Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Flexible Residential Test Facility: Impact of Infiltration and Ventilation on Measured Heating Season Energy and Moisture Levels

Two identical laboratory homes designed to model existing Florida building stock were sealed and tested to 2.5 ACH50. Then, one was made leaky with 70% leakage through the attic and 30% through windows, to a tested value of 9 ACH50. Reduced energy use was measured in the tighter home (2.5 ACH50) in the range of 15% to 16.5% relative to the leaky (9 ACH50) home. Internal moisture loads resulted in higher dew points inside the tight home than the leaky home. Window condensation and mold growth occurred inside the tight home.

BA-PIRC↗

An Experimental Test Facility to Support Development of the Fluoride Salt Cooled High Temperature Reactor

The need for high-temperature (greater than 600 C) energy exchange and delivery systems is significantly increasing as the world strives to improve energy efficiency and develop alternatives to petroleum-based fuels. Liquid fluoride salts are one of the few energy transport fluids that have the capability of operating at high temperatures in combination with low system pressures. The Fluoride Salt-Cooled High-Temperature Reactor design uses fluoride salt to remove core heat and interface with a power conversion system. Although a significant amount of experimentation has been performed with these salts, specific aspects of this reactor concept will require experimental confirmation during the development process. The experimental facility described here has been constructed to support the development of the Fluoride Salt Cooled High Temperature Reactor concept. The facility is capable of operating at up to 700 C and incorporates a centrifugal pump to circulate FLiNaK salt through a removable test section. A unique inductive heating technique is used to apply heat to the test section, allowing heat transfer testing to be performed. An air-cooled heat exchanger removes added heat. Supporting loop infrastructure includes a pressure control system; trace heating system; and a complement of instrumentation to measure salt flow, temperatures, and pressures around the loop. The initial experiment is aimed at measuring fluoride salt heat transfer inside a heated pebble bed similar to that used for the core of the pebble bed advanced high-temperature reactor. This document describes the details of the loop design, auxiliary systems used to support the facility, the inductive heating system, and facility capabilities.

fluoride salt reactor FLiNaK↗

Monitoring Helium Cryogen Usage with iFix Software at IB1 Test Facility

At the IB1 facility of the Applied Physics and Superconducting Technology Directorate within the Cryogenic Division at Fermilab, liquid helium is essential to the testing activities. The test stands used require large amounts of Helium to test the thermal and superconducting cavities and magnets. The liquid helium that enters the test stand is monitored through a series of valves and controls to determine the start and stop for monitoring time. There are 3 phases of cryogen usage that must be considered for each stand, cooldown, warming and overnight mode. With a new system in place, cold hour tracking will be more objective and precise within each test stand ensuring better calculations for user s fees that will provide funding for the replenishment of helium and continual operation at IB1.

Trillo, Angelica↗

14 MeV DT Neutron Test Facility at the Sandia Ion Beam Laboratory

This report documents work done at the Sandia Ion Beam Laboratory to develop a capability to produce 14 Me neutrons at levels sufficient for testing radiation effects on electronic materials and components. The work was primarily enabled by a laboratory directed research and development (LDRD) project. The main elements of the work were to optimize target lifetime, test a new thin- film target design concept to reduce tritium usage, design and construct a new target chamber and beamline optimized for high-flux tests, and conduct tests of effects on electronic devices and components. These tasks were all successfully completed. The improvements in target performance and target chamber design have increased the flux and fluence of 14 MV neutrons available at the test location by several orders of magnitude. The outcome of the project is that a new capability for testing radiation-effects on electronic components from 14 MeV neutrons is now available at Sandia National Laboratories. This capability has already been extensively used for many qualification and component evaluation and development tests.

