Acquisition and Development of Selected Cost Data for Saline Storage and Enhanced Oil Recovery (EOR)

This report presents cost data and recommends cost estimation methods for costs associated with CO 2 injection and surface facility management, including well equipment, onsite booster compression. Where water is produced for pressure management in saline aquifers, costs for water production, water injection, and associated surface treatment and wellhead equipment (along with associated piping and facilities) is provided. Comparable cost estimation recommendations are provided for CO 2 -EOR operations, including the costs associated with oil and water management and production, and CO 2 recycling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Life Cycle Cost Analysis of Shuttle-Derived Launch Vehicles, Volume 1

The design, performance, and programmatic definition of shuttle derived launch vehicles (SDLV) established by two different contractors were assessed and the relative life cycle costs of space transportation systems using the shuttle alone were compared with costs for a mix of shuttles and SDLV's. The ground rules and assumptions used in the evaluation are summarized and the work breakdown structure is included. Approaches used in deriving SDLV costs, including calibration factors and historical data are described. Both SDLV cost estimates and SDLV/STS cost comparisons are summarized. Standard formats are used to report comprehensive SDLV life cycle estimates. Hardware cost estimates (below subsystem level) obtained using the RCA PRICE 84 cost model are included along with other supporting data.

Source record↗

Estimation of abatement potentials and costs of air pollution emissions in China

Understanding the air pollution emission abatement potential and associated control cost is a prerequisite to design cost ef?cient control policies. In this study, a linear programming algorithm model, International Control Cost Estimate Tool, was updated with cost data for applications of 56 types of end-of-pipe technologies and ?ve types of renewable energy in 10 major sectors namely power generation, industry combustion, cement pro-duction, iron and steel production, other industry processes, domestic combustion, transportation, solvent use, livestock rearing, and fertilizer use. The updated model was implemented to estimate the abatement potential and marginal cost of multiple pollutants in China. The total maximum abatement potentials of sulfur dioxide (SO2), nitrogen oxides (NOx), primary particulate matter (PM2.5), non-volatile organic compounds (NMVOCs), and ammonia (NH3) in China were estimated to be 19.2, 20.8, 9.1, 17.2 and 8.6 Mt, respectively, which accounted for 89.7%, 89.9%, 94.6%, 74.0%, and 80.2% of their total emissions in 2014, respectively. The associated control cost of such reductions was estimated as 92.5, 469.7, 75.7, 449.0, and 361.8 billion CNY in SO2, NOx, primary PM2.5, NMVOCs and NH3, respectively. Shandong, Jiangsu, Henan, Zhejiang, and Guangdong provinces exhibited large abatement potentials for all pollutants. Provincial disparity analysis shows that high GDP regions tend to have higher reduction potential and total abatement costs. End-of-pipe technologies tended be a cost-ef?cient way to control pollution in industries processes (i.e., cement plants, iron and steel plants, lime production, building ceramic production, glass and brick production), whereas such technologies were less cost- effective in fossil fuel-related sectors (i.e., power plants, industry combustion, domestic combustion, and transportation) compared with renewable energy. The abatement potentials and marginal abatement cost curves developed in this study can further be used as a crucial component in an integrated model to design optimized cost-ef?cient control policies.

Zhang, Fenfen↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost analysis of atmosphere monitoring systems

A methodology was developed to predict realistic relative cost of life support systems and to define areas of major cost impacts in the development cycle. Emphasis was given to tailoring the cost data for usage by program planners and designers. Cost estimates can be completed using the developed equations for varying degrees of equipment refinement, as well as comparative costs between different functional methods. Cost analysis of two leading atmosphere monitoring systems, namely the mass spectrometer and the gas chromatograph, is discussed. A summary of the approach used in developing the cost estimating techniques is presented. Included are the cost estimating techniques, the development of cost estimating relationships, and the atmosphere monitoring system cost estimates.

Yakut, M. M.↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost analysis of life sciences experiments and subsystems

Cost estimates for experiments and subsystems flown in the Spacelab were established. Ten experiments were cost analyzed. Estimated cost varied from $650,000 for the hardware development of the SPE water electrolysis experiment to $78,500,000 for the development and operation of a representative life sciences laboratory program. The cost of subsystems for thermal, atmospheric and trace contaminants control of the Spacelab internal atmosphere was also estimated. Subsystem cost estimates were based on the utilization of existing components developed in previous space programs whenever necessary.

