Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trade Space”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we will describe JPL’s concurrent engineering ATeam and Team X support to the Psyche competed concept study team in the areas of 1) Science Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery class mission started as a grassroots idea in our A-Team facility, and in less than five years was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and experts throughout their mission concept lifecycle.

Ziemer, John↗

Low-thrust trajectory Bacon plots for Mars mission design

The best way to understand a mission design trade space is by creating a good map of all the possibilities, and by knowing how to read it. Bacon plots, which are low-thrust analogs to porkchop plots, give insight into key parameters and sensitivities of possible transfers to Mars (or other destinations). They are mission and parameter specific, and can be created to represent single or multiple legs. This paper outlines the creation process and lessons learned in interpreting the results. An example is given on how bacon plots have been employed for complex mission-level optimization.

Olikara, Zubin↗

Pragmatic Stress Prediction on Additively Manufactured Coupons

Prediction of residual stresses from process parameters for additively manufactured large metal parts is computationally expensive. NASA is currently developing meter-scale parts with direct energy deposition. Practically, the predictive computational methods need to efficiently scale-up to meter-scale parts. Coupled thermal-mechanical multi-physics simulations have been developed with the pragmatic method using ABAQUS, COMSOL Multiphysics, ALE3D software. The residual stresses are a result of the manufacturing process which creates thermal cycling of the build layers. The pragmatic method uses lumped thermal layers for stress predictions to reduce computational costs. The stress predictions as well as deformations of the different codes are compared with each other and with ANSYS Additive using identical material models, boundary and initial conditions. The codes were used to simulate three different geometries: a thin wall, hollow cylinder and twin-cantilever part. The coupon parts were then manufactured with Inconel-625. The residual stresses in these parts were measured using X-ray diffraction as well as neutron beam diffraction at NIST. The stress measurements for the two technologies are compared. The pragmatic stress prediction method enabled predictions of the multi-centimeter scale parts using desktop computer workstations in only a few hours for each coupon. The results of the simulated stress predictions compared favorably with the measured stresses even though thermally lumped layers were employed. Finally, a two-meter scale nozzle was simulated using ANSYS Additive. The simulations were used to examine the build orientation trade-space with respect to resulting geometric deformation. The predicted deformations were compared to measurements of an actual subscale part manufactured with direct energy deposition.

Additive Manufacturing↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

The NASA Artemis program has brought significant change to the agency’s human exploration strategy over the last several years. The human exploration of Mars remains an ultimate objective of the overall human exploration strategy. However, how the agency intends to execute initial human exploration of Mars has shifted to better align with current policy. These changes find their way into the design of key architecture elements, such as the Mars Ascent Vehicle (MAV). Of the numerous changes in the conceptual human Mars architecture, two in particular have had significant impact on the design of the human MAV: the desire for minimal surface infrastructure for initial human Mars missions, and technology investment timelines in support of initial human missions to Mars. The first leads to a surface mission architecture targeting a 30-day surface duration with two crewmembers. The second drives out in-situ resource utilization (ISRU) from the initial sortie. As a result, the reference MAV design for initial human Mars missions in the Human Exploration and Operations Mission Directorate’s Strategic Analysis Cycle 2021 (SAC21) is based around supporting the return of 2 crew from the surface of Mars, without surface ISRU. This has led to several design changes since 2019, when details of a reference human MAV were last published. The MAV concept for SAC21 consists of a two-stage vehicle capable of supporting two crew for 84 hours. This duration is derived from a baseline ascent trajectory targeting an apoapsis rendezvous with the habitation element in a nominal 5-sol Mars aggregation orbit. With the goal of minimizing technology investments for the initial surface sortie removing ISRU from the trade space, the MAV must now be landed either fully loaded with propellant, or with some portion of the propellant off-loaded. Landing a partially-fueled MAV will require additional surface assets to perform robotic propellant transfer on the surface of Mars from a pre-emplaced propellant depot. Furthermore, cryogenic fluid management and storage for extended duration with no losses represents additional technology investment that would have to be made to support cryogenic-based propellant concepts that have been the baseline in past architectures. As a result, the SAC21 architecture utilizes a storable propellant-based MAV propulsion system to minimize these potential technology investments incurred by cryogenic-based propulsion systems. Recent efforts also focused on evaluating the sensitivity of key design parameters, such as landing site latitude, elevation, and local atmospheric conditions. All play a large role in determining the predicted propellant requirements of the MAV. Understanding their potential impacts is important because of the rippling effects of changes to the MAV design on other architecture elements, such as entry, descent, landing, and transportation systems. Results indicate up to +2% to -4% wet mass variation due to landing site latitude, with higher latitudes greater than 70 degrees North resulting in greater than 6% wet mass increases. The MAV saw reduced impact due to atmospheric design parameters, which only accounting for -0.6% to +0.4% wet mass variation.

