Search NASA⌕ Search

SEARCH · Search NASA

Results for “PV availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Q1-2025 Solar Photovoltaic System Cost Benchmarks

The U.S. Department of Energy’s solar office and its national laboratory partners analyze cost data for U.S. solar photovoltaic systems to develop cost benchmarks to measure progress toward goals and guide research and development programs. The cost data is available in an Excel spreadsheet model that can be downloaded here.

14 SOLAR ENERGY↗

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

Intelligently Partitioned Phasor-EMT Hybrid Simulations of Large-Scale, High-IBR Power Systems

As the penetration level of power electronics-interfaced renewables such as photovoltaics (PV) and wind has surged in modern electric grids, new operational risks caused by the dynamics of those inverter-based resources (IBRs) are emerging in parallel. Lessons learned from various grid events include that the impact of IBRs on system-level grid stability will become prominent along with the increase of renewables and that the short-timescale dynamic impacts of IBRs on grid stability are not fully captured by current commercial dynamic simulation tools [1] [2]. For example, IBRs can be controlled to mitigate those destabilizing interactions, but conventional phasor-domain tools (e.g. PSS/E, PSLF) often cannot capture that; likewise, the existing electromagnetic transient (EMT) simulation tools (e.g. PSCAD, EMTP) can simulate detailed IBR controls, but for large power systems with many IBRs, slow simulation speeds severely impede the ability to study dynamic events [3] [4]. Massively paralleling simulations using high-performance computing (HPC) can help address this, especially now that cloud-based HPC capability is widely available, but today s EMT tools are not HPC-compatible, and parallelization of dynamic simulation solvers is not trivial because each region can dynamically affect the others. Thus, dynamic simulation of grids with very large numbers of IBRs potentially poses a barrier to the ongoing energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Thermal Energy Planner (STEP 1): A New Decision Support Tool for Solar Industrial Process Heat Applications

Solar thermal technologies are a promising technology to supply low-cost thermal energy to industrial processes, but there are often significant barriers to entry to industrial owners considering these technologies for their energy demands. To overcome this barrier and convey economic value to customers, NREL and Sandia National Laboratories developed Solar Thermal Energy Planner (STEP 1), a new web-based decision support tool for solar industrial process heat systems. At SolarPACES 2024, the STEP 1 tool was still under development; progress, methodologies, and a preliminary case study was presented. With the STEP 1 tool launch in May 2025, in this work, the initial version of the full public tool will be presented with demonstrations of its capabilities using a few case studies. First, the user's process heat needs such as location, process media (e.g., steam, air), process temperature, land availability, electricity and fuel costs, among other parameters. STEP 1 features a mapping interface that allows users to draw land and roof boundaries. The process media and temperature inform technology selection criteria modules that determine the appropriate solar thermal collection technologies, as well as congruent heat transfer media (e.g., hot water, oil, salt). Once the solar thermal technology selected, its nominal thermal production for the given site is characterized using NREL's System Advisor Model (SAM). Then, a modified version of NREL's REopt optimal sizing and dispatch optimization tool determines cost-optimal sizing. Within minutes, the user receives the results of the technoeconomics analysis, including the size and performance of the cost-optimal solar-plus-storage system. The cost of the system is compared to business-as-usual (e.g., an existing, standalone natural gas boiler). Users can download key results to store for sensitivity analyses. Examples of flat plate collector, parabolic trough, and molten salt tower applications with and without PV hybridization for different industrial facility types are presented in this work. The STEP 1 tool aims to reduce barriers to the adoption of solar heating solutions stemming from a lack of familiarity and technical background with solar system design options and costs among industry stakeholders.

14 SOLAR ENERGY↗

Using Spectral Measurements to Characterize Solar Reference Cells on a Two-Axis Tracker

A study is commencing relating the spectral responsivity of reference cells in the field to changing spectral distribution during the day. Initial results indicate that measurements of the incident spectral distribution can be used to match results of reference cell measurements on a two-axis tracker with a standard deviation of ±0.25% under clear-sky conditions. Initial results are provided. As more data are obtained covering a variety of field conditions and locations, the robustness of these results will be tested. The website https://midcdmz.nrel.gov/apps/sitehome.pl?site=PVRES contains the data generated by this project.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Assessing geothermal/solar hybridization – Integrating a solar thermal topping cycle into a geothermal bottoming cycle with energy storage

