Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Efficient prediction of concentrating solar power plant productivity using data clustering

Concentrating solar power (CSP) plants convert solar energy to electricity and can be deployed with a thermal storage capability to shift electricity generation from time periods with available solar resource to those with high electricity demand or electricity price. Rigorous optimization of plant design and operational strategies can improve the market-competitiveness and commercial viability; however, such optimization may require hundreds of annual performance simulations, each of which can be computationally expensive when including considerations such as optimization of dispatch scheduling, sub-hourly time resolution, and stochastic effects due to uncertain weather or electricity price forecasts. This paper proposes a methodology to reduce the computational burden associated with simulation of electricity yield and revenue for CSP plants over a single- or multi-year period. Data-clustering techniques are employed to select a small number of limited-duration time blocks for simulation that, when appropriately weighted, can reproduce generation and revenue over a single year or within each year of a multi-year period. After selection of appropriate data features and weighting factors defining similarity between time-series profiles, the methodology captured annual revenue within 2.3%, 1.7%, or 1.2% using simulation of 10, 30, or 50 three-day exemplar time blocks, respectively, for each of three single-year location/weather/market scenarios and five plant configurations ranging from low to high solar multiple and storage capacity. When applied to multi-year datasets, the proposed methodology can capture inter-year variability that is unavailable from typical meteorological year (TMY) datasets while simultaneously requiring simulation of less than a single year of data.

14 SOLAR ENERGY↗

Secure mmWave Spectrum Sharing with Autonomous Beam Scheduling for 5G and Beyond

Spectrum Sharing (SS) has seen a renewed set of initiatives in 5G with the availability of shared and unlicensed spectrum bands that can be used by multiple cellular service providers and private cellular networks. Beam based transmission, instead of the traditional sector based transmission in conjunction with the spectrum agility of the 5G New Radio (NR) has brought new opportunities to optimized sharing of spectrum. Currently in the U.S., a centralized Spectrum Access Server (SAS) is used to co-ordinate spectrum sharing among networks sharing the same spectrum band. However, SAS becomes a focal point for security attacks and a performance bottleneck. In addition, SAS relies on an Environmental Sensor Network (ESN), separate from the 5G network. Without trusted spectral occupancy information, false reporting of spectrum sensing data can create sub-optimal and unfair spectrum usage. This paper summarizes our recent research findings in using a decentralized scheme for multiple networks to securely share spectrum with autonomous beam scheduling : 1) A new stochastic network framework based on Lyapunov Optimization approach is developed to optimize scheduling at the base stations; 2) Game theoretic (GT) approach is used to formulate the distributed scheduler; 3) Another distributed scheduler with Q-learning is presented that utilizes the Reinforcement Learning (RL) approach; 4) The performance and convergence rate of these distributed solutions to use shared and unlicensed spectrum are compared with existing solutions. Conditions under which the performance of these schedulers approach the theoretical upper bound, which is the performance possible with no interference among the operators sharing the spectrum, are presented; 5) The ability of a base station to use its own user equipment as sensors, for optimal spectrum sharing with base stations in other operator networks, is demonstrated to be an effective approach.

5G↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Adaptive job and resource management for the growing quantum cloud

As the popularity of quantum computing continues to grow, efficient quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis and optimization of job / resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing.This paper proposes optimized adaptive job scheduling to the quantum cloud taking note of primary characteristics such as queuing times and fidelity trends across machines, as well as other characteristics such as quality of service guarantees and machine calibration constraints. Key components of the proposal include a) a prediction model which predicts fidelity trends across machine based on compiled circuit features such as circuit depth and different forms of errors, as well as b) queuing time prediction for each machine based on execution time estimations. Altogether, this proposal is evaluated on simulated IBM machines across a diverse set of quantum applications and system loading scenarios, and is able to reduce wait times by over 3x and improve fidelity by over 40% on specific usecases, when compared to traditional job schedulers.