Douglas J. Trent↗

Ray Tracing Techniques for the Characterization of Lunar Communication Architectures

This paper provides an overview of the computational techniques used to characterize the viability of different lunar architectures and their ability to provide communication services to the lunar surface. This analysis was done with modern ray tracing techniques that allow for the computations to be done on Graphics Processing Unit (GPU) clusters for a high level of parallelism and severe reduction in computation time. The ray tracing computations were done with the GPU platform Compute Unified Device Architecture (CUDA) provided by NVIDIA which utilizes general-purpose computing on graphics processing units (GPGPU). This new method provides the advantage of being able to characterize a much larger portion of the lunar surface due to its computational efficiency as well as providing a more accurate representation of elevation angle limits instead of the typical and often inaccurate elevation angle mask. The Lunar surface can now be characterized with metrics such as contact time, outage time, and received data rate. With these metrics, different proposed Lunar architectures can be rapidly evaluated. This reduction in computation time not only leads to more accurate results but allows these results to be obtained in a time frame that allows for the complete characterization of the trade space. It is expected that these different architecture comparisons will lead to a conclusive determination of the optimal Lunar architecture and will allow for future Lunar missions to operate as close to real time as possible. In addition, this computation method can be used to recreate visibility figures generated by previous methods but with an increased level of accuracy.

Thomas Montano↗

Pragmatic Stress Prediction on Additively Manufactured Coupons

Prediction of residual stresses from process parameters for additively manufactured large metal parts is computationally expensive. NASA is currently developing meter-scale parts with direct energy deposition. Practically, the predictive computational methods need to efficiently scale-up to meter-scale parts. Coupled thermal-mechanical multi-physics simulations have been developed with the pragmatic method using ABAQUS, COMSOL Multiphysics, ALE3D software. The residual stresses are a result of the manufacturing process which creates thermal cycling of the build layers. The pragmatic method uses lumped thermal layers for stress predictions to reduce computational costs. The stress predictions as well as deformations of the different codes are compared with each other and with ANSYS Additive using identical material models, boundary and initial conditions. The codes were used to simulate three different geometries: a thin wall, hollow cylinder and twin-cantilever part. The coupon parts were then manufactured with Inconel-625. The residual stresses in these parts were measured using X-ray diffraction as well as neutron beam diffraction at NIST. The stress measurements for the two technologies are compared. The pragmatic stress prediction method enabled predictions of the multi-centimeter scale parts using desktop computer workstations in only a few hours for each coupon. The results of the simulated stress predictions compared favorably with the measured stresses even though thermally lumped layers were employed. Finally, a two-meter scale nozzle was simulated using ANSYS Additive. The simulations were used to examine the build orientation trade-space with respect to resulting geometric deformation. The predicted deformations were compared to measurements of an actual subscale part manufactured with direct energy deposition.

pragmatic method↗

IMPACT User Experience

NASA Human Research Project (HRP) and Exploration Medical Capabilities (ExMC) team identified a need to implement a human-centered design approach for a computational tool that performs detailed trade space analysis and research prioritization, known as Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT). IMPACT processes numerous parameters such as space vehicle design, mission objectives, evacuation capability, medical events, and mission constraint, including but not limited to; duration, mass, volume, equipment, and medical capability, each with complex and interconnected relationships. The ability for users to navigate through these complexities and provide an intuitive report is critical to aiding stakeholders in the decision-making process of future missions. In this presentation we will discuss how the IMPACT team has applied human-centered design strategies to improve system usability by modelling human-system integration (i.e., task analysis) with the MagicDraw SysML modelling application and performing A/B testing of user interface prototypes.

