Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Reasoning abstractly about resources

r describes a way to schedule high level activities before distributing them across multiple rovers in order to coordinate the resultant use of shared resources regardless of how each rover decides how to perform its activities. We present an algorithm for summarizing the metric resource requirements of an abstract activity based n the resource usages of its potential refinements.

abstraction planning rovers multiple agents↗

Resource Management for Processing Wide Area Data Streams on Supercomputers

Modern scientific instruments generate enormous amount of data. Typically, the data collected from the instruments are stored in one or more files that are then moved to a distant supercomputer for processing. The final results are sent back to the user. In order to make effective use of the time on expensive instruments, experimenters want to process the data as they are generated. They want to stream the data from instruments' memory directly to a supercomputer's memory for analysis. Since the compute nodes in a supercomputer are not connected directly to the wide area network, the data streams need to be passed through intermediate gateway nodes. As opposed to the best effort file transfers, data streaming applications require resources at a specific time for a specific period. In this paper, we present a system model for enabling data streaming through gateway nodes and an algorithm to efficiently allocate gateway node resources along with compute nodes. We evaluate the algorithm using real-world traces on the Chameleon Cloud. The results show that our system can schedule compute and gateway resources efficiently for streaming analysis.

data streaming↗

Spacelab mission dependent training parametric resource requirements study

Training flows were developed for typical missions, resource relationships analyzed, and scheduling optimization algorithms defined. Parametric analyses were performed to study the effect of potential changes in mission model, mission complexity and training time required on the resource quantities required to support training of payload or mission specialists. Typical results of these analyses are presented both in graphic and tabular form.

Ogden, D. H.↗

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.↗

Distributed network scheduling

We investigate missions where communications resources are limited, requiring autonomous planning and execution. Unlike typical networks, spacecraft networks are also suited to automated planning and scheduling because many communications can be planned in advance.

scheduling↗

Knowledge based tools for Hubble Space Telescope planning and scheduling: Constraints and strategies

The Hubble Space Telescope (HST) presents an especially challenging scheduling problem since a year's observing program encompasses tens of thousands of exposures facing numerous coupled constraints. Recent progress in the development of planning and scheduling tools is discussed which augment the existing HST ground system. General methods for representing activities, constraints, and constraint satisfaction, and time segmentation were implemented in a scheduling testbed. The testbed permits planners to evaluate optimal scheduling time intervals, calculate resource usage, and to generate long and medium range plans. Graphical displays of activities, constraints, and plans are an important feature of the system. High-level scheduling strategies using rule based and neural net approaches were implemented.

Miller, Glenn↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Data-driven batch schuduling

In this paper, we develop data-driven strategies for batch computing schedulers. Current CPU-centric batch schedulers ignore the data needs within workloads and execute them by linking them transparently and directly to their needed data. When scheduled on remote computational resources, this elegant solution of direct data access can incur an order of magnitude performance penalty for data-intensive workloads. Adding data-awareness to batch schedulers allows a careful coordination of data and CPU allocation thereby reducing the cost of remote execution. We offer here new techniques by which batch schedulers can become data-driven. Such systems can use our analytical predictive models to select one of the four data-driven scheduling policies that we have created. Through simulation, we demonstrate the accuracy of our predictive models and show how they can reduce time to completion for some workloads by as much as 80%.

97 MATHEMATICS AND COMPUTING↗

Approximate Scheduling of DERs with Discrete Complex Injections

Rapid penetration of renewable energy based Distributed Energy Resources (DER) has the potential to exacerbate the challenges inherent in grid frequency and voltage regulation. However, their real time controllability can be leveraged to not only mitigate such challenges, but improve the economics and quality of grid operations. A plethora of DER scheduling algorithms have been developed for fast and efficient scheduling of these resources. These algorithms schedule the complex - real and reactive power injected into (or drawn from) the grid by the DERs under various cost objective functions and grid constraints. However, a vast majority of such algorithms assume the feasible range of power injections to be continuous. In reality, the control options available for several DERs form a discrete space. This implies that the feasible range of power injections also forms a discrete space. This makes DER scheduling an NP-hard problem. Integer/Mixed Integer program based algorithms, which guarantee optimality in the objective value, have been developed. But these are prohibitively expensive in terms of computational time requirements. On the other hand, fast heuristic based solutions have also been developed. But as they do not provide any guarantee on the optimality of the objective, or on satisfying the constraints, they are unreliable for grid operations. Recent works have developed approximation algorithms which offer the best of both the approaches above: (near) optimality and low computational complexity, both of which are governed by a user defined accuracy parameter ϵ. In this work, we significantly improve upon such existing works by developing an approximation algorithm which schedules DERs with complex injections (as opposed to only real injection) and whose runtime is polynomial (as opposed to exponential) in 1/ϵ. We provide theoretical analysis and support them with experimental results to validate the guarantees provided by our approximation algorithm.

