility supports a variety of multiprocessor configurations and types by generating assembly language programs according to user-specified targeting information. Many programming functions are assumed by the utility (e.g., data transfer and scaling) to reduce the programming chore. This manual describes RTMPL from a user's viewpoint. Source generation, applications, utility operation, and utility output are detailed. An example simulation is generated to illustrate many RTMPL features.

Arpasi, D. J.↗

International utilization and operations

The international framework of the Space Station Freedom Program is described. The discussion covers the U.S. space policy, international agreements, international Station elements, overall program management structure, and utilization and operations management. Consideration is also given to Freedom's user community, Freedom's crew, pressurized payload and attached payload accommodations, utilization and operations planning, user integration, and user operations.

Goldberg, Stanley R.↗

Planetary Surface Operations and Utilization: How ISS and Artemis Missions Can Be Used to Model Human Exploration of Mars

As NASA moves forward with plans to send astronauts to the Moon under Artemis missions and prepare for human exploration of Mars, the Agency is developing a set of high-level objectives for human spaceflight, identifying 50 points falling into four overarching categories of exploration. An element in NASA’s overall process of achieving these objectives is to leverage its assets and missions – such as the many crew increments sent to the International Space Station and future Artemis expeditions sent to the Moon – to develop more robust spaceflight systems and build a culture of interplanetary human exploration. This paper describes several examples of how NASA is exercising a process to achieve these objectives for future human Mars surface missions; both (a) building on lessons learned from ISS missions and maturing plans for Artemis missions, and (b) using human Mars mission planning to inform the plans for future ISS and Artemis missions so that the knowledge gained will reduce uncertainty and risk for Mars. One focal point for this two-way interaction between ISS and Artemis with future human Mars missions is a document titled “Reference Surface Activities for Crewed Mars Mission Systems and Utilization” (HEOMD-415), which describes the systems and operations of the crew thought necessary for the first human Mars surface mission. The details described in this paper will address three specific aspects of HEOMD-415 that have been influenced by ISS and where HEOMD-415 is influencing plans in ISS, Artemis, research and technology development, and other related aspects: (1) crew (activity planning and medical), (2) Mars surface infrastructure, and (3) communication and navigation support. The paper will close by describing near-term opportunities for tests and analogs relevant to these aspects of HEOMD-415.

Mars↗

PLANETARY SURFACE OPERATIONS AND UTILIZATION: HOW ISS AND ARTEMIS MISSIONS CAN BE USED TO MODEL HUMAN EXPLORATION OF MARS

As NASA moves forward with plans to send astronauts to the Moon under Artemis missions and prepare for human exploration of Mars, the Agency is developing a set of high-level objectives for human spaceflight, identifying 50 points falling into four overarching categories of exploration. An element in NASA’s overall process of achieving these objectives is to leverage its assets and missions – such as the many crew increments sent to the International Space Station and future Artemis expeditions sent to the Moon – to develop more robust spaceflight systems and build a culture of interplanetary human exploration. This paper describes several examples of how NASA is exercising a process to achieve these objectives for future human Mars surface missions; both (a) building on lessons learned from ISS missions and maturing plans for Artemis missions, and (b) using human Mars mission planning to inform the plans for future ISS and Artemis missions so that the knowledge gained will reduce uncertainty and risk for Mars. One focal point for this two-way interaction between ISS and Artemis with future human Mars missions is a document titled “Reference Surface Activities for Crewed Mars Mission Systems and Utilization” (HEOMD-415), which describes the systems and operations of the crew thought necessary for the first human Mars surface mission. The details described in this paper will address three specific aspects of HEOMD-415 that have been influenced by ISS and where HEOMD-415 is influencing plans in ISS, Artemis, research and technology development, and other related aspects: (1) crew (activity planning and medical), (2) Mars surface infrastructure, and (3) communication and navigation support. The paper will close by describing near-term opportunities for tests and analogs relevant to these aspects of HEOMD-415.