S Ozbek↗

Long -Term Architecture Development For The Moon And M

Developing an enterprise-level architecture encompassing future human-robotic science and exploration at the Moon and Mars requires a visionary approach that ensures NASA is responsive to national priorities and global science and technology advancement objectives. While the initial capabilities needed to return humans to the Moon may be well understood, NASA is still formulating a long-term infrastructure at the Moon and working to narrow the trade space for the first human missions to Mars. This paper will focus on the formulation and current status of engineering and design applications for a long-term and robust lunar architecture that will implement the Artemis Base Camp concept, including pre-formulation activities and elements currently in formulation. Authors will demonstrate how the Moon-to-Mars campaign approach fosters commonality of requirements and standards across individual mission elements, as well as multi-destination systems and operations, to reduce risk and encourage healthy competition in the growing space market. Among the Artemis Base Camp elements discussed will be multiple surface mobility elements, a fixed, anchoring surface habitat, fission surface power, and an in-situ resource development pilot plant. The narrative will clearly illustrate the direct evolution of the base camp elements to a minimal Mars architecture concept, and also outline unique development efforts that will be required in the next decade to make it possible to send humans to the Red Planet as early as the 2030s.

Greg Chavers↗

Thermal Management System Trade Study for SUSAN Electrofan Aircraft

Thermal management of power system components is one of the barriers identified towards the implementation of Electrified Aircraft Propulsion architectures. This paper documents the preliminary results of a trade space exploration of thermal management systems conducted for a new National Aeronautics and Space Administration regional transport aircraft concept called the SUbsonic Single Aft eNgine (SUSAN) Electrofan. Traditional methods of thermal management are evaluated alongside newer methods, which are still in development. Mass, power, and drag for traditional liquid / air heat exchangers were calculated, along with mass and area of oscillating heat pipes for outer mold line cooling. An initial assessment of the feasibility of using the fuel as part of the thermal management system was also conducted by evaluating the temperature over the full flight profile. Preliminary results and future work are discussed.

Nic Heersema↗

Initial Regulatory and Certification Approach for the SUSAN Electrofan Concept

New aircraft concepts and associated technologies are required to meet emerging environ-mental impact goals, while still meeting established airworthiness certification standards and regulations. The SUbsonic Single Aft eNgine (SUSAN) Electrofan is one of these concepts, utilizing a single aft-mounted engine, electrified aircraft propulsion, and an emergency backup battery. This paper explores the current certification and regulatory barriers to this novel aircraft design and the potential methods for adapting certification and regulatory requirements for the SUSAN Electrofan concept. Although some certification requirements, such as the Extended Operations regulations for continued operation after the loss of an engine, can be met with only minor changes, other requirements require modifications to the regulations or the aircraft concept for compliance. Early insight to the certification approach for the SUSAN concept, while the design is still undergoing trade space exploration, allows the development of the aircraft alongside any modifications to certification standards.

SUSAN Electrofan↗

Electrical System Trade Study for SUSAN Electrofan Concept Vehicle

The SUSAN Electrofan Aircraft concept is a subsonic regional jet transport aircraft that utilizes a single turbofan engine and Electrified Aircraft Propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. This paper is a trade space exploration of the electrical system for the concept aircraft, including possible system architectures, and a review of the specific powers and efficiencies required for the electrical components to realize the EAP system.

