Search NASA⌕ Search

SEARCH · Search NASA

Results for “Load Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

In-Situ Measurement of Power Loss for Crystalline Silicon Modules Undergoing Thermal Cycling and Mechanical Loading Stress Testing

An in-situ method is proposed for monitoring and estimating the power degradation of mc-Si photovoltaic (PV) modules undergoing thermo-mechanical degradation tests that primarily manifest through cell cracking, such as mechanical load tests, thermal cycling and humidity freeze tests. The method is based on in-situ measurement of the module’s dark current-voltage (I-V) characteristic curve during the stress test, as well as initial and final module flash testing on a Sun simulator. The method uses superposition of the dark I-V curve with final flash test module short-circuit current to account for shunt and junction recombination losses, as well as series resistance estimation from the in-situ measured dark I-Vs and final flash test measurements. The method is developed based on mc-Si standard modules undergoing several stages of thermo-mechanical stress testing and degradation, for which we investigate the impact of the degradation on the modules light I-V curve parameters, and equivalent solar cell model parameters. Experimental validation of the method on the modules tested shows good agreement between the in-situ estimated power degradation and the flash test measured power loss of the modules, of up to 4.31 % error (RMSE), as the modules experience primarily junction defect recombination and increased series resistance losses. However, the application of the method will be limited for modules experiencing extensive photo-current degradation or delamination, which are not well reflected in the dark I-V characteristic of the PV module.

14 SOLAR ENERGY↗

Second gadolinium loading to Super-Kamiokande

The first loading of gadolinium (Gd) into Super-Kamiokande in 2020 was successful, and the neutron capture efficiency on Gd reached 50%. To further increase the Gd neutron capture efficiency to 75%, 26.1 tons of Gd 2 (SO 4 ) 3 ∙ 8H 2 O was additionally loaded into Super-Kamiokande (SK) from May 31 to July 4, 2022. As the amount of loaded Gd 2 (SO 4 ) 3 ∙ 8H 2 O was doubled compared to the first loading, the capacity of the powder dissolving system was doubled. We also developed new batches of gadolinium sulfate with even further reduced radioactive impurities. In addition, a more efficient screening method was devised and implemented to evaluate these new batches of Gd 2 (SO 4 ) 3 ∙ 8H 2 O. Following the second loading, the Gd concentration in SK was measured to be 333.5 ± 2.5 ppm via an Atomic Absorption Spectrometer (AAS). From the mean neutron capture time constant of neutrons from an Am/Be calibration source, the Gd concentration was independently measured to be 332.7 ± 6.8(sys.) ± 1.1(stat.) ppm, consistent with the AAS result. Furthermore, during the loading the Gd concentration was monitored continually using the capture time constant of each spallation neutron produced by cosmic-ray muons, and the final neutron capture efficiency was shown to become 1.5 times higher than that of the first loaded phase, as expected.

Gadolinium↗

Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil dissipated in the liquid: < 2 mg/l; overall gamma-activity: < 3,7 x10{sup 5} Bq/l. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model-Based Dead Time Optimization for Voltage-Source Converters Utilizing Silicon Carbide Semiconductors

Dead time significantly affects the reliability, power quality, and efficiency of voltage-source converters. For silicon carbide (SiC) devices, considering the high sensitivity of turn-off time to the operating conditions (> 5× difference between light load and full load) and characteristics of inductive loads (> 2× difference between motor load and inductor), as well as large additional energy loss induced by the freewheeling diode conduction during the superfluous dead time (~15% of the switching loss), then the traditional fixed dead time setting becomes inappropriate. This paper introduces an approach to adaptively regulate the dead time considering the current operating condition and load characteristics via synthesizing online monitored turn-off switching parameters in the microcontroller with an embedded preset optimization model. Here, based on a buck converter built with 1200-V SiC MOSFETs, the experimental results show that the proposed method is able to ensure reliability and reduce power loss by 12% at full load and 18.2% at light load (8% of the full load in this case study).