Mars↗

Radiation, optical, power flow, and electrical diagnostics at the Z facility: Layout and techniques utilized to operate in the harsh environment

The Z machine is a current driver producing up to 30 MA in 100 ns that utilizes a wide range of diagnostics to assess accelerator performance and target behavior conduct experiments that use the Z target as a source of radiation or high pressures. Here, we review the existing suite of diagnostic systems, including their locations and primary configurations. The diagnostics are grouped in the following categories: pulsed power diagnostics, x-ray power and energy, x-ray spectroscopy, x-ray imaging (including backlighting, power flow, and velocimetry), and nuclear detectors (including neutron activation). We will also briefly summarize the primary imaging detectors we use at Z: image plates, x-ray and visible film, microchannel plates, and the ultrafast x-ray imager. The Z shot produces a harsh environment that interferes with diagnostic operation and data retrieval. We term these detrimental processes “threats” of which only partial quantifications and precise sources are known. Finally, we summarize the threats and describe techniques utilized in many of the systems to reduce noise and backgrounds.

47 OTHER INSTRUMENTATION↗

The noise environment of a school classroom due to the operation of utility helicopters

Noise measurements under controlled conditions have been made inside and outside of a school building during flyover operations of four different helicopters. The helicopters were operated at a condition considered typical for a police patrol mission. Flyovers were made at an altitude of 500 ft and an airspeed of 45 miles per hour. During these operations acoustic measurements were made inside and outside of the school building with the windows closed and then open. The outside noise measurements during helicopter flyovers indicate that the outside db(A) levels were approximately the same for all test helicopters. For the windows closed case, significant reductions for the inside measured db(A) values were noted for all overflights. These reductions were approximately 20 db(A); similar reductions were noted in other subjective measuring units. The measured internal db(A) levels with the windows open exceeded published classroom noise criteria values; however, for the windows-closed case they are in general agreement with the criteria values.

Hilton, D. A.↗

Application of Advanced Metering Infrastructure Data to Advanced Utility System Operations: Cooperative Research and Development, CRADA Number CRD-17-00712 (Final Report)

The primary objective of the proposed project is to evaluate the capabilities of Advanced Metering Infrastructure (AMI) based controls for grid operations. This includes monitoring and control at the secondary transformer level using existing AMI infrastructure. In addition, some of the challenges of using a model-less control will also be identified. The lessons learned will be disseminated to other utilities around the country through peer-reviewed publications with the consent of SDG&E. The scope of the work includes using data from SDG&E's existing AMI infrastructure and working with third party vendors selected by SDG&E. The grid edge monitoring systems and controls provided by the selected vendors will perform grid operations using AMI data. The National Renewable Energy Laboratory (NREL) will perform a software and controller-based evaluation of the grid edge controller, intelligent devices and sensors, at the Energy System Integration Facility (ESIF) laboratory.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

OpenStudio: A Platform for Ex Ante Incentive Programs

Many utilities operate programs that provide ex ante (up front) incentives for building energy conservation measures (ECMs). A typical incentive program covers two kinds of ECMs. ECMs that deliver similar savings in different contexts are associated with pre-calculated 'deemed' savings values. ECMs that deliver different savings in different contexts are evaluated on a 'custom' per-project basis. Incentive programs often operate at less than peak efficiency because both deemed ECMs and custom projects have lengthy and effort-intensive review processes--deemed ECMs to gain confidence that they are sufficiently context insensitive, custom projects to ensure that savings are claimed appropriately. DOE's OpenStudio platform can be used to automate ex ante processes and help utilities operate programs more efficiently, consistently, and transparently, resulting in greater project throughput and energy savings. A key concept of the platform is the OpenStudio Measure, a script that queries and transforms building energy models. Measures can be simple or surgical, e.g., applying different transformations based on space-type, orientation, etc. Measures represent ECMs explicitly and are easier to review than ECMs that are represented implicitly as the difference between a with-ECM and without-ECM models. Measures can be automatically applied to large numbers of prototype models--and instantiated from uncertainty distributions--facilitating the large scale analysis required to develop deemed savings values. For custom projects, Measures can also be used to calibrate existing building models, to automatically create code baseline models, and to perform quality assurance screening.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