Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Launch System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.

Hutt, John J.↗

NASA's Space Launch System: Progress Report

NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight

Cook, Jerry↗

Methodologies for Verification and Validation of Space Launch System (SLS) Structural Dynamic Models: Appendices

Verification and validation (V&V) is a highly challenging undertaking for SLS structural dynamics models due to the magnitude and complexity of SLS subassemblies and subassemblies. Responses to challenges associated with V&V of Space Launch System (SLS) structural dynamics models are presented in Volume I of this paper. Four methodologies addressing specific requirements for V&V are discussed. (1) Residual Mode Augmentation (RMA). (2) Modified Guyan Reduction (MGR) and Harmonic Reduction (HR, introduced in 1976). (3) Mode Consolidation (MC). Finally, (4) Experimental Mode Verification (EMV). This document contains the appendices to Volume I.

Coppolino, Robert N.↗

Enabling Science and Deep Space Exploration through Space Launch System (LSL) Secondary Payload Opportunities

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). By reaching this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. NASA is making investments to expand science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1), currently planned for launch no earlier than July 2018, will be the first mission to carry such payloads on the SLS. The EM-1 launch will include thirteen 6U Cubesat small satellites that will be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Development of Unsteady Pressure-Sensitive Paint Application on NASA Space Launch System

The key measurement to acquire for understanding unsteady flow is surface pressure. Unsteady Pressure-Sensitive Paint (uPSP) is an emerging optical technique used in wind tunnel testing to measure fluctuating surface pressures. Recently, tests were conducted on NASA’s Space Launch System in NASA Ames Research Center’s Unitary Plan Wind Tunnel to determine the aeroacoustics environment and assist in developing the buffet forcing functions. Unsteady PSP data was collected during this test campaign. Steady state PSP data, infrared thermography, shadowgraph, accelerometer data, and dynamic pressure transducer data were also collected. In all 50 TB of data were collected during the three days of testing. During these three days of testing, a repeating transonic and supersonic alpha sweep condition was acquired. This paper presents these two wind tunnel conditions and examines how the temperature influences the PSP data. In the first large demonstration of uPSP in 2015 on an NESC-, AETC-sponsored wind tunnel test, lifetime PSP results highlighted the influence the model temperature had on the PSP data. A best practice of heat soaking the model before acquiring calibration images was followed during the test campaign presented in this paper. An infrared thermography camera and thermocouples were installed in the model to collect more details of the model surface temperature. Data processing schemes for uPSP are still in development but will be briefly presented here as well.

Roozeboom, Nettie H.↗

Aluminum 2195 T8 Gore Development for Space Launch System Core and Upper Stage

Gores are pie-shaped panels that are welded together to form the dome ends of rocket fuel tanks as shown in figure 1. Replacing aluminum alloy 2219 with aluminum (Al)-lithium (Li) alloy 2195 as the Space Launch System (SLS) cryogenic tank material would save enormous amounts of weight. In fact, it has been calculated that simply replacing Al 2219 gores with Al 2195 gores on the SLS core stage domes could save approximately 3,800 pound-mass. This is because the Al-Li 2195 alloy exhibits both higher mechanical properties and lower density than the SLS baseline Al 2219 alloy. Indeed, the known advantages of Al 2195 led to its use as a replacement for Al 2219 in the shuttle external tank program. The required thicknesses of Al 2195 gores for either SLS core stage tanks or upper stage tanks will depend on the specific design configurations. The required thicknesses or widths may exceed the current experience base in the manufacture of such gores by the stretch-forming process. Accordingly, the primary objective of this project was to enhance the formability of Al 2195 by optimizing the heat treatment and stretch-forming process for gore thicknesses up to 0.75 inches, which envelop the maximum expected gore thicknesses for SLS tank configurations.

Volz, Martin↗

Space Launch System Block-1b USA Separation Analysis and Requirements Derivation From CLVTOPS Toolchain

Ensuring that rocket stage separation events provide positive clearance is critical to avoid loss of mission or crew. NASA's Marshall Space Flight Center (MSFC) has developed a cutting-edge toolchain to address this type of problem and it was used to set abstracted impulse requirements on, and to analyze the results of, the in-space separation event of the Universal Stage Adapter (USA) and the Exploration Upper Stage (EUS) of NASA's Space Launch System (SLS) Block-1B configuration. The toolchain is used as a hardware simulation to confirm positive body-to-body clearance during the separation event. It is also used to create a requirements-space simulation, which helps inform requirements as the hardware design matures.

