Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Utility operational experience on the NASA/DOE MOD-0A 200-kW wind turbine

The Mod-0A 200 wind turbine was designed and fabricated as part of the Federal Wind Energy Program. Early wind turbine operation and performance data were obtained while gaining initial experience in the operation of large, horizontal axis wind turbines in typical utility environments. The Mod-0A wind turbine was turned over to the Town of Clayton Light and Water Plant, Clayton, NM, for utility operation and on December 31, 1978, the machine had completed ten months of utility operation. The machine is described and the recent operational experience at Clayton, NMis documented.

Glasgow, J. C.↗

Utility operational experience on the NASA/DOE Mod-OA 200 kW Wind Turbine

The Mod-OA 200 kW Wind Turbine was designed and fabricated by the Lewis Research Center of the NASA under the direction of the U.S. Department of Energy. The project is a part of the Federal Wind Energy Program and is designed to obtain early wind turbine operation and performance data while gaining initial experience in the operation of large, horizontal axis wind turbines in typical utility environments. On March 6, 1978, the Mod-OA wind turbine was turned over to the Town of Clayton Light and Water Plant, Clayton, NM, for utility operation and on December 31, 1978 the machine had completed ten months of utility operation. This paper describes the machine and documents the recent operational experience at Clayton, NM.

Glasgow, J. C.↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

he exponential growth of data centers—driven by artificial intelligence and cloud computing—is reshaping the U.S. energy landscape, presenting urgent challenges and transformative opportunities for data center developers, nuclear energy providers, and utility operators. As data centers are projected to consume up to 12% of U.S. electricity by 2028, stakeholders must address rapid deployment needs, grid congestion, and the demand for reliable, high-quality power. This presentation explores the multifaceted barriers to integrating data centers with nuclear and utility infrastructure, including land use constraints, public perception, regulatory complexity, and workforce alignment. It highlights the distinct priorities and operational cultures of each sector, and the friction that arises from misaligned planning horizons and risk tolerances. We examine collaborative strategies such as co-siting, hybrid power-purchase agreements, unified community engagement, and innovative financing models.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

NSTS operations utilization directorate

A basic understanding is provided of the National Space Transportation System payload processing operations performed at NASA-Kennedy. The payload facilities, support services, and ground support equipment used to support that process are described.

Morian, John↗

Operational utilization of remotely sensed data

The use of data from environmental satellites and other remote sensing platforms in some of NOAA's operational services are described. Topics discussed include: hurricanes; severe local storms and tornadoes; forest guidance; weather forecasting; hydrology; space program support; oceanography; search and rescue; and wildlife management. Applications which have become routine, and those which are in advanced field test are included. Some applications yield a clear cut economic benefit. In other cases, benefits -- if any -- are obscure. In yet other cases, benefits in one sector may be offset by detriments in another. Illustrative examples are given.

Jones, J. B.↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Objective Operational Utilization of Satellite Microwave Scatterometer Observations of Tropical Cyclones

This study has demonstrated that high-resolution scatterometer measurements in tropical cyclones and other high-marine surface wind regimes may be retrieved accurately for wind speeds up to about 35 mls (1-hour average at 10 m) when the scatterometer data are processed through a revised geophysical model function, and a spatial adaptive algorithm is applied which utilizes the fact that wind direction is so tightly constrained in tile inner core of severe marine storms that wind direction may be prescribed from conventional data. This potential is demonstrated through case studies with NSCAT data in a severe West Pacific Typhoon (Violet, 1996) and an intense North Atlantic hurricane (Lili, 1996). However, operational scatterometer winds from NSCAT and QuickScat in hurricanes and severe winter storms are biased low in winds above 25 m/s. We have developed an inverse model to specify the entire surface wind field about a tropical cyclone from operational QuickScat scatterometer measurements within 150 nm of a storm center with the restriction that only wind speeds up to 20 m/s are used until improved model function are introduced. The inverse model is used to specify the wind field over the entire life-cycle of Hurricane Floyd (1999) for use to drive an ocean wave model. The wind field compares very favorably with wind fields developed from the copious aircraft flight level winds obtained in this storm.

Cardone, Vincent J.↗

The Wind Forecast Improvement Project (WFIP): A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations. The Southern Study Area, Final Report

This Final Report presents a comprehensive description, findings, and conclusions for the Wind Forecast Improvement Project (WFIP) -- Southern Study Area (SSA) work led by AWS Truepower (AWST). This multi-year effort, sponsored by the Department of Energy (DOE) and National Oceanographic and Atmospheric Administration (NOAA), focused on improving short-term (15-minute - 6 hour) wind power production forecasts through the deployment of an enhanced observation network of surface and remote sensing instrumentation and the use of a state-of-the-art forecast modeling system. Key findings from the SSA modeling and forecast effort include: 1. The AWST WFIP modeling system produced an overall 10 - 20% improvement in wind power production forecasts over the existing Baseline system, especially during the first three forecast hours; 2. Improvements in ramp forecast skill, particularly for larger up and down ramps; 3. The AWST WFIP data denial experiments showed mixed results in the forecasts incorporating the experimental network instrumentation; however, ramp forecasts showed significant benefit from the additional observations, indicating that the enhanced observations were key to the model systems’ ability to capture phenomena responsible for producing large short-term excursions in power production; 4. The OU CAPS ARPS simulations showed that the additional WFIP instrument data had a small impact on their 3-km forecasts that lasted for the first 5-6 hours, and increasing the vertical model resolution in the boundary layer had a greater impact, also in the first 5 hours; and 5. The TTU simulations were inconclusive as to which assimilation scheme (3DVAR versus EnKF) provided better forecasts, and the additional observations resulted in some improvement to the forecasts in the first 1 - 3 hours.