30 DIRECT ENERGY CONVERSION↗

Demand Response Spinning Reserve Demonstration -- Phase 2 Findings from the Summer of 2008

The Demand Response Spinning Reserve project is a pioneering demonstration showing that existing utility load-management assets can provide an important electricity system reliability resource known as spinning reserve. Using aggregated demand-side resources to provide spinning reserve as demonstrated in this project will give grid operators at the California Independent System Operator (CA ISO) and Southern California Edison (SCE) a powerful new tool to improve reliability, prevent rolling blackouts, and lower grid operating costs.In the first phase of this demonstration project, we target marketed SCE?s air-conditioning (AC) load-cycling program, called the Summer Discount Plan (SDP), to customers on a single SCE distribution feederand developed an external website with real-time telemetry for the aggregated loads on this feeder and conducted a large number of short-duration curtailments of participating customers? air-conditioning units to simulate provision of spinning reserve. In this second phase of the demonstration project, we explored four major elements that would be critical for this demonstration to make the transition to a commercial activity:1. We conducted load curtailments within four geographically distinct feeders to determine the transferability of target marketing approaches and better understand the performance of SCE?s load management dispatch system as well as variations in the AC use of SCE?s participating customers;2. We deployed specialized, near-real-time AC monitoring devices to improve our understanding of the aggregated load curtailments we observe on the feeders;3. We integrated information provided by the AC monitoring devices with information from SCE?s load management dispatch system to measure the time required for each step in the curtailment process; and4. We established connectivity with the CA ISO to explore the steps involved in responding to CA ISO-initiated requests for dispatch of spinning reserve.The major findings from the second phase of this demonstration are:1. Demand-response resources can provide full response significantly faster than required by NERC and WECC reliability rules.2. The aggregate impact of demand response from many small, individual sources can be estimated with varying degrees of reliability through analysis of distribution feeder loads.3. Monitoring individual AC units helps to evaluate the efficacy of the SCE load management dispatch system and better understand AC energy use by participating customers.4. Monitoring individual AC units provides an independent data source to corroborate the estimates of the magnitude of aggregate load curtailments and gives insight into results from estimation methods that rely solely on distribution feeder data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Instrumentation Needs of Inflatable Space Structures

NASA and industry are developing inflatable, crewed space structures for large-scale habitats for in-space and surface missions. Space certified inflatables are composed of high strength fabrics that carry the structural loads from internal pressure and replace traditional metallic primary structure. Inflatables can be packed for launch, fit inside a small launch shroud, and expand in orbit to create a large habitable volume for the crew. For safe operation of inflatable habitats, structural health monitoring (SHM) techniques are required to monitor and evaluate the structural loads in both ground and flight tests. Because of the nature of fabric structures, SHM techniques need to be soft, flexible, and be able to interface with softgoods. Litteken's presentation will introduce inflatable structures, their design, and their planned use for future NASA missions. He will discuss SHM needs for inflatables and their specific requirements for implementation with flight hardware.

Litteken, Doug↗

Plug Load Management System Field Study

In 2018, NREL performed a demonstration of the IBIS InteliNetwork(TM) plug load management system, which includes: intelligent socket devices, which plug into existing electrical outlets and collect energy usage information; a gateway, which manages communication between the intelligent sockets and the PLM cloud service; and a PLM network, which is a cloud-based measurement and control network for the entire system. Two retail stores served as the field study sites. The PLM system was found to be effective at reducing plug load energy use, with a projected annual plug load reduction of 11% and 18% at the test locations. Retail staff reported that the hardware was easy to use, but no one used the online data management system, intended to analyze and control the hardware. This PLM solution shows promise as an effective means to monitor, control, and reduce plug load energy use, but the economics of the system need to be improved.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

On-orbit damage detection and health monitoring of large space trusses: Status and critical issues

The long lifetimes, delicate nature and stringent pointing requirements of large space structures such as Space Station Freedom and geostationary Earth sciences platforms might require that these spacecraft be monitored periodically for possible damage to the load carrying structures. A review of the literature in damage detection and health monitoring of such structures is presented, along with a candidate structure to be used as a testbed for future work in this field. A unified notation and terminology is also proposed to facilitate comparisons between candidate methods.

