Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Air Traffic Management Response to Vertiport Closure

Increasing quantities of urban air mobility operations requires consideration of various contingencies associated with novel operational tempos and airspace management practices. This paper explores a contingency scenario in which a single vertiport closes unexpectedly during high tempo operations. Dynamic re-planning is explored as a function performed both by operators using common operating procedures and through emergency assistance from air traffic control. Implications for airspace capacity, infrastructure requirements, and vehicle energy reserves are discussed.

UAM↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Geometric reasoning

Cognitive robot systems are ones in which sensing and representation occur, from which task plans and tactics are determined. Such a robot system accomplishes a task after being told what to do, but determines for itself how to do it. Cognition is required when the work environment is uncontrolled, when contingencies are prevalent, or when task complexity is large; it is useful in any robotic mission. A number of distinguishing features can be associated with cognitive robotics, and one emphasized here is the role of artificial intelligence in knowledge representation and in planning. While space telerobotics may elude some of the problems driving cognitive robotics, it shares many of the same demands, and it can be assumed that capabilities developed for cognitive robotics can be employed advantageously for telerobotics in general. The top level problem is task planning, and it is appropriate to introduce a hierarchical view of control. Presented with certain mission objectives, the system must generate plans (typically) at the strategic, tactical, and reflexive levels. The structure by which knowledge is used to construct and update these plans endows the system with its cognitive attributes, and with the ability to deal with contingencies, changes, unknowns, and so on. Issues of representation and reasoning which are absolutely fundamental to robot manipulation, decisions based upon geometry, are discussed here, not AI task planning per se.

Woodbury, R. F.↗

Performance Impacts to the NASA Artemis II Trajectory Correction Burn Placement

As NASA embarks to return humans to the lunar vicinity with the upcoming Artemis II mission, the selected free return trajectory taking the crew to the Moon in the Orion spacecraft is impacted by the execution of small trajectory correction burns to ensure the spacecraft stays on course for a successful return to Earth. The placement of these nominally zero translational maneuvers must account for the crew schedule, navigation tracking constraints, spacecraft venting, thermal and communication requirements, and a host of other programmatic factors. Understanding the influence the placement of these periodic burn corrections have on the integrated GN\&C performance can provide valuable insight to mission controllers and trajectory planning processes to untangle the complex trade space considered for both baseline and contingency scenarios. This sensitivity information can also be utilized to facilitate the optimized placement of these burns. This paper utilizes several techniques to systematically generate the performance impacts to the NASA Artemis II trajectory correction burn placement and demonstrate how to derive optimized locations that make the system robust to crew activity, maneuver execution errors, navigation uncertainty, orbit insertion errors, disturbance accelerations, and other system limitations.

GN&C↗

Contingency contractor optimization. Phase 2, architecture document

This report provides documentation of the overarching architecture for the Strategic Contractor Planning Tool and framework. The report describes the system organization, high-level system structure, and interfaces. Various architectural views provide descriptions of the planning tool architecture, information flow, and functionality. The information flow serves to tie together the architecture, analytic framework and existing capabilities. This report highlights the potential integration points for the planning tool within the existing OSD and DoD strategic planning activities. Many existing tools, policies, and information can be leveraged as inputs to this planning tool, including strategic planning information, personnel, and cost resources. These resources are listed and discussed. A high-level description of the planning tool functionality and usage are also described.

Miner, Nadine E.↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning and management of science programs on Skylab

Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

Parker, R. A. R.↗

The impact of plant‐derived fire management prescriptions on fire‐responsive bird species

Abstract In fire‐prone regions, the occurrence of some faunal species is contingent on the presence of resources that arise through post‐fire plant succession. Through planned burning, managers can alter resource availability and aim to provide the conditions required to promote biodiversity. Understanding how species occurrence changes at different spatial and temporal scales after fire is essential to achieve this goal. However, many fire prescriptions are guided primarily by the responses of fire‐sensitive plants when setting tolerable fire intervals. This approach assumes that maintaining floristic diversity will satisfy the requirements of fauna. We surveyed bird species in two semi‐arid vegetation types across an environmental gradient in south‐eastern Australia. We conducted four surveys at each of 253 sites across a 75‐year chronosequence of time since fire and used generalized additive mixed models to examine changes in the occurrence of birds in response to time since fire. Model predictions were compared to plant‐derived fire prescriptions currently guiding fire management in the region. Time since fire was a significant predictor for 18 of 28 species modeled, in at least one vegetation type, over a gradient of 1.3° of latitude. We detected considerable variation in the responses of some species, both between vegetation types and geographically within a vegetation type. Our evaluation of plant‐derived fire prescriptions suggests that the intervals considered acceptable for maintaining floristic diversity may not be sustainable for populations of birds requiring longer unburnt vegetation, with 6 of the 12 species assessed attaining a mean occurrence probability of 20.3% by the minimum tolerable fire interval, and 57.3% by the maximum tolerable fire interval, in their respective vegetation types. Our findings highlight the potential vulnerability of fire‐responsive bird species if fire prescriptions are applied in a manner that fails to account for the slow development of habitat resources needed by some species, and the variation detected within the responses of species. This highlights the need for species‐specific data collected at an appropriate spatial scale to inform management plans.

