Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4)

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO2) in deep saline formations. Designed from the perspective of a CO2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust and actionable insights for screening project finances.

CO2 storage↗

FECM/NETL CO 2 Saline Storage Cost Model (2024): User’s Manual

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO 2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO 2 ) in deep saline formations. Designed from the perspective of a CO 2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust, and actionable insights for evaluating project finances. This is the user's manual for CO2_S_COM. The model may be accessed at this link: FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4) - Submissions - EDX

54 ENVIRONMENTAL SCIENCES↗

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications. In summary: INL mobile real-time systems have been successfully used as pre-certification devices for contaminated soils under specific conditions, and accepted by regulators as an approved method to replace or significantly reduce physical sampling and laboratory analysis. These systems coupled with advanced data collection and analysis software developed at the INL to perform production pre-screening soil surveys are also used to determine final analytical sample locations for final validation of sites. The success of the real-time soil characterization program at DOE-Ohio field office sites at Mound and Fernald provided the driver for use of some of these systems at the current INL ICP. Additionally, the use of INL real-time advanced assay systems at Fernald resulted in overall cost savings to the soil remediation project totaling $34 M by the end of the project in 2006. Although the genesis of these systems occurred in the DOE Environmental Management program, other agencies have examined the use of real-time mobile spectrometry in cross-cutting applications such as National Homeland Security; where modified versions of these systems could be applied to monitoring, and surveillance of facilities and events as well as event-response to terrorist attacks using radioactive materials. (authors)

54 ENVIRONMENTAL SCIENCES↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated work management system.

Sandia National Laboratories develops technologies to: (1) sustain, modernize, and protect our nuclear arsenal (2) Prevent the spread of weapons of mass destruction; (3) Provide new capabilities to our armed forces; (4) Protect our national infrastructure; (5) Ensure the stability of our nation's energy and water supplies; and (6) Defend our nation against terrorist threats. We identified the need for a single overarching Integrated Workplace Management System (IWMS) that would enable us to focus on customer missions and improve FMOC processes. Our team selected highly configurable commercial-off-the-shelf (COTS) software with out-of-the-box workflow processes that integrate strategic planning, project management, facility assessments, and space management, and can interface with existing systems, such as Oracle, PeopleSoft, Maximo, Bentley, and FileNet. We selected the Integrated Workplace Management System (IWMS) from Tririga, Inc. Facility Management System (FMS) Benefits are: (1) Create a single reliable source for facility data; (2) Improve transparency with oversight organizations; (3) Streamline FMOC business processes with a single, integrated facility-management tool; (4) Give customers simple tools and real-time information; (5) Reduce indirect costs; (6) Replace approximately 30 FMOC systems and 60 homegrown tools (such as Microsoft Access databases); and (7) Integrate with FIMS.

99 GENERAL AND MISCELLANEOUS↗

Advanced Distillation Final Report

The Advanced Distillation project was concluded on December 31, 2009. This U.S. Department of Energy (DOE) funded project was completed successfully and within budget during a timeline approved by DOE project managers, which included a one year extension to the initial ending date. The subject technology, Microchannel Process Technology (MPT) distillation, was expected to provide both capital and operating cost savings compared to conventional distillation technology. With efforts from Velocys and its project partners, MPT distillation was successfully demonstrated at a laboratory scale and its energy savings potential was calculated. While many objectives established at the beginning of the project were met, the project was only partially successful. At the conclusion, it appears that MPT distillation is not a good fit for the targeted separation of ethane and ethylene in large-scale ethylene production facilities, as greater advantages were seen for smaller scale distillations. Early in the project, work involved flowsheet analyses to discern the economic viability of ethane-ethylene MPT distillation and develop strategies for maximizing its impact on the economics of the process. This study confirmed that through modification to standard operating processes, MPT can enable net energy savings in excess of 20%. This advantage was used by ABB Lumus to determine the potential impact of MPT distillation on the ethane-ethylene market. The study indicated that a substantial market exists if the energy saving could be realized and if installed capital cost of MPT distillation was on par or less than conventional technology. Unfortunately, it was determined that the large number of MPT distillation units needed to perform ethane-ethylene separation for world-scale ethylene facilities, makes the targeted separation a poor fit for the technology in this application at the current state of manufacturing costs. Over the course of the project, distillation experiments were performed with the targeted mixture, ethane-ethylene, as well as with analogous low relative volatility systems: cyclohexane-hexane and cyclopentane-pentane. Devices and test stands were specifically designed for these efforts. Development progressed from experiments and models considering sections of a full scale device to the design, fabrication, and operation of a single-channel distillation unit with integrated heat transfer. Throughout the project, analytical and numerical models and Computational Fluid Dynamics (CFD) simulations were validated with experiments in the process of developing this platform technology. Experimental trials demonstrated steady and controllable distillation for a variety of process conditions. Values of Height-to-an-Equivalent Theoretical Plate (HETP) ranging from less than 0.5 inch to a few inches were experimentally proven, demonstrating a ten-fold performance enhancement relative to conventional distillation. This improvement, while substantial, is not sufficient for MPT distillation to displace very large scale distillation trains. Fortunately, parallel efforts in the area of business development have yielded other applications for MPT distillation, including smaller scale separations that benefit from the flowsheet flexibility offered by the technology. Talks with multiple potential partners are underway. Their outcome will also help determine the path ahead for MPT distillation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

