Power Grab: Exploring Grid Enhancing Technologies (GETs) Maximum Reliable Transmission
Power Grab: Exploring Grid Enhancing Technologies (GETs) Maximum Reliable Transmission CNEE Webinar
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Power Grab: Exploring Grid Enhancing Technologies (GETs) Maximum Reliable Transmission CNEE Webinar
Adoption of plug-in electric vehicles (PEVs) has expanded over the last few years, yet introduction of PEV smart charging has been stalled due to barriers in communication, controls, and an unclear method for determining the value PEVs will bring to the grid. This project will consider the grid impact of a variety of future scenarios, including adoption of different vehicle types, proliferation of extreme fast charging (xFC), expanded adoption of distributed energy resources (DER), and multiple smart charge management approaches. This project will determine how PEV charging at scale should be managed to avoid negative grid impacts, allow for critical strategies and technologies to be developed, and increase the value for PEV owners, building managers, charge network operators, grid services aggregators, and utilities.
This project addresses several key barriers to implement the next generation demand response applications and provides a clear understanding of implementing hierarchical and standalone control using AMI data. Through this program, Eaton has developed and tested a meter-as-a-controller prototype with the help of other partners--- National Renewable Energy Laboratory (NREL), Electric Power Research Institute (EPRI), Pecan St Inc. (PSI), and Delaware Electric Cooperative (DEC). The controller can utilize residential controllable loads such as heating, ventilation, and air conditioner (HVAC), electric water heater and distributed energy resources like solar PV and battery energy storage systems for off-setting the demand that is required from the grid, thus providing reliable grid-services for demand reduction or peak shaving. The controller is also capable of coordinating the resources of the premises for better management and energy efficiency while meeting the comfort bound of the premises owner as quality-of-service. The development has been demonstrated in a three virtual-home setup at system performance lab of NREL with real appliances (HVAC, electric water heater, solar PV, and battery). The technology has also been proved through laboratory and field demonstration with successful interconnectivity (e.g., end-to-end communication and data exchange) between the residential appliances and utility through the RF network at Delaware Electric Co-op (DEC) in Delaware.
Abstract Not Provided
This presentation discusses a project to determine how plug-in electric vehicles (PEVs) charging at scale in two cities should be managed to avoid negative grid impacts. It also will allow critical strategies and technologies to be developed, and will increase the value for PEV owners, building managers, charge network operators, grid services aggregators, and utilities.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The utility grid is constantly evolving with new generation sources and diverse loads from backup generators, backup batteries, rooftop photovoltaics (PV), and flexible charging loads. Each of these technologies presents consumers with an opportunity to work with their local utility to promote grid stability, reliability, and affordability. Through a wide range of programs, utilities are incentivizing the use of these resources to benefit the grid. However, especially for devices with inverters that supply power back to the grid, it is important that these assets comply with local grid codes to ensure human safety, power quality, and grid reliability. One of the most promising of these new technologies is the bidirectional electric vehicle (EV) coupled with bidirectional electric vehicle supply equipment (EVSE). This report introduces the technologies that enable bidirectional charging and how these systems operate. It then outlines the necessary interconnection codes and industry standards that govern the operations of grid-tied inverters, including those in bidirectional charging. A key challenge is then outlined from the complex landscape of communication protocols and proprietary systems designed to coordinate these grid assets. Finally, a single gateway solution is proposed to harmonize communications between all assets across an entire site for a cohesive response to grid codes and utility programs that is flexible enough to support a range of market options.
Clean Grid Vision: A U.S. Perspective aims to present a range of possible pathways for future grid development and call attention to some common trends. It focuses on the lessons learned through NREL’s studies of the U.S. power sector that have measured the impacts of high-penetration VRE and have tested strategies for enhancing grid flexibility and reliability. As such, this report is limited in its scope and does not attempt to review or summarize all grid integration literature. While it refers to relevant external literature to provide context when needed, this report is primarily a summary of the National Renewable Energy Laboratory’s (NREL’s) research in the past 5 years on five key topics: grid planning and operation, grid reliability at the distribution level, grid reliability at the transmission level, demand-side resources, and power markets—each corresponds to a chapter in this report. The main insights of the report are presented in this executive summary.
This presentation provides an overview of distributed energy resource management solutions to enable reliable and resilient distribution grids.
A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.
This paper proposes an improved model for the reliability assessment of power systems considering component failures of variable energy resources (VER). The inherent intermittency of VER such as solar photovoltaic (PV) and wind farms, along with their susceptibility to component failures, present significant challenges to reliable system operation. These issues, combined with power grid operation and network constraints, complicate the reliable operation of VER-integrated power systems. Here, to address these concerns, this paper introduces a reliability assessment framework that considers VER input variability, its impact on component availability, and their resulting impact on overall system reliability. Stochastic models based on discrete Markov processes are developed to incorporate variable irradiance, wind speeds, and their effects on PV and wind component failure rates. A next-event and state transition-based approach is then developed to integrate the stochastic models into a mixed-timing sequential Monte Carlo simulation framework for composite reliability assessment. Case studies on the RTS-GMLC system demonstrate the effectiveness of the proposed model in evaluating the reliability of VER-integrated systems.
Through Net Zero World, the National Renewable Energy Laboratory (NREL), the National Energy Secretariat of Argentina, La Pampa's Energy and Mining Secretariat, Pampetrol, and the Administracion Provincial de Energia de La Pampa (APELP) conducted an integrated analysis of the power system of the La Pampa province in Argentina. The study assessed the impact that solar and battery energy storage systems could have on the region grid's reliability and electricity costs, providing insights into long-term decarbonization strategies across Argentina. The analysis demonstrated that these systems are expected not only to help with decarbonization efforts but also to bolster grid resiliency, reduce line losses, and improve voltage regulation while lowering electricity costs. The paper offers a replicable framework for similar studies across other Argentine provinces, which could inform a national grid reliability plan and promote regional coordination. Such coordination will play a key role in supporting a nationwide clean energy transition as Argentina increases its share of renewable energy. By coordinating subnational energy plans with national strategies, Argentina can secure a resilient clean energy future, leveraging the substantial renewable resources available across its provinces.
JPL, in a partnership with an industrial consortium, is currently engaged in the investigation of reliability and quality issues if ball grid array (BGA) packages as they may be applied to space flight electronics. Performing tests to determine the solder joint reliability of assemblies using BGAs under temperature cycling has proved to be a real challenge for test engineers.
The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.
The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.