Makdissi, Rhys↗

Development of Integrated Die Casting Process for Large Thin-Wall Magnesium Applications

The purpose of this project was to develop a process and product which would utilize magnesium die casting and result in energy savings when compared to the baseline steel product. The specific product chosen was a side door inner panel for a mid-size car. The scope of the project included: re-design of major structural parts of the door, design and build of the tooling required to make the parts, making of parts, assembly of doors, and testing (both physical and simulation) of doors. Additional work was done on alloy development, vacuum die casting, and overcasting, all in order to improve the performance of the doors and reduce cost. The project achieved the following objectives: 1. Demonstrated ability to design a large thin-wall magnesium die casting. 2. Demonstrated ability to manufacture a large thin-wall magnesium die casting in AM60 alloy. 3. Tested via simulations and/or physical tests the mechanical behavior and corrosion behavior of magnesium die castings and/or lightweight experimental automotive side doors which incorporate a large, thin-wall, powder coated, magnesium die casting. Under some load cases, the results revealed cracking of the casting, which can be addressed with re-design and better material models for CAE analysis. No corrosion of the magnesium panel was observed. 4. Using life cycle analysis models, compared the energy consumption and global warming potential of the lightweight door with those of a conventional steel door, both during manufacture and in service. Compared to a steel door, the lightweight door requires more energy to manufacture but less energy during operation (i.e., fuel consumption when driving vehicle). Similarly, compared to a steel door, the lightweight door has higher global warming potential (GWP) during manufacture, but lower GWP during operation. 5. Compared the conventional magnesium die casting process with the “super-vacuum” die casting process. Results achieved with cast tensile bars suggest some improvement in tensile properties with vacuum casting. Plant trials with large castings revealed cavity fill issues attributed to cooling and partial solidification of metal in the shot sleeve while waiting for vacuum to be established in the die cavity. 6. Developed age-hardenable Mg-based alloys as potential alternatives to the AM60 and AZ91 alloys typically used in automotive applications. Mg-7%Al-based alloys having Sn or Sn+Si additions exhibited significant age hardening, but more work is needed to demonstrate significant improvement in tensile properties. Corrosion behavior of these alloys is between those of AM60 and AZ91 alloys. 7. Evaluated the die casting of magnesium directly onto either steel or aluminum tubes as a potential process to make large lightweight subassemblies. Samples were free of gross defects, but additional work is needed to increase the interfacial shear strength. Overall, the project demonstrated that an automotive door-in-white design incorporating a die cast magnesium inner panel and a stamped aluminum outer panel can achieve approximately 50% mass reduction compared to the stamped steel baseline door-in-white. This leads to reduced energy consumption when driving the vehicle, which should more than offset the increased embedded energy of manufacture associated with the lighter metals. However, additional design work would be needed in order to meet the mechanical performance required of a door. Development of high-strength, high-ductility magnesium alloy castings would help make this technology more attractive for potential use in the side doors on automobiles. Also, increased use of recycled magnesium and aluminum would reduce the embedded energy and greenhouse gas emissions associated with the manufacture of this type of lightweight door. Commercialization planning of the type of lightweight door technology addressed in this project would be contingent upon the doors meeting all technical performance requirements of the car maker. The specific lightweight door developed in this project didn’t meet some of those requirements, but a preliminary business case study was conducted anyhow. This study considered the ratio of cost increase to mass decrease when the lightweight door is compared to a baseline steel door. The ratio was found to be in an acceptable range for some vehicle programs, especially if the number of such vehicles to be produced is equal to or slightly less than the estimated 250,000-shot life of the die set. This would allow for the investment in the dies to be spread across many parts and thereby help minimize the cost increase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Apollo Soyuz mission planning and operations

The paper describes the Apollo Soyuz project from the points of view of working group organization, mission plan definition, joint operations concept, and mission preparation. The concept for joint operations considered contingency situations as well as nominal operations. Preparations for the joint flight included cooperative tracking tests and combined training of the flight crews and mission control personnel.

Frank, M. P., III↗

Designing a Flight Test of a Flight Path Management System for Advanced Air Mobility Research

The National Aeronautics and Space Administration (NASA) has completed a flight test to evaluate the performance of an onboard prototype automation system operating in future high density urban airspace. The test was part of a research investigation of the Urban Air Mobility (UAM) concept, with a focus on a future environment having hundreds of simultaneous operations over a metropolitan area. The complexity of this future UAM airspace may require automation capable of replanning an aircraft’s path in the presence of traffic and other changing constraints. A live-virtual-constructive (LVC) approach was used to conduct the test. Prototype automation technology was integrated into one of the two live aircraft, which were combined with virtual traffic to create a mixed reality environment at the target airspace density. In-flight evaluation enabled verification of the automation’s functions and discovery of any unexpected behaviors resulting from its operation in an actual flight environment. The in-flight evaluation also provided data for validation of air traffic simulations. This paper discusses the design, methodology, and challenges overcome to conduct a successful flight test. Remaining challenges, future work, and recommendations to improve the flight test capability are also discussed.