14 SOLAR ENERGY↗

Schedule Management Optimization (SMO) Domain Model (V.1.2)

Schedule Management Optimization (SMO) is a tool for automatically generating a schedule of project tasks. Project scheduling is traditionally achieved with the use of commercial project management software or case-specific optimization formulations. Commercial software packages are useful tools for managing and visualizing copious amounts of project task data. However, their ability to automatically generate optimized schedules is limited. Furthermore, there are many real-world constraints and decision variables that commercial packages ignore. Case-specific optimization formulations effectively identify schedules that optimize one or more objectives for a specific problem, but they are unable to handle a diverse selection of scheduling problems. SMO enables practitioners to generate optimal project schedules automatically while considering a broad range of real-world problem characteristics. SMO has been designed to handle some of the most difficult scheduling problems – those with resource constraints, multiple objectives, multiple inventories, and diverse ways of performing tasks. This report contains descriptions of the SMO modeling concepts and explains how they map to real-world scheduling considerations.

97 MATHEMATICS AND COMPUTING↗

Job Management Requirements for NAS Parallel Systems and Clusters

A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

Saphir, William↗

AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule

The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

Yao, S. S.↗

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

Programmed environment management of confined microsocieties

A programmed environment is described that assists the implementation and management of schedules governing access to all resources and information potentially available to members of a confined microsociety. Living and work schedules are presented that were designed to build individual and group performance repertoires in support of study objectives and sustained adaptation by participants. A variety of measurement requirements can be programmed and standardized to assure continuous assessment of the status and health of a confined microsociety.

Emurian, Henry H.↗

Is Knowledge about Running Applications Helping Improve Runtime Prediction of HPC Jobs?

High-performance computing systems rely upon scheduling algorithms to achieve high utilization. These schedulers rely upon user estimates of job resource requirements, such as runtime, to determine optimal scheduling of incoming jobs. These user estimates, however, are prone to error. To mitigate this error, significant research has been directed at providing better estimates of job runtime, usually employing machine learning techniques. These techniques are dependent upon the input features selected. Among the possible features is the primary application used by the job. In a survey of more than 20 papers directed at improving runtime prediction, only four included primary application as an input feature. We focus this investigation specifically on the value of adding primary application as an input feature, and find that it does improve model performance, especially for jobs with longer runtimes, though this improvement varies based on the application used. We recommend further research to determine the cause of this variability as well as an optimal strategy for employing a mixture of models both including and not including primary application as a feature.

MATHEMATICS AND COMPUTING↗

The SGI/Cray T3E: Experiences and Insights

The NASA Goddard Space Flight Center is home to the fifth most powerful supercomputer in the world, a 1024 processor SGI/Cray T3E-600. The original 512 processor system was placed at Goddard in March, 1997 as part of a cooperative agreement between the High Performance Computing and Communications Program's Earth and Space Sciences Project (ESS) and SGI/Cray Research. The goal of this system is to facilitate achievement of the Project milestones of 10, 50 and 100 GFLOPS sustained performance on selected Earth and space science application codes. The additional 512 processors were purchased in March, 1998 by the NASA Earth Science Enterprise for the NASA Seasonal to Interannual Prediction Project (NSIPP). These two "halves" still operate as a single system, and must satisfy the unique requirements of both aforementioned groups, as well as guest researchers from the Earth, space, microgravity, manned space flight and aeronautics communities. Few large scalable parallel systems are configured for capability computing, so models are hard to find. This unique environment has created a challenging system administration task, and has yielded some insights into the supercomputing needs of the various NASA Enterprises, as well as insights into the strengths and weaknesses of the T3E architecture and software. The T3E is a distributed memory system in which the processing elements (PE's) are connected by a low latency, high bandwidth bidirectional 3-D torus. Due to the focus on high speed communication between PE's, the T3E requires PE's to be allocated contiguously per job. Further, jobs will only execute on the user specified number of PE's and PE timesharing is possible but impractical. With a highly varied job mix in both size and runtime of jobs, the resulting scenario is PE fragmentation and an inability to achieve near 100% utilization. SGI/Cray has provided several scheduling and configuration tools to minimize the impact of fragmentation. These tools include PScheD (the political scheduler), GRM (the global resource manager) and NQE (the Network Queuing Environment). Features and impact of these tools will be discussed, as will resulting performance and utilization data. As a distributed memory system, the T3E is designed to be programmed through explicit message passing. Consequently, certain assumptions related to code design are made by the operating system (UNICOS/mk) and its scheduling tools. With the exception of HPF, which does run on the T3E, however poorly, alternative programming styles have the potential to impact the T3E in unexpected and undesirable ways. Several examples will be presented (preceeded with the disclaimer, "Don't try this at home! Violators will be prosecuted!")

Bernard, Lisa Hamet↗

Is Knowledge About Running Applications Helping Improve Runtime Prediction of HPC Jobs?

High-performance computing systems rely upon scheduling algorithms to achieve high utilization. These schedulers rely upon user estimates of job resource requirements, such as runtime, to determine optimal scheduling of incoming jobs. These user estimates, however, are prone to error. To mitigate this error, significant research has been directed at providing better estimates of job runtime, usually employing machine learning techniques. These techniques are dependent upon the input features selected. Among the possible features is the primary application used by the job. In a survey of more than 20 papers directed at improving runtime prediction, only four included primary application as an input feature. We focus this investigation specifically on the value of adding primary application as an input feature, and find that it does improve model performance, especially for jobs with longer runtimes, though this improvement varies based on the application used. We recommend further research to determine the cause of this variability as well as an optimal strategy for employing a mixture of models both including and not including primary application as a feature.

feature selection↗