Geothermal and concentrating solar power (CSP) technologies typically use heat at different temperatures in their commercial deployments. This enables a technically viable hybridization of a solar topping cycle and a geothermal bottoming cycle at locations where both resources are available. In this article, an underperforming geothermal power system based at Burley, Idaho is used as a baseline to investigate the technical and economic potential of such a hybrid cycle. A direct thermal energy storage (TES) system is also integrated to overcome the intermittency of the solar resource. Design and off-design behavior of key components are modelled to simulate the annual performance of the hybrid system on an hourly basis. The sizing of the solar field and thermal storage is investigated and is seen to significantly impact the annual electricity generation and efficiency. Various cost scenarios for the solar field and thermal energy storage are investigated. An economic metric - levelized cost of electricity (LCOE) - is used to optimize the solar field sizing and TES capacity. The hybrid plant converts the additional solar heat input into additional work with an efficiency of 32.9%. Retrofitting a geothermal plant with solar and eight hours of energy storage can achieve an LCOE of 0.136 $/kWhe in current cost scenarios and 0.081 $/kWhe in a future cost reduction scenario. Although the hybrid system cannot directly compete with current PV systems without batteries, it has an LCOE 32% lower than that of a PV-battery system. This paper provides insights into the research and development of the future grid with a high renewable energy penetration and encourages further study of energy hybridization for improved efficiencies and economics.

15 GEOTHERMAL ENERGY↗

Observations and Lessons Learned in Residential Roofing Integrated Photovoltaics

The data file includes field observations of residential roofing integrated photovoltaics installation that happened between July 2021 and June 2022 in California. There are 21 observations - 2 in the re-roofing category and 19 in the new construction category. The file includes two time and motion forms (Re-Roofing & New Construction) we used to capture the time it takes for each activity in the rooftop solar and electrical installation process. You will see the duration for detailed steps along with activities that are included for total installation time for the paper. There are three parts to the time and motion form - Part 1 has project and crew characteristics, product information, and inspection and permitting data and can be filled before the installation. Part 2 has the actual installation time stamps and related notes. Part 3 has the crew information and can be filled on-site or off-site, but this section is optional. The re-roofing form has pre-solar activities and gutters and vents section in Part 2 of the form, whereas new construction form includes a section for capturing the time it took for rough wiring. The re-roofing form does not include rough wiring but instead includes the final electrical wiring process. These are the key differences in both the forms. Each day/step/installation activity needs to include the crew break time as they happen and there is space available to capture the crew breaks duration. In Table 1 below, the different terms used in the time and motion form are defined and their corresponding unit of measurement stated. We also highlight the optional sections. The data is captured in total mins, total hours, person mins, person hours. You can use this form or make edits to the form to recreate the study or make your own observations. The data herein was reviewed but may not be comprehensive. NREL invites questions and inputs to improve the data, including to: Correct erroneous information Fill in missing/updated information Clarifications on data and variables Updated information may be submitted to Sushmita Jena at sushmita.jena@nlr.gov.

14 SOLAR ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

PV Fleet Performance Data Initiative Program and Methodology

The US Department of Energy’s PV Fleet Performance Data Initiative has been launched in order to collect and evaluate production data across multiple PV fleet partners. Performance statistics are anonymized, aggregated and shared to represent a snapshot of the US commercial and utility-scale fleet. Production data have been collected from over 1500 systems representing more than 1.3 GWdc capacity. Preliminary analysis indicates median performance loss rates are in line with previous publications of system degradation, on the order of –0.6%/yr to –0.9%/yr (preliminary numbers subject to change). These values are higher than module-only degradation rates which are often used in pro-forma estimates of project performance and economics, potentially exposing owner/operators to increased risk if systems under-perform over time.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Quantifying Uncertainty in PV Energy Estimates Final Report