97 MATHEMATICS AND COMPUTING↗

Scalable Circuit Cutting and Scheduling in a Resource-constrained and Distributed Quantum System

Despite quantum computing's rapid development, current systems remain limited in practical applications due to their limited qubit count and quality. Various technologies, such as superconducting, trapped ions, and neutral atom quantum computing technologies are progressing towards a fault tolerant era, however they all face a diverse set of challenges in scalability and control. Recent efforts have focused on multi-node quantum systems that connect multiple smaller quantum devices to execute larger circuits. Future demonstrations hope to use quantum channels to couple systems, however current demonstrations can leverage classical communication with circuit cutting techniques. This involves cutting large circuits into smaller subcircuits and reconstructing them post-execution. However, existing cutting methods are hindered by lengthy search times as the number of qubits and gates increases. Additionally, they often fail to effectively utilize the resources of various worker configurations in a multi-node system. To address these challenges, we introduce FitCut, a novel approach that transforms quantum circuits into weighted graphs and utilizes a community-based, bottom-up approach to cut circuits according to resource constraints, e.g., qubit counts, on each worker. FitCut also includes a scheduling algorithm that optimizes resource utilization across workers. Implemented with Qiskit and evaluated extensively, FitCut significantly outperforms the Qiskit Circuit Knitting Toolbox, reducing time costs by factors ranging from 3 to 2000 and improving resource utilization rates by up to 3.88 times on the worker side, achieving a system-wide improvement of 2.86 times.

Kan, Shuwen [Fordham University]↗

Development of Prognostic Models Using Plant Asset Data

The recent growth of machine learning and artificial intelligence technologies provides opportunities for leveraging data-driven algorithms to address the problems of diagnostics and prognostics in the nuclear power industry. The use of machine learning and other statistical methods as prognostic models is of particular interest in the nuclear industry to accurately predict future equipment or plant state given a set of measurements. Such predictive capability will enable predictive assessment of component condition and remaining life and allow for condition-based predictive maintenance. The resulting optimization of maintenance scheduling and reduction in unnecessary maintenance activities will lower overall maintenance costs and improve the economics of nuclear power. This report discusses the various aspects of data processing and model development that are likely to influence the performance of prognostic models. Data from a boiling-water reactor was used to evaluate several prognostic models to identify key considerations for developing such models to predict data-driven plant state and equipment degradation condition. Preliminary results indicate the need for data sets that are relevant to the problem at hand and contain signatures that may be correlated to the prediction problem. Assuming such data exist, development of prognostic models using data-driven methods requires an understanding of the various sources of influence on the prediction accuracy (such as the model architecture, data preprocessing approaches, and potentially external factors influencing the equipment or plant system under assessment). Ongoing research is evaluating these factors in greater detail and examining techniques for calculating prediction uncertainty bounds.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Novel Ferritic-Martensitic Steels with Superior Creep Properties for Power Plant Applications