36 MATERIALS SCIENCE↗

Status and Planned Experiments of the Hiradmat Pulsed Beam Material Test Facility at CERN SPS

HiRadMat (High Irradiation to Materials) is a facility at CERN designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies (e.g. vacuum windows, shock tests on high power targets, collimators) can be tested. The beam parameters (SPS 440 GeV protons with a pulse energy of up to 3.4 MJ, or alternatively lead/argon ions at the proton equivalent energy) can be tuned to match the needs of each experiment. It is a test area designed to perform single pulse experiments to evaluate the effect of high-intensity pulsed beams on materials in a dedicated environment, excluding long-time irradiation studies. The facility is designed for a maximum number of 1016 protons per year, in order to limit the activation of the irradiated samples to acceptable levels for human intervention. This paper will demonstrate the possibilities for research using this facility and go through examples of upcoming experiments scheduled in the beam period 2015/2016.

43 PARTICLE ACCELERATORS↗

Component Test Facility (Comtest) Phase 1 Engineering For 760°C (1400°F) Advanced Ultrasupercritical (A-USC) Steam Generator Development

The Babcock & Wilcox Company (B&W) performed a Pre-Front End Engineering Design (Pre-FEED) of an A-USC steam superheater for a proposed component test program achieving 760°C (1400°F) steam temperature. This would lead to follow-on work in a Phase 2 and Phase 3 that would involve detail design, manufacturing, construction and operation of the ComTest. Phase 1 results have provided the engineering data necessary for proceeding to the next phase of ComTest. The steam generator superheater would subsequently supply the steam to an A-USC prototype intermediate pressure steam turbine. The ComTest program is important in that it will place functioning A-USC components in operation and in coordinated boiler and turbine service. It is also important to introduce the power plant operation and maintenance personnel to the level of skills required and provide the first background experience with hands-on training. The project will provide a means to exercise the complete supply chain events required in order to practice and perfect the process for A-USC power plant design, supply, manufacture, construction, commissioning, operation and maintenance. Representative participants will then be able to transfer knowledge and recommendations to the industry. ComTest is conceived in the manner of using a separate standalone plant facility that will not jeopardize the host facility or suffer from conflicting requirements in the host plant’s mission that could sacrifice the nickel alloy components and not achieve the testing goals. ComTest will utilize smaller quantities of the expensive materials and reduce the risk in the first operational practice for A-USC technology in the United States. Components at suitable scale in ComTest provide more assurance before putting them into practice in the full size A-USC demonstration plant.

20 FOSSIL-FUELED POWER PLANTS↗

Bunch Extinction Measurements at PIP-II Injector Test Facility

The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗

Cryogenic system for the Energy Recovery Linac and vertical test facility at BNL

A small cryogenic system and warm helium vacuum pumping system provides cooling to either the Energy Recovery Linac's (ERL) cryomodules that consist of a 5-cell cavity and an SRF gun or a large Vertical Test Dewar (VTD) at any given time. The cryogenic system consists of a model 1660S PSI piston plant, a 3800 liter storage dewar, subcooler, a wet expander, a 50 g/s main helium compressor, and a 170 m{sup 3} storage tank. A system description and operating plan of the cryogenic plant and cryomodules is given. The cryogenic system for ERL and the Vertical Test Dewar has a plant that can produce the equivalent of 300W at 4.5K with the addition of a wet expander 350 W at 4.5K. Along with this system, a sub-atmospheric, warm compression system provides pumping to produce 2K at the ERL cryomodules or the Vertical Test Dewar. The cryogenic system for ERL and the Vertical Test Dewar makes use of existing equipment for putting a system together. It can supply either the ERL side or the Vertical Test Dewar side, but not both at the same time. Double valve isolation on the liquid helium supply line allows one side to be warmed to room temperature and worked on while the other side is being held at operating temperature. The cryogenic system maintain the end loads from 4.4K to 2K or colder depending on capacity. Liquid helium storage dewar capacity allows ERL or the VTD to operate above the plant's capacity when required and ERL cryomodules ballast reservoirs and VTD reservoir allows the end loads to operate on full vacuum pump capacity when required.