Yakut, M. M.↗

Lessons learned from implementation of International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 17198

The paper presents the experience accumulated at the company DECOM in Slovakia in implementation of the 'International Structure for Decommissioning Costing (ISDC) of Nuclear Installations' in cost estimation for decommissioning projects. The ISDC was issues in 2012 by main international organisation involved in decommissioning - OECD/NEA, IAEA and European Commission. The primary purpose of the ISDC, as highlighted by the issuing organisation, is to promote the transparency and understanding of cost for decommissioning projects by presenting the cost using the standardised ISDC cost format. General experience shows that the ISDC seems to be the only cost structure which is able to present cost for any decommissioning project after converting the cost into the ISDC cost format. The company DECOM started to implement the ISDC already in 1999 by implementing the predecessor of the ISDC known as 'Yellow Book' which was issues in 1999 by the same international organisations; later by implementing the ISDC. Experience of DECOM by implementing the Yellow Book was used also in developing the ISDC. Experience of DECOM relates to the use of the ISDC as the base for cost estimation structures, developing the ISDC-based cost estimations codes and to transformation of cost for decommissioning projects for benchmarking purposes. The ISDC approach to decommissioning cost estimation for research reactors was implemented also by the IAEA; the experience accumulated at DECOM was used to a great extent. The paper presents the DECOM experience mainly in developing the ISDC-based cost estimation structures used in ISDC costing codes and in ISDC benchmarking of cost for decommissioning projects. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Standard cost elements for technology programs

The suitable structure for an effective and accurate cost estimate for general purposes is discussed in the context of a NASA technology program. Cost elements are defined for research, management, and facility-construction portions of technology programs. Attention is given to the mechanisms for insuring the viability of spending programs, and the need for program managers is established for effecting timely fund disbursement. Formal, structures, and intuitive techniques are discussed for cost-estimate development, and cost-estimate defensibility can be improved with increased documentation. NASA policies for cash management are examined to demonstrate the importance of the ability to obligate funds and the ability to cost contracted funds. The NASA approach to consistent cost justification is set forth with a list of standard cost-element definitions. The cost elements reflect the three primary concerns of cost estimates: the identification of major assumptions, the specification of secondary analytic assumptions, and the status of program factors.

Christensen, Carisa B.↗

Preliminary estimates of operating costs for lighter than air transports

Presented is a preliminary set of operating cost relationships for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Preliminary estimates of operating costs for lighter than air transports

A preliminary set of operating cost relationships are presented for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

Remer, Donald S.↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

The MERMAID project

The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

Cowderoy, A. J. C.↗

An Integrated Supercritical System for Efficient Produced Water Treatment and Power Generation