Kashangaki, Thomas A. L.↗

Linear Induction Accelerator Cell Voltage Calibration Using Compact Electron Permanent Magnet Spectrometer

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility provides flash radiography capabilities using electron Linear Induction Accelerators (LIA’s). The strict requirements for flash radiography require a detailed understanding of the LIA’s performance, including precision measurements of the electron beam energy. Axis-1 of DARHT produces a 20 MeV, 2 kA, 80-ns-FWHM electron beam. Electronic measurement with cell-voltage monitors which consists of a 75 ohm load resistor and a current viewing resistor (CVR) that are coupled together and injector capacitive monitors (EVACSUM) are summed to give the total beam energy at the output of the accelerator. Calibration of these monitors was last done in 1999 and is needed. Using the Compact electron Permanent Magnet Spectrometer (CePMSpec), we have developed a technique for measuring and adjusting the calibration of the accelerator cell load resistor/CVR by using the total energy of the beam. Each pair of cells is driven by pulsed power Blumleins, and each Blumlein is charged by a Blumlein Charge Unit (BCU). There are 64 cells and 32 Blumleins and BCUs. This technique is applied to all 32 BCUs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Tonopah Test Range Air Monitoring: CY2018 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.

54 ENVIRONMENTAL SCIENCES↗

Acoustic emission monitoring for assessment of steel bridge details

Acoustic emission (AE) testing was deployed on details of two large steel Interstate Highway bridges: one cantilever through-truss and one trapezoidal box girder bridge. Quantitative measurements of activity levels at known and suspected crack locations were made by monitoring AE under normal service loads (e.g., live traffic and wind). AE indications were used to direct application of radiography, resulting in identification of a previously unknown flaw, and to inform selection of a retrofit detail.

42 ENGINEERING↗

Virologic outcome among patients receiving antiretroviral therapy at five hospitals in Haiti

Introduction Viral load (VL) assessment is the preferred method for diagnosing and confirming virologic failure for patients on antiretroviral therapy (ART). We conducted a retrospective cross-sectional study to evaluate the virologic suppression rate among patients on ART for 6 months in five hospitals around Port-au-Prince, Haiti. Methods Plasma VL was measured and patients with VL <1,000 copies/mL were defined as virologically suppressed. A second VL test was performed within at least six months of the first test. Factors associated with virologic suppression were analyzed using logistic regression models accounting for site-level clustering using complex survey procedures. Results Data were analyzed for 2,313 patients on ART for six months or longer between July 2013 and February 2015. Among them, 1,563 (67.6%) achieved virologic suppression at the first VL test. A second VL test was performed within at least six months for 718 (31.0%) of the patients. Of the 459 patients with an initial HIV-1 RNA <1,000 copies/mL who had a second VL performed, 394 (85.8%) maintained virologic suppression. Virologic suppression was negatively associated with male gender (adjusted odds ratio [aOR]: 0.80, 95% CI: 0.74– 0.0.86), 23 to 35 months on ART (aOR:0.72[0.54–0.96]), baseline CD4 counts of 201–500 cells/mm 3 and 200 cells/mm 3 or lower (aORs: 0.77 [0.62–0.95] and 0.80 [0.66–0.98], respectively), poor adherence (aOR: 0.69 [0.59–0.81]), and TB co-infection (aOR: 0.73 [0.55–0.97]). Conclusions This study showed that over two-thirds of the patients in this evaluation achieved virologic suppression after six months on ART and the majority of them remained suppressed. These results reinforce the importance of expanding access to HIV-1 viral load testing in Haiti for monitoring ART outcomes.

59 BASIC BIOLOGICAL SCIENCES↗

An In-Depth Look at Ground Source Heat Pumps and Other Electric Loads in Two GreenMax Homes