A creep resistant martensitic steel, CPJ-7, was developed with an operating temperature approaching 650°C. Subsequently, another creep resistant martensitic steel, JMP, was designed with the potential to operate at, or slightly above, 650°C. This report describes the development of these alloys from early iterations of CPJ steels to the final CPJ-7 formulation as well as the more heat resistant JMP steel formulation. The design originated from computational modeling for phase stability and precipitate strengthening using fifteen constituent elements. Approximately forty heats of CPJ and ten of JMP, each weighing ~7 kg, were vacuum induction melted. A computationally optimized heat treatment schedule was developed to homogenize the ingots prior to hot forging and rolling prior to final normalization and tempering. Overall, wrought and cast versions of CPJ-7 present superior creep properties when compared to wrought and cast versions of COST alloys for steam turbine and wrought and cast versions of P91/92 for boiler applications. For instance, the Larson Miller Parameter curve for CPJ-7 at 650°C almost coincides with that of COST E at 620°C. The prolonged creep life was attributed to slowing down the process of the destabilization of the MX and M 23 C 6 precipitates at 650°C. On the other hand, the cast version of CPJ-7 also revealed superior mechanical performance, well above commercially available cast 9% Cr martensitic steel or derivatives, especially for creep life at 650°C. The casting process employed slow cooling to simulate the conditions of a thick wall full-size steam turbine casing but utilized a separate homogenization step prior to final normalization and tempering. To advance the development of CPJ-7 for commercial applications, a process was used to scale up the production of the alloy using vacuum induction melting (VIM) and electroslag remelting (ESR), which underlined the importance of melt processing control of intentionally designed minor and trace elements in these advanced alloys. Following the work on CPJ-7, the JMP steels were designed with higher Co for increased solid solution strengthening, Si for oxidation resistance and increased W (with low Mo content) for matrix strength and stability as well as solid solution strengthening. The JMP steels showed increases in creep life compared to CPJ-7 between 118 to 150% at 650°C for testing at various stresses between 138 MPa and 207 MPa. On a Larson-Miller plot, the performance of the JMP steels surpasses that of state-of-the-art MARBN and other MARBN-type steels. The influence of various elements within the composition of the alloys on the microstructure and mechanical properties are discussed. This report presents approximately 420,000 h of in-house creep testing, the equivalent of almost 50 years of cumulative creep tests.

36 MATERIALS SCIENCE↗

Hardware Specification and Reference Design for the Low-Cost, Interoperable, User-Centric, Supervisory Controller Kit for Small and Medium Size Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems to manage the various building systems they have. Many of these buildings are small (< 50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper control systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the RTU’s heating and cooling setpoints, schedules, setbacks, and optimal start times can result in 20 to 25 percent reduction in electricity consumption in small and medium commercial buildings (SMBs). In addition, improving the demand flexibility of these buildings will result in additional cost savings for the building owner. To address the needs of the SMBs, the Department of Energy’s Building Technologies Office jointly funded Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to design, develop, test, and validate a low-cost, interoperable, user-centric, retrofit supervisory controller kit (SC-SMB) that can be used to continuously optimize energy consumption and deliver demand flexibility of SMBs, including all-electric buildings, and provide a means for maximizing decarbonization benefits. The team also includes industry partners Edo and Intellimation. Previously, the team drafted an SC-SMB system specification document (Goodman et al. 2023). This document describes a reference design of a low-cost supervisory control system for SMBs, including the various hardware components, software system, and an example implementation of the reference design. The final release of the reference design is planned for December 2025. Section 2.0 of the report documents the relevant building types that the SC-SMB system is suitable for. Section 3.0 documents the various hardware components, their function, cost, whether they are off-the-shelve, support standard communication, etc., and the software system. An example deployment in a 10,000-sf building with six rooftop units, a hot water heater, solar, and storage is described in Section 4.0. The planned next steps are described in Section 5.0, and references are listed in Section 6.0.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design Requirements and Software Specification for the Autonomous Energy Management Software System for Small Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems. Many of these buildings are small (<50,000 square feet), underserved, and use rooftop units for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the rooftop units heating and cooling set points, schedules, setbacks, and optimal start can result in 20 to 25 percent reduction in electricity consumption in small commercial buildings. In addition, improving demand flexibility of these buildings will result additional cost savings for the building owner. Therefore, the Department of Energy’s Building Technologies Office approved a project to address the needs for small commercial buildings. The project is led by Pacific Northwest National Laboratory (PNNL) with Intellimation LLC as the cooperative research and development agreement partner. The primary goal of the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, while providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage the vast experience of PNNL research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation, a company that plans to use it to scale their building energy efficiency (EE) and grid services offering. Widespread deployment of the AEMS system will improve the EE and demand flexibility of the building commercial building stock. It should also support cities and states in meeting their climate change mitigation goals. This document describes the various EE and grid service features of the AEMS system, infrastructure and data required to implement those features, and how the features should be automated. It also details how the various features will be tested and validated, including field validation. The document also details what flexibility the users have and how they will be able to leverage those capabilities exercise those. The intent is to create an AEMS system that would support scalable deployment, requires minimal configuration, and is easy to maintain over its expected lifespan. The initial alpha release of AEMS system is planned for March 2023, and the beta release is planned for the summer of 2023. The final release is planned for March 2024. Section 2 of the report documents the relevant building types that AEMS is suitable for. Section 3 documents EE features that will be supported. It will also include the data requirements, hardware requirements, implementation details, and how EE features will be tested and validated. Grid service features will be documented in section 4, including data requirements, hardware requirements, implementation details, and how the services will be tested and validated. Planned next steps are described in section 5.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design Requirements and Hardware Specification for the Low-Cost, Interoperable, User-Centric, Supervisory Controller Kit for Small and Medium Size Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems to manage the various building systems they have. Many of these buildings are small (< 50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper control systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the RTU’s heating and cooling setpoints, schedules, setbacks, and optimal start times can result in 20 to 25 percent reduction in electricity consumption in small and medium commercial buildings (SMBs). In addition, improving the demand flexibility of these buildings will result in additional cost savings for the building owner.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Effects of the installation and operation of jet-exhaust yaw vanes on the longitudinal and lateral-directional characteristics of the F-14 airplane