The main goal of this project was to evaluate the feasibility of an integrated supercritical (SC) water desalination and power generation system for treatment of produced waters from CO 2 sequestration, oil production, and coal-bed methane recovery. This system may offer a transformative approach to generating power from coal or natural gas (NG) and purifying saline water or produced water with high total dissolved solids (TDS) in a zero-liquid discharge plant. The closed-loop steam cycle of conventional power plants was replaced with an open-loop steam cycle that heated the pretreated produced water above the SC point of water (374 °C and 221 bar) to precipitate and separate the salts dissolved in the water. After separation of the precipitated salt, the SC steam required further treatment to reduce the salt content from ~100 mg/L (ppm) to <1 ppm to make it suitable for use in turbines for power generation. A SC membrane distillation unit was used to polish the SC steam, which could be sent through a series of turbines for power generation, and the steam exiting the low-pressure turbine could be condensed by cooling water to produce pure water. Project tasks included a process simulation and a techno-economic evaluation of the integrated system; design and assembly of SC salt precipitation and membrane distillation systems; development and characterization of advanced carbon membranes for SC membrane distillation; and pretreatment, desalination, and purification of different produced water samples with salt concentrations of 30,000–200,000 ppm to a high-purity (<1 ppm) level. Process simulations were performed for 550 MW SC coal-fired or NG baseline cases and various scenarios for the proposed integrated SC system using produced water as the water source and coal or NG as the fuel source. Simulation results indicated that the net plant efficiency loss of the proposed SC cogeneration process would be in the range of <1% to ~4%, in which NG and lower TDS produced water cases would have higher efficiencies. The proposed process for coal-fired cases could provide all water needs for the power generation process and generate additional pure water for beneficial use. A techno-economic analysis was performed to estimate the cost of produced water treatment (dollars /kgal of treated water) by conventional treatment processes compared with the proposed cogeneration process. The cost estimation for the proposed cogeneration system included the cost of pretreatment, the cost of power loss to integrate the water desalination process into the power generation system, and the cost of plant modification or retrofitting. The cost of produced water treatment was calculated by assuming three different scenarios in which converting a baseline power plant to the proposed cogeneration plant would increase the cost of the boiler and feed water system by 10%, 50%, and 100%. Results indicated that the cost of produced water treatment, even with a 100% cost increase, was in the range of $8.6–11.6 dollars per kgal, which is about half of the treatment cost by conventional methods. The cost of produced water treatment by the proposed cogeneration system could be further reduced or a considerable income could be generated if the values of saltwater and freshwater products are considered. Overall, the techno-economic analysis results indicated that the proposed integrated SC system could potentially treat produced water at a cost significantly lower than the cost of produced water treatment by conventional technologies. To evaluate the feasibility of the proposed treatment system at a laboratory scale, a SC salt precipitation and membrane distillation system was designed and fabricated to treat a simulated brine or pretreated produced water by precipitating salts and further polishing the SC steam containing ~100 ppm salts to a high-purity steam. Through baseline tests with NaCl solutions, with concentrations ranging from 30,000 to 200,000 ppm, it was demonstrated that concentrated feed solutions could be treated by precipitating salt at SC conditions to a TDS level of 130 ppm. Produced water samples were collected from a potential CO 2 sequestration site, a coal-bed methane site, and an oilfield in Illinois. Representative samples were characterized for various water quality parameters, including pH; turbidity; conductivity; and concentrations of selected anions, cations, alkalinity, dissolved organic carbon, total suspended solids, TDS, and total petroleum hydrocarbons. The produced water samples were first treated by conventional pretreatment methods to remove residual oil, dissolved organic matter, and scale-forming species. Pretreatment methods included coagulation, sedimentation, filtration, activated carbon adsorption, and ion-exchange adsorption. Pretreated produced waters were treated at SC conditions in which salts were precipitated. Analysis of treated samples revealed that the concentration of Na (the main cation) in produced waters was reduced dramatically from 14,000–47,400 ppm in the feed to 21–80 ppm in treated waters. Concentrations of other main cations (Ca, Mg, Sr, K) also decreased significantly from initial values of ~1,000–22,000 ppm to ~1 ppm or less. However, a significant increase in the concentrations of Fe, Ni, Cu, and Co was observed, mainly caused by leaching of these elements from the system (vessels, filters, tubing), which is manufactured from alloys containing Fe, Ni, Cu, and Co. To polish the SC steam containing a salt content of ~100 ppm to a high-purity level of <1 ppm, a SC membrane distillation treatment using carbon membranes was employed. Different types of self-standing or supported carbon membranes were developed from graphite, graphene, carbon nanotubes, carbon nanofibers, and pyrolytic carbon. Screening tests revealed that only a limited number of developed carbon membranes were suitable for the purification of steam at SC conditions. Membranes that were either fragile and lacked mechanical strength or had large pores and showed limited salt rejection (<20%) were found to be unsuitable for the purification of SC steam. Promising carbon membranes that were successfully tested for purifying SC steam included two graphite membranes (i.e., AF-5, a porous graphite material, and FGS, a flexible graphite sheet) and a carbon nanotube membrane grown on a Hastelloy substrate and then further modified using a proprietary method (i.e., membrane C). The AF-5 membrane exhibited a stable water flux of ~50 kg/m 2 ∙h and ~40% salt rejection. The FGS membrane had a high salt rejection of 95%–98% but a lower water flux of ~15 kg/m 2 ∙h. Membrane C showed an extremely high flux of 200-800 kg/m 2 ∙h, which is one order of magnitude higher than the water flux of conventional membranes. Membrane C also exhibited 87%–93% salt rejection. Overall, a two-stage or multistage polishing treatment by these membranes could lower the salt content of the SC steam from initial values of ~100–200 ppm to the steam quality of <1 ppm or to parts per billion levels required for the power cycle.

20 FOSSIL-FUELED POWER PLANTS↗

Orbit transfer vehicle engine study. Volume 3: Program costs

Budgetary and planning cost estimates are presented that were prepared for the development, production and operation and flight support phases for each of the engines proposed for OTV propulsion. The major features of each category engine are described. The development program estimates were structured to the preliminary program Work Breakdown Structures (WBS). Program costs are provided within the applicable WBS elements to Level 4 for each category engine. The production program cost estimates assume a first production lot of 50 units produced at a rate of two units per month. Cumulative average unit costs assume a 90% learning capability. The operations and flight support cost estimates are based on 15, 30 and 45 missions per year for the period 1988 through 1999. Estimated funding requirements were developed for each category and program phase. All cost estimates and funding data are presented in 1979 dollars. The assumptions and ground rules for these estimates are summarized.