Joseph M Haglage↗

High-Fidelity Aerodynamic Analysis and Optimization of the SUSAN Electrofan Concept

The Subsonic Single Aft Engine (SUSAN) Electrofan is a new single-aisle regional jet class transport aircraft being studied by NASA, which benefits from reduced fuel consumption through a reduction in the number of hydrocarbon fuel-burning engines from two to one. This is achieved through a hybrid-electric system architecture, where a series of generators are used to extract power from a fuel-consuming tail cone thruster to drive electric propulsors mounted on the wings. To support the development of these propulsion systems, which involve high levels of propulsion-airframe integration, this paper presents high-fidelity analyses through computational fluid dynamics (CFD) simulations provided by the Launch Ascent and Vehicle Aerodynamics (LAVA) framework, which also includes capabilities for modeling the effect of active propulsors. A trade space exploration is performed to investigate the advantages of several wing mounted distributed electric propulsion system configurations, including over-wing, under-wing, and trailing-edge arrangements. For the aft fuselage propulsor, focus is on the sizing of the inlet, core, and bypass ducts. High-fidelity aerodynamic shape optimization is also used to help minimize the inlet distortion intensity experienced by the aft propulsor fan through a reshaping of the fuselage.

CAS↗

Conceptual Exploration of Aircraft Configurations for the SUSAN Electrofan

This paper presents an aircraft configuration trade space exploration for NASA’s SUbsonicSingle Aft eNgine (SUSAN) Electrofan, which is a 180 passenger regional class transport aircraftthat utilizes electrified aircraft propulsion and advanced propulsion airframe integrationtechnologies to enable reduced fuel consumption and emissions. At its core is a hydrocarbonfuel-consuming aft fuselage propulsor that produces 35% of the total thrust while generatingpower to drive wing-mounted electric propulsors, which produce the remaining 65% thrust.This power is extracted from the aft fuselage propulsor via a set of generators and is managedwith the help of a rechargeable battery, classifying the propulsion system as hybrid electric.Investigated in this work are different aft fuselage propulsor concepts, several wing propulsorconfigurations, and different types of stability and control strategies that can be accommodatedby this hybrid electric system architecture, with an emphasis on aircraft performance. Resultsobtained using a low-order multidisciplinary design and analysis framework demonstrate thateven with a subset of the advanced technologies that are being considered for the SUSANElectrofan, significant improvements to fuel efficiency can be achieved.

CAS↗

A Concept for the Deployment of a Large Lunar Crater Radio Telescope Using Teams of Tethered Robots

Kilometer-scale craters on the far side of the Moon have unique potential as future locations for large radio telescopes, which can observe the universe at wavelengths and frequencies (> 10 m, < 30 MHz) not possible with conventional Earth or orbital-based approaches. Distinct advantages of building a Lunar Crater Radio Telescope (LCRT) on the far side include i) isolation from radio noise due to the Earth’s ionosphere, orbiting satellites, and the Sun, ii) days of uninterrupted dark/cold sky viewing during lunar night, and iii) terrain geometry naturally suited for constructing the largest mesh antenna structure in the Solar System. A key challenge to constructing LCRT on the Moon is related to the complexity of deploying a 1-km diameter antenna and hanging receiver within a lunar crater whose diameter, depth, and slope are 3-5 km, 1 km, and ~30 degrees respectively. In this paper, we first evaluate the trade space for deploying a large, complex structure within a crater, and then provide a more detailed concept evaluation of our favored approach, which employs coordinated teams of tethered rovers to extract and suspend a folded antenna from a lander at the base of a crater. NASA’s Jet Propulsion Laboratory in collaboration with California Institute of Technology (Caltech) have developed a novel robotic system for accessing extremely steep terrains; the Axel rover is a two-wheeled rugged terrain vehicle that is supported by an electro-mechanical tether that provides power, data, and tensile support from a top-side anchor location. Recently, a pair of Axel robots have been used in a DuAxel configuration that allows for four-wheel driving and repeated passive anchoring at different locations. The DuAxel system has unique advantages for deploying an LCRT antenna, including the ability to deploy from a lander near a crater, drive a distance to the crater rim to deploy an Axel, and later, retract the deployed Axel in order to sequentially lift up sections of the antenna. Our proposed concept involves delivering a packaged antenna and receiver to the bottom-center of a crater floor on a lander, then later sending a team of multiple DuAxel rovers to retrieve guide wires from the lander, which are pulled to the top of the crater. We explore this concept in detail and provide some initial quantitative analysis to demonstrate the feasibility of our system with respect to the spatial and mass properties of the antenna as juxtaposed to DuAxel capabilities. Finally, we outline next steps towards validating our concept on the way to a future lunar deployment opportunity.