Real-World Experiences Adopting Workflows at Exascale on the ExaAM Project

The purpose of this study is to discuss the experiential lessons associated with adopting scientific workflows in the Exascale Additive Manufacturing project (ExaAM) through the lens of Perceived Characteristic of Innovation (PCI). Besides the implementation, the factors we considered critical to the adoption of the workflow are provenance, sustainable automation, implementation challenges, and integration/compatibility challenges. Through conversations and interviews among the program managers, project leads, and software engineers, we have developed critical insight and strategies to overcome the obstacles and augment the successful adoption and long-term use of these workflows in ExaAM and beyond. We hope our work will pave the way for others in the research community to develop and use workflows in their respective science domains.

Malviya, Addi Thakur↗

Robotic D and D: Smart robots - 15093

Project' managers continually seek an ever-greater optimization of time between remote handling operations and those carried out manually; therefore, new technological solutions must be deployed. Robotics offers a great opportunity in this new field of technology to carry out, for example, samplings or remediation in hostile, cluttered surroundings. Teams in charge of dismantling at the CEA have therefore first defined robotizable functions. These functions have been assembled from existing technological blocks to arrive at robots which are operating today [RICAIII, patent: FR 2925702]. Lessons learned, particularly from experience with the RICA robot, have enabled the operating technical specifications to be fine-tuned. A new study phase has been launched applying the same principle of adapting existing, proven means. The growing role of robotics today is unquestioned. Led by research and the academic world; robots such as those equipped with wheels, tracks, feet or even helicopter rotors, are today accessible to the general public, particularly via broadening of the 'open source' concept. Added to these we need tools able to manage large component deconstruction systems, like MAESTRO. Industrialization of such high-potential technological solutions has been aided by: - Easy use, - Increasing reliability, - Flexibility of 'open source' solutions, - Widening skill networks, and therefore greater technical support - Lower costs. Decontamination and dismantling (D and D) projects must be able to meet a number of special demands, increasing the number of unit designs, their costs and delivery times. The complexity of dismantling works sites mean that each is a special case to be dealt with almost independently. Such a way of approaching these projects is not on the same wavelength as industry, with tool and method standardization. The answer to the challenge of operations in difficult environments is an eco-system of functions, performed by a set of inter-connected robots. The first step towards the construction of such robot teams is devoted to functions where strength is not necessary: investigating and clean-up in hostile environments. With this in mind, the CEA Marcoule teams have been given the objective of merging the strengthening commercial robotic world with the needs of D and D, and thus to improve the transversal use of the systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗

Implementation of SAP Waste Management System

The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving Indigenous Adoption and Sustainability

This study sought to develop a framework which would assist project implementers in their efforts to effectively indigenize technical and policy expertise in SNL's international partners. The initial assumption was that current and past projects undertaken by the Center for Global Security and Cooperation (CGSC) had produced many successful and effective tools and techniques to achieve indigenization and sustainability. As such, this study would be able leverage those tools and techniques to produce a common framework that would enhance SNL's ability to reproduce those past successes. Data was collected for this study by conducting a series of interviews and focus groups in order to elicit information about SNL's efforts and capabilities. The interviews focused on collecting data ranging from understanding definitions of sustainability and indigenization to financial considerations and various project management considerations. Initial findings showed that the problem statement originally formed in this study's hypothesis was missing elements of customer and in-country partner needs and goals which lead the interview team to adapt the original goal to determine what elements produced a success project rather than developing a framework. Overall the study found four main components that each successful project shared: the need to answer the right question, involve an institutional champion, the need to understand key stakeholders, and finally the need continually survey the project landscape.

99 GENERAL AND MISCELLANEOUS↗