A wind tunnel investigation was conducted in the Langley 16-Foot Transonic Tunnel to determine the effects of the installation and use of jet exhaust yaw vanes on the longitudinal and lateral-directional characteristics of the F-14 aircraft. The model was tested at Mach numbers from 0.70 to 1.25 at angles of attack from 0 deg to 4.3 deg. Compressed air was used to simulate nozzle exhaust flow from jet off up to a nozzle pressure ratio of 8. The results of the investigation show that the yaw vanes can augment the rudders to provide directional control, but further investigation will be necessary to optimize the deflection schedule associated with the various nozzle power settings.

Reubush, David E.↗

Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

Momoh, James A.↗

Design of a Flush Airdata System (FADS) for the Hypersonic Air Launched Option (HALO) Vehicle

This paper presents a design study for a pressure based Flush airdata system (FADS) on the Hypersonic Air Launched Option (HALO) Vehicle. The analysis will demonstrate the feasibility of using a pressure based airdata system for the HALO and provide measurement uncertainty estimates along a candidate trajectory. The HALO is a conceived as a man-rated vehicle to be air launched from an SR-71 platform and is proposed as a testbed for an airbreathing hydrogen scramjet. A feasibility study has been performed and indicates that the proposed trajectory is possible with minimal modifications to the existing SR71 vehicle. The mission consists of launching the HALO off the top of an SR-71 at Mach 3 and 80,000 ft. A rocket motor is then used to accelerate the vehicle to the test condition. After the scramjet test is completed the vehicle will glide to a lakebed runway landing. This option provides reusability of the vehicle and scramjet engine. The HALO design will also allow for various scramjet engine and flowpath designs to be flight tested. For the HALO flights, measurements of freestream airdata are considered to be a mission critical to perform gain scheduling and trajectory optimization. One approach taken to obtaining airdata involves measurement of certain parameters such as external atmospheric winds, temperature, etc to estimate the airdata quantities. This study takes an alternate approach. Here the feasibility of obtaining airdata using a pressure-based flush airdata system (FADS) methods is assessed. The analysis, although it is performed using the HALO configuration and trajectory, is generally applicable to other hypersonic vehicles. The method to be presented offers the distinct advantage of inferring total pressure, Mach number, and flow incidence angles, without stagnating the freestream flow. This approach allows for airdata measurements to be made using blunt surfaces and significantly diminishes the heating load at the sensor. In the FADS concept a matrix of flush ports is placed in the vicinity of the aircraft nose, and the airdata are inferred indirectly from the measured pressures.

Whitmore, Stephen A.↗

Runway Operations Planning: A Two-Stage Heuristic Algorithm

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

Anagnostakis, Ioannis↗

Runway Operations Planning: A Two-Stage Solution Methodology

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.

Anagnostakis, Ioannis↗

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