17 WIND ENERGY↗

The Wind Forecast Improvement Project (WFIP). A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations -- the Northern Study Area

This report contains the results from research aimed at improving short-range (0-6 hour) hub-height wind forecasts in the NOAA weather forecast models through additional data assimilation and model physics improvements for use in wind energy forecasting. Additional meteorological observing platforms including wind profilers, sodars, and surface stations were deployed for this study by NOAA and DOE, and additional meteorological data at or near wind turbine hub height were provided by South Dakota State University and WindLogics/NextEra Energy Resources over a large geographical area in the U.S. Northern Plains for assimilation into NOAA research weather forecast models. The resulting improvements in wind energy forecasts based on the research weather forecast models (with the additional data assimilation and model physics improvements) were examined in many different ways and compared with wind energy forecasts based on the current operational weather forecast models to quantify the forecast improvements important to power grid system operators and wind plant owners/operators participating in energy markets. Two operational weather forecast models (OP_RUC, OP_RAP) and two research weather forecast models (ESRL_RAP, HRRR) were used as the base wind forecasts for generating several different wind power forecasts for the NextEra Energy wind plants in the study area. Power forecasts were generated from the wind forecasts in a variety of ways, from very simple to quite sophisticated, as they might be used by a wide range of both general users and commercial wind energy forecast vendors. The error characteristics of each of these types of forecasts were examined and quantified using bulk error statistics for both the local wind plant and the system aggregate forecasts. The wind power forecast accuracy was also evaluated separately for high-impact wind energy ramp events. The overall bulk error statistics calculated over the first six hours of the forecasts at both the individual wind plant and at the system-wide aggregate level over the one year study period showed that the research weather model-based power forecasts (all types) had lower overall error rates than the current operational weather model-based power forecasts, both at the individual wind plant level and at the system aggregate level. The bulk error statistics of the various model-based power forecasts were also calculated by season and model runtime/forecast hour as power system operations are more sensitive to wind energy forecast errors during certain times of year and certain times of day. The results showed that there were significant differences in seasonal forecast errors between the various model-based power forecasts. The results from the analysis of the various wind power forecast errors by model runtime and forecast hour showed that the forecast errors were largest during the times of day that have increased significance to power system operators (the overnight hours and the morning/evening boundary layer transition periods), but the research weather model-based power forecasts showed improvement over the operational weather model-based power forecasts at these times.

17 WIND ENERGY↗

Distributed Ledger Technology Preliminary Performance Assessment for Applications in Utilities Operational Technology

This paper provides descriptions of the key components of different distributed ledger technology platforms. Distributed ledger technology (DLT) allows for distribution of databases among different organizations and devices. The platforms use cryptographically linked “blocks” to store and verify transactional information between these organizations. DLT increases data security, data integrity, trust among its participants. Different organizations are looking to deploy this distributed and decentralized approach to avoid the single-point-of-failure vulnerabilities associated with centralized data repositories. In this study we examine twelve different DLT platforms. There is agreement within the community that of all the platforms considered here, Hyperledger and Ethereum are the most mature when it comes to privacy and permissions. These DLT platforms are being used for applications such as transactive energy, health care, and the food and goods supply chain. However, further development is required to realize the full promise of DLT. Our assessment includes a general description of each DLT and its key characteristics. Such characteristics include consensus protocol and cryptography used, public vs. private, and permissioned or permissionless. The selection and implementation of a DLT architecture depends heavily on the use case and performance requirements. During this research we found key parameters to measure performance and existing tools for assessment. Four different parameters were identified 1) consensus, 2) throughput, 3) latency, and 4) scalability. The architectures of Hyperledger Caliper and Blockbench are described as different performance assessment frameworks. From this preliminary study it is evident that there are dissimilarities on the performance assessments methods developers and users are characterizing DLT architectures. The purpose of this paper is to identify key parameters to test performance, tools that are being used and provide information on results from previous studies.

97 MATHEMATICS AND COMPUTING↗

Verification of an altitude decompression sickness prevention protocol for Shuttle operations utilizing a 10.s psi pressure stage

Three test series involving 173-man tess were conducted to define and verify a pre-extravehicular activity (EVA) denitrogenation procedure that would provide acceptable protection against altitude decompression sickness while minimizing the required duration of oxygen (O2) prebreathe in the suit prior to EVA. The tests also addressed the safety, in terms of incidence of decompression sickness, of conducting EVA's on consecutive days rather than on alternate days. The tests were conducted in an altitude chamber, subjects were selected as representative of the astronaut population, and EVA periods were simulated by reducing the chamber pressure to suit pressure while the subjects breathed O2 with masks and worked at EVA representative work rates. A higher than anticipated incidence of both venous bubbles (55%) and symptoms (26%) was measured following all denitrogenation protocols in this test. For the most part, symptoms were very minor and stabilized, diminished, or disappeared in the six-hour tests. Instances of clear, possible, or potential systemic symptoms were encountered only after use of the unmodified 10.2 psi protocol and not after the modified 10.2 psi protocol, the 3.5-hour O2 prebreathed protocol, or the 4.0-hour O2 prebreathe protocol. The high incidence of symptoms is ascribed to the type and duration of exercise and the sensitivity of the reporting technique to minor symptoms. Repeated EVA exposures after only 17 hours did not increase symptom or bubble incidence.

Waligora, J. M.↗