Advanced Air Mobility↗

A Generic Advanced Computing Framework for Executing Windows-based Dynamic Contingency Analysis Tool in Parallel on Cluster Machines

Dynamic contingency analysis tool (DCAT) has been developed to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. By including more customized protection models and corrective actions into the Windows-based commercial tools, DCAT can help operators understand the cascading behavior and find mitigation approaches to reduce the risk of cascading outages in a more realistic manner. In order to further enhance the capability of DCAT, this paper presents a design of an advanced computing framework that enables DCAT to run on a cluster machine to improve its computational performance. This framework is generic and can be applied to other Windows-based simulation tools to fill the technical gap of applying advanced computing technology to vendors' Windows-based tools. The preliminary tests using medium to large power systems have shown the effectiveness of this framework and its potential for accelerating the adoption of advanced computing in utilities.

Advanced computing, dynamic contingency analysis, ↗

The Effect of Power Electronic Loads on Western Interconnection Stability

The prevalence of power electronics in the bulk power system is increasing rapidly in both the generation and consumption of electricity. This work focuses on the effect of changing load composition - specifically the transition from single phase air conditioner motors to power electronics backed air conditioners - on power system stability. Various transmission and generation contingency events for the Western Interconnection were simulated using Positive Sequence Load Flow software and planning models from the Western Electricity Coordinating Council. In general, an increased proportion of power electronic load leads to more instability. For some specific faults resulting in fault-induced delayed voltage recovery, transitioning to higher proportions of power electronic loads helps expedite system recovery. These results demonstrate that load composition should be examined in conjunction with generation composition when evaluating system stability.

FIDVR↗

Lakeview, Oregon, Disposal Site

9.1 Compliance Summary The Lakeview, Oregon, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected September 16 and 17, 2015. Other than some ongoing concern with erosion-control rock riprap degradation, the disposal cell was in good condition. Some minor fence repairs and vegetation removal, and minor erosion repair work along the west site fence is planned. Inspectors identified no other maintenance needs or cause for a follow-up or contingency inspection. Disposal cell riprap is evaluated annually to ensure continued long-term protection of the cell from erosion during a severe precipitation event. Degradation of the rock riprap was first observed at the site in the mid-1990s. Rock gradation monitoring of the riprap on the west side slope has been performed as part of the annual inspection since 1997 to determine the mean diameter (D 50 ) value. As prescribed by the monitoring procedure, the rock monitoring is routinely conducted at random locations. However, at the U.S. Nuclear Regulatory Commission’s (NRC’s) request, the 2015 rock monitoring approach deviated from the normal procedure by using a pre-established monitoring grid in a subset area of the west side slope. This changed the monitoring approach from random sampling to biased sampling. The D 50 value measured during the 2015 gradation monitoring is 2.39 inches, which falls below the original D 50 design size range of 2.7–3.9 inches for the Type B size side slope riprap. At NRC’s request, rock durability monitoring was added to the gradation monitoring in 2009 to monitor durability by rock type. Results of the 2015 durability monitoring showed that74 percent of the total rock sampled is durability class code A rock with an assigned durability class of “highly durable” or durability class code B “durable” rock, and that over 90 percent of the 3-inch or larger rock is durability class code A or B. The rock durability classifications are further explained in Section 9.4.2.2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Iterative Approach for Solving the SCOPF Problem Applying LP, SOCP, and NLP Subproblems

We propose to develop efficient algorithms and software for the SCOPF problem. We will employ an iterative approach that will: a) use linear subproblems and other active set filtering techniques to identify the most important contingencies and drastically reduce the SCOPF model size; b) solve SOCP relaxations of the reduced SCOPF to converge to the neighborhood of the global optimal solution and establish a lower bound on the solution, and; c) use a non-convex, nonlinear interior-point solver, Artelys Knitro, to converge quickly to the optimal solution. To identify the most effective approach, we will experiment with several techniques to identify the tradeoffs between contingency subproblem complexity and fast solvability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

International Space Station Attitude Motion Associated With Flywheel Energy Storage

Flywheels can exert torque that alters the Station's attitude motion, either intentionally or unintentionally. A design is presented for a once planned experiment to contribute torque for Station attitude control, while storing or discharging energy. Two contingencies are studied: the abrupt stop of one rotor while another rotor continues to spin at high speed, and energy storage performed with one rotor instead of a counter rotating pair. Finally, the possible advantages to attitude control offered by a system of ninety-six flywheels are discussed.

Roithmayr, Carlos M.↗

HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