Zachary T Muscha↗

NASA’s Space Launch System Successfully Launches Artemis I Mission and Hardware Progress Continues for Next Artemis Missions

NASA’s Artemis I mission will be the first flight of the agency’s Space Launch System (SLS) rocket. It will launch an uncrewed Orion spacecraft to the Moon, where it will enter a highly elliptical retrograde orbit. In 2022, final tests, checkouts, and preparations were on schedule to be completed, including the vital wet dress rehearsal (WDR) at Kennedy Space Center’s (KSC) Launch Complex 39B. Following successful completion of WDR, which is expected in summer 2022, the Artemis I launch vehicle will be returned to the Vehicle Assembly Building (VAB) at KSC where it will be prepared for launch. Important data were collected during launch and will be shared as applicable. While the Artemis I hardware and mission took center stage in 2022, significant progress was made on hardware and software for future Artemis missions, including for the first crewed launch and the following SLS Block 1B and Block 2 variants of the rocket.

John Honeycutt↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

Space Launch System Booster Separation Supersonic Powered Testing with Surface and Off-Body Measurements

A wind tunnel test was run in the NASA Langley Unitary Plan Wind Tunnel simulating the separation of the two solid rocket boosters (SRB) from the core stage of the NASA Space Launch System (SLS). The test was run on a 0.9% scale model of the SLS Block 1B Cargo (27005) configuration and the SLS Block 1B Crew (28005) configuration at a Mach of 4.0. High pressure air was used to simulate plumes from the booster separation motors located at the nose and aft skirt of the two boosters. Force and moment data were taken on both SRBs and on the core stage. Schlieren still photos and video were recorded throughout testing. A set of points were acquired using Cross-correlation Doppler Global Velocimetry (CCDGV) readings to get 3 component velocity measurements between the core and the left-hand SRB. The CCDGV laser was utilized to record flow visualization in the same location, between the core and the left-hand SRB. Pressure Sensitive Paint data were taken on a separate set of runs. Computational Fluid Dynamics (CFD) runs were computed on a subset of the wind tunnel data points for comparison. A combination of the force/moment, CCDGV and Pressure Sensitive Paint (PSP) data (as well as schlieren images) at the CFD-specified test conditions will be used te the CFD simulations that will be used to build an SLS booster separation database flight conditions.

Winski, Courtney S.↗

Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test, conducted at Marshall Space Flight Center. The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

Nance, Donald↗

Parametric Study of the Forward Attachment Geometry for the Space Launch System Next Generation Booster

Launch vehicle transonic buffet environments can generate large dynamic structural loads and vibratory responses. For the Space Launch System (SLS) vehicle, the highest transonic buffet environments have been observed in the multibody region between the core and solid rocket boosters, particularly downstream of the booster forward attachment. The buffet environment is particularly sensitive to the outer mold line (OML) of the forward attachment, and even relatively minor geometry changes can have large impacts on buffet and other aerodynamic environments. The SLS program is redesigning the booster for the Block 2 vehicle to support updated mission goals. This redesign necessitated changes in the forward attachment geometry, which raised concerns about the buffet and vibroacoustic environments. A preliminary study was conducted that developed multiple forward attachment geometries that satisfied the programmatic requirements, but the aerodynamic environment impacts were unclear. In March 2022, a wind-tunnel test was conducted at the NASA Ames 11- by 11-foot Transonic Wind Tunnel to study these environments generated from each of the configurations in order to select the most viable candidate. This paper will discuss this test campaign, the results from the parametric study, as well as general observations regarding OML features that impact the buffet environment. Buffet environments will be presented and compared for each configuration and comparisons presented where applicable.

buffet↗

Parametric Study of the Forward Attachment Geometry for the Space Launch System Next Generation Booster

Launch vehicle transonic buffet environments can generate large dynamic structural loads and vibratory responses. For the Space Launch System (SLS) vehicle, the highest transonic buffet environments have been observed in the multibody region between the core and solid rocket boosters, particularly downstream of the booster forward attachment. The buffet environment is particularly sensitive to the outer mold line (OML) of the forward attachment, and even relatively minor geometry changes can have large impacts on buffet and other aerodynamic environments. The SLS program is redesigning the booster for the Block 2 vehicle to support updated mission goals. This redesign necessitated changes in the forward attachment geometry, which raised concerns about the buffet and vibroacoustic environments. A preliminary study was conducted that developed multiple forward attachment geometries that satisfied the programmatic requirements, but the aerodynamic environment impacts were unclear. In March 2022, a wind-tunnel test was conducted at the NASA Ames 11- by 11-foot Transonic Wind Tunnel to study these environments generated from each of the configurations in order to select the most viable candidate. This paper will discuss this test campaign, the results from the parametric study, as well as general observations regarding OML features that impact the buffet environment. Buffet environments will be presented and compared for each configuration and comparisons presented where applicable.

buffet↗

Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test (SMAT), conducted at Marshall Space Flight Center (MSFC). The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

Nance, Donald K.↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