Uncertainty in PV energy estimates is "one of the most critical areas of lack of understanding" according to independent engineers, financiers, PV model developers, and other industry stakeholders. The primary problem is a lack of rigorous, transparent, widely accepted methods for quantifying uncertainty in energy production estimates. Uncertainty in energy production estimates arises from variability of the solar resource, inexact PV performance models and their parameters, and system reliability considerations. Uncertainty in annual energy production is frequently calculated for larger projects in order to quantify financial risk. Key statistics for energy, such as the P-values "P50" and "P90" (the annual energy values that are exceeded in future years with 50\% and 90\% probability, respectively) are used by financing institutions to calculate the repayment risk for the project. The current methods to estimate these statistics are typically proprietary, specialized, and involve significant post-processing of commercial performance model results. This black-box approach leads to inconsistent P-value estimates from different parties, which reduces investors' confidence in the results. Since the financial community bases its risk assessment on these estimates, reduced confidence increases perceived project risk, and consequently financing costs. The goal of this project was to establish a set of best practices for quantifying uncertainty in energy production estimates, including identifying what sources of uncertainty must be considered with clear definitions and metrics, determining which sources are the biggest drivers of uncertainty, and providing a computationally efficient framework for combining different sources of uncertainty that is flexible enough to accommodate substitutions of data or methods when better information is available. We engaged a wide set of stakeholders to ensure industry endorsement and adoption, and leveraged complementary projects investigating individual sources of uncertainty in great detail, as well as others' work that started down this path.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Feasibility Analyses for the Microgrid of the Mountain in the Cordillera Central Region of Puerto Rico

Distributed energy resource (DER) development can benefit communities through improvement of access to reliable electricity and a resilient energy system. Many place-specific considerations must be accounted for when designing electrical systems with co-located generation and loads. This paper presents an overview of four studies focusing on different aspects for regional DER development in the Cordillera Central region of Puerto Rico, including a grid and load stability study with the introduction of solar energy generation, microgrid design based on the solar resource in the area, resilience considerations during power outage scenarios, and qualitative risk aspects for components in the microgrid. Additionally, a conceptual substation microgrid analysis is conducted using the Microgrid Design Toolkit (MDT) to evaluate trade-offs between cost and energy availability, providing insights into optimal design strategies. A microgrid resilience assessment is performed using the Resilient Nodal Cluster Analysis Tool (ReNCAT) to identify critical loads and evaluates their accessibility during outages, emphasizing the importance of community needs. Finally, a qualitative risk assessment utilizing Hazard and Operability Analysis (HAZOP) methods highlights potential hazards and mitigations for microgrid components, ensuring robust system design and operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overcoming Communications Outages in Inverter Downtime Analysis: Preprint

Inverters are often reported to be the highest-impact failure point in PV systems. This importance is belied by the simplistic assumptions about inverter downtime losses used in industrial energy modeling. Energy models often assume the extent of inverter-related losses is limited to 1% of annual production from scheduled inverter preventative maintenance. In reality, inverter-related production losses are much more variable, although data from large-scale surveys of fielded systems are rare. Here we present a method of detecting inverter downtime events and estimating the associated lost production using inverter- and meter-level power data. Because communications outages are of similar frequency to true production outages, the method pays particular attention to distinguishing communications outages from true production outages. The results of applying the method at fleet-scale are presented and discussed.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Parcel-Scale Assessment of Rooftop Solar Technical Potential

Understanding the potential for rooftop solar and other distributed energy resources (DERs) to contribute to power system planning is increasingly relevant for cities, utilities, and other planning entities. Such planning efforts typically require an estimate of technical potential, or the feasible technology potential independent of economic considerations. Currently, best-in-class rooftop solar technical potential methods use Light Detection and Ranging (LiDAR) data which can identify each roof plane tilt, azimuth, and unshaded area. However, LiDAR data is not universally available and, even when available, obtaining and processing this data can be expensive. In contrast, parcel-level data is easy to use and widely available as it is generated by jurisdictions to levy property taxes. Such data universally reports building footprint area, which is highly correlated with roof area suitable (developable) for rooftop solar. Moreover, parcel data identifies building end-use, tenure, and other building characteristics not provided by LiDAR. To explore the feasibility of using parcel data to assess technical potential more broadly, we compare estimates using parcel data in Orlando, Florida (HIFLD 2020) to those generated using LiDAR data (Koebrich et al. 2021). We find that the parcel-based method results in accurate technical potential estimates at a block and city-scale, though only after accounting for shading and other factors that derate developable roof area. The results of this study demonstrate a scalable, low-effort approach to assess rooftop solar technical potential for every city and community in the U.S.

census blocks↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