Hallinan, Greg↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

Significant progress has been made to NASA’s Moon to Mars campaign over the last several years, which drives changes to the agency’s current human exploration strategy. With Strategic Analysis Cycle 2021 (SAC21) the team was asked to consider new areas of the trades space not fully understood in the past. Specific to the Mars Ascent Vehicle (MAV), the team was asked to consider a concept based on a nitrogen tetroxide (NTO) and mono-methyl hydrazine (MMH) two stage propulsion system which would utilize surface propellant transfer, as opposed to In Situ Resource Utilization (ISRU). The vehicle supports two crew members from the surface up to 84 hours nominally. This paper presents further details of the current MAV reference design used in NASA’s SAC21, including descriptions of the operations, configuration, subsystem design, and vehicle mass summary. Additional detail is also provided on rational that drove specific design changes since the last MAV concept, published in 2019.

Douglas J. Trent↗

VERNE: Revealing the Mysteries and Histories of Venus

Introduction: The three Venus missions that were recently selected for upcoming flight (VERITAS, DAVINCI+, and EnVision) will be incredibly valuable to our understanding of Venus’ history, geology, and atmosphere. However, even once completed, key gaps in our knowledge of Venus, and more generally the formation and active processes on rocky, Earth-like planets, will still persist. Remaining questions include 1) how global intrinsic magnetic fields might be maintained on rocky worlds, and how they could then go extinct, and 2) what role atmospheric sulfur chemistry plays in climates of Earth-like planets, which is an increasingly timely subject as Earth’s own atmospheric sulfur content is climbing due to human activity. These questions require in-situ observations from Venus’ cloud deck, at the altitudes at which the UV absorber exists. The Venus Environment Research and Novel Exploration (VERNE) mission will address these questions with an aerial platform that will drift around the equatorial region of the planet for 9 days. VERNE will collect data to determine the identity of the mysterious UV absorber, while also taking magnetic field measurements over the tesserae, the regions on Venus that are most likely to retain remanent crustal magnetization, in order to understand the potential role of a past intrinsically-generated global magnetic field on Venus. Mission Objectives: The two major science objectives that drive the VERNE mission are: 1) Determine the identity of the Venusian unknown ultraviolet absorber(s). First observed approximately a century ago [1], the composition of Venus’ ultraviolet (UV) absorber is one of the oldest mysteries in Venus atmospheric chemistry [2,3]. While several candidate UV absorbers (mostly sulfur species) have been proposed, no consensus has been reached on its composition and its specific interactions with the atmosphere. Determining the identity of the UV absorber will aid climate models by showing how and where incident solar energy is absorbed by the atmosphere and make progress towards understanding the chemical and energetic processes taking place above Venus’ upper cloud deck [4]. 2) Determine if Venus retains evidence of a past, internally-generated magnetic field. While Venus does not currently have an intrinsically-generated magnetic field, evidence for the existence of a past field on Venus and a timeline of its decay will fill in a more holistic picture of the evolution of Venus’ geological record and atmosphere. As the oldest geologic units on the surface, Venus’ tesserae may still have remanent crustal magnetization signatures within the rocky composition [5]. In any case, the signatures detected will provide insight into Venus’ past geological and core dynamo activity. Mission Summary: VERNE includes a 3-part flight system made up of 1) an entry system with a HEEET (Heatshield for Extreme Entry Environment Technology) aeroshell, 2) an orbiter for data relay, and 3) an in-situ balloon and gondola. After entry into Venus’ atmosphere, the balloon will be deployed within the upper cloud deck, at an altitude of 62 km, over a tesserae region. The in-situ data collection will last for the duration of 2 