Building America research team Consortium for Advanced Residential Buildings (CARB) partnered with WPPI Energy to answer key research questions on in-field performance of ground-source heat pumps and lighting, appliance, and miscellaneous loads (LAMELs) through extensive field monitoring at two WPPI GreenMax demonstration homes in Wisconsin. These two test home evaluations provided valuable data on the true in-field performance of various building mechanical systems and LAMELs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Illumination of Damage in Intact Rocks by Ultrasonic Transmission-Reflection and Digital Image Correlation

aboratory-scale experiments on intact rocks are critical to the development of physics-based fundamental understanding of various geophysical phenomena. In this work, the capability of ultrasonic wave transmission (T-mode) and reflection (R-mode) to monitor damage progression in uniaxially loaded prismatic intact rock specimens has been analyzed, as it is imperative to study the observations and document the capabilities of these techniques in a controlled environment. This study is novel in the sense that the R-mode linear ultrasonic testing (LUT) has been rarely employed in studying intact rock damage processes in a laboratory setting, with most of the studies utilizing a direct transmission (T-mode) approach or focusing on macroscopically fractured material. The two-dimensional digital image correlation (2-D DIC) full-field strain measurement approach was also used in-sync with the LUT monitoring to explicitly correlate the stress-induced damage in the specimens with the changes observed in the ultrasonic (T-mode and R-mode) signals. The results show that both the T-mode and R-mode LUT approaches are sensitive to detect the evolution of tensile and shear damage in the specimens, with the R-mode ultrasonic signals showing higher degree of sensitivity to the damage in the rocks, immediately following the initiation of damage in the rock volume.

58 GEOSCIENCES↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Eddy Current Method for Fatigue Testing

Flux-focusing electromagnetic sensor using a ferromagnetic flux-focusing lens simplifies inspections and increases detectability of fatigue cracks and material loss in high conductivity material. A ferrous shield isolates a high-turn pick-up coil from an excitation coil. Use of the magnetic shield produces a null voltage output across the receiving coil in presence of an unflawed sample. Redistribution of the current flow in the sample caused by the presence of flaws. eliminates the shielding condition and a large output voltage is produced, yielding a clear unambiguous flaw signal. Maximum sensor output is obtained when positioned symmetrically above the crack. By obtaining position of maximum sensor output, it is possible to track the fault and locate the area surrounding its tip. Accuracy of tip location is enhanced by two unique features of the sensor; a very high signal-to-noise ratio of the probe's output resulting in an extremely smooth signal peak across the fault, and a rapidly decaying sensor output outside a small area surrounding the crack tip enabling the search region to be clearly defined. Under low frequency operation, material thinning due to corrosion causes incomplete shielding of the pick-up coil. Low frequency output voltage of the probe is therefore a direct indicator of thickness of the test sample. Fatigue testing a conductive material is accomplished by applying load to the material, applying current to the sensor, scanning the material with the sensor, monitoring the sensor output signal, adjusting material load based on the sensor output signal of the sensor, and adjusting position of the sensor based on its output signal.

Simpson, John W.↗

Mechanical and Thermal Properties of Green Thermoplastic Elastomer Vulcanizate Nanocomposites Based on Poly (vinyl chloride) and Nitrile Butadiene Rubber Containing Organoclay and Rice Straw Natural Fibers

Green thermoplastic elastomer vulcanizates (GTPV) nanocomposites using poly (vinyl chloride) (PVC) and nitrile butadiene rubber (NBR) containing 5 wt% Cloisite 30B as an organoclay and various concentrations of rice straw natural fibers were made by melt mixing process and compression molding. The effect of used organoclay and various loadings of rice straw was monitored through using scanning electron microscopy (SEM), thermogravimetric analysis (TGA), tensile tests and rheological measurements. The morphological investigations revealed that the GTPV nanocomposites reinforced by rice straw natural fiber show a more rough fracture surfaces indicated the existence of some interactions between the natural fiber and polymer matrix. Thermal decomposition measurements revealed a higher thermal stability for GTPV nanocomposites containing higher rice straw natural fibers. The tensile test analysis suggested that there is an optimum value for the weight fraction of rice straw to enhance the Young’s modulus and tensile strength of the prepared GTPV nanocomposites up to 9 MPa and 35 MPa, respectively. The effect of rice straw loading on the Young’s modulus of the PVC/NBR/organoclay GTPV nanocomposites was predicted through using the parallel and series equations of modified Ji’s model. The results show that the theoretical model can precisely predict the variation of Young’s modulus with respect to the rice straw loading.

36 MATERIALS SCIENCE↗