full circumnavigations of the planet, which will take ~9 days. Instrumentation Suite: The four instruments that comprise VERNE’s instrument payload will enable the identification of the unknown UV absorber and the detection of remanent crustal magnetization if it exists in the tesserae. The proposed instrument suite cycle during mission operations is shown in Fig. 1. The four instruments are described below: 1) Adams (ion neutral mass spectrometer) has a range of 18-257 AMU and will detect and distinguish the mixing ratios of O₂, H₂O, H₂SO₄, S, S₂, S₃, S₄, S₅, S₆, S₇, S₈, SO, SO₂, OSSO, SO₃, Cl₂, FeCl₃ and other trace sulfur and organic species. The spatial (longitudinal) and temporal (day/night) variations will be observed throughout 2 circumnavigations with a sample cadence of 12 minutes. 2) Shelley (nephelometer) will determine the size distribution of the aerosols (0.4 to 36 um) in the atmosphere. With a size resolution of <0.7 um, it can determine which mode of H2SO4 is present and characterize the large (>30 um) organic particles previously detected by the Venera and Galileo missions [6,7]. 3) Herbert (UV imager) will measure UV radiance at 283 nm (the wavelength of SO2 absorption) and 365 nm (the unknown part of the absorber). UV images will be taken concurrently with the INMS and nephelometer to correlate UV absorption with abundances of the UV absorber species. 4) Vonnegut (magnetometer) has a range of >600 nT and a precision and accuracy of 1 nT. If magnetized by a past field, the crust may have retained a magnetization of up to 3 A/m2 [5]. With a noise floor of 10 nT, the magnetometer will be able to detect RCM from an altitude of 62 km, even if the thickness of the magnetized crust is just 1 km (Fig. 2). Mission Concept Design: VERNE will be launched with a mass of 3300 kg in an intermediate-high performance class vehicle with a 4-m fairing. The 475-day mission includes 466 days for the cruise, coasting, and orbit initialization phases before entry, descent, and balloon deployment. During the 9-day science phase, the aerial platform will make 2 circumnavigations of the planet at an altitude of 62 km. The INMS and the nephelometer will acquire data for 2 hours during the daytime and nighttime during each circumnavigation, while the UV imager will be on for the duration of the daytime, and the magnetometer will be operational throughout the entirety of the science phase. Data will be stored and processed with the JPL-designed Sphinx command and data handling system. Data will be sent from the balloon to the orbiter using an S-band relay link, stored on the orbiter, and then forwarded to Earth where it will be received by the DSN. Conclusion: VERNE will fill key gaps in our understanding of the history and ongoing processes related to the geology and atmosphere of Venus and rocky worlds in general. Even with adequate flight system contingencies and expected costs below the $900M New Frontiers cost cap, VERNE is not without its risks and challenges. Further trade spaces to explore include 1) using solely battery power vs. including solar panels to increase the mission duration and 2) investigating the use of lightweight materials and 3D-printed structures to reduce the gondola mass, among others. Acknowledgments: We would like to thank the JPL Planetary Science Summer School, especially our mentors Troy Hudson, Karl Mitchell, and Leslie Lowes, as well as our Team-X study lead Al Nash and the members of Team-X. We’d additionally like to thank our review panel for asking insightful questions and providing valuable feedback. References: [1] Ross, F. E. (1928) Astrophysical J., 68, 57-92. [2] Rossow, W. B. et al. (1980) J. Geophysical Research, 85, 8107-8128. [3] Pinto, J. P. et al. (2021) Nature Communications, 12, 175. [4] Titov, D. V. et al. (2007) Cosmic Research, 21, 401. [5] O’Rourke, J. et al. (2019) Geophysical Research Lett., 46, 5768–5777. [6] Limaye, S. S. et al. (2018) Astrobiology, 18(9), 1181-1198. [7] Grinspoon, D. H. et al. (2013) Planetary and Space Sci., 41(7), 515-542. [8] Parker, R. L. (2003) J. Geophysical Research, 108, 5006. *The cost information contained in this document is of a budgetary and planning nature and is intended for informational purposes only. It does not constitute a commitment on the part of JPL and/or Caltech.

H Alpert↗