43 PARTICLE ACCELERATORS↗

Gearbox high-speed-stage bearing slip induced by electric excitation in a test facility

The goal of this paper is to investigate the behaviour of the high-speed stage of a wind turbine gearbox during transient grid-loss events triggered at different power levels in a full-scale nacelle dynamometer test. The gear mesh behaviour and the bearing roller slip during these events are characterized by strain measurements placed in the gear teeth roots and embedded in the outer rings of the tapered roller bearing locating pair. From our experiments, we conclude that the high-speed stage experiences a multidimensional loading consisting of bending and torsional deformation during the transient event. This loading propagates throughout the gearbox and results in unfavourable loading conditions at the bearing that have the potential to go beyond the preload during the torque reversals that occur during the grid-loss event. During the torque reversal, roller slip can occur in the bearings. It is observed that the slip behaviour is directly linked to the initial power level of the generator. Electrically induced excitation that typically leads to dynamic torque events can therefore cause mechanical gearbox degradation.

17 WIND ENERGY↗

Use of system code to estimate equilibrium tritium inventory in fusion DT machines, such as ARIES-AT and components testing facilities

ITER is under construction and will begin operation in 2020. This is the first 500 MWfusion class DT device, and since it is not going to breed tritium, it will consume most of the limited supply of tritium resources in the world. Yet, in parallel, DT fusion nuclear component testing machines will be needed to provide technical data for the design of DEMO. It becomes necessary to estimate the tritium burn-up fraction and corresponding initial tritium inventory and the doubling time of these machines for the planning of future supply and utilization of tritium. With the use of a system code, tritium burn-up fraction and initial tritium inventory for steady state DT machines can be estimated. Estimated tritium burn-up fractions of FNSF-AT, CFETR-R and ARIES-AT are in the range of 1–2.8%. Corresponding total equilibrium tritium inventories of the plasma flow and tritium processing system, and with the DCLL blanket option are 7.6 kg, 6.1 kg, and 5.2 kg for ARIES-AT, CFETR-R and FNSF-AT, respectively.

99 GENERAL AND MISCELLANEOUS↗

DOSE PROFILE MODELING OF IDAHO NATIONAL LABORATORY’S ACTIVE NEUTRON INTERROGATION TEST FACILITY

A new research and development laboratory has been commissioned at Idaho National Laboratory for performing active neutron interrogation research and development. The facility is designed to provide radiation shielding for DT fusion (14.1 MeV) neutron generators (2 x 108 neutrons per second), DD fusion (2.5 MeV) neutron generators (up to 2 x 106 neutrons per second), and 252Cf spontaneous fission neutron sources (6.7 x 107 neutrons per second, 30 micrograms). Shielding at the laboratory is comprised of modular concrete shield blocks 0.76 m thick with tongue-in-groove features to prevent radiation streaming, arranged into one small and one large test vault. The larger vault is designed to allow operation of the DT generator and has walls 3.8 m tall, an entrance maze, and a fully integrated electrical interlock system; the smaller test vault is designed for 252Cf and DD neutron sources and has walls 1.9 m tall and a simple entrance maze. Both analytical calculations and numerical simulations were used in the design process for the building to assess the performance of the shielding walls and to ensure external dose rates are within required facility limits. Dose rate contour plots have been generated for the facility to visualize the effectiveness of the shield wall and entrance maze and to illustrate the spatial profile of the radiation dose field above the facility and the effects of skyshine around the vaults.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Updates to the Generation of Physics Data Inputs for MAMMOTH Simulations of the Transient Reactor Test Facility - FY2016

The INL is currently evolving the modeling and simulation (M&S) capability that will enable improved core operation as well as design and analysis of TREAT experiments. This M&S capability primarily uses MAMMOTH, a reactor physics application being developed under Multi-physics Object Oriented Simulation Environment (MOOSE) framework. MAMMOTH allows the coupling of a number of other MOOSE-based applications. This second year of work has been devoted to the generation of a deterministic reference solution for the full core, the preparation of anisotropic diffusion coefficients, the testing of the SPH equivalence method, and the improvement of the control rod modeling. In addition, this report includes the progress made in the modeling of the M8 core configuration and experiment vehicle since January of this year.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Laser Tracker Test Facility at SLAC - Progress Report

Physics experiments at SLAC require high accuracy positioning, e. g. 100 {micro}m over a distance of 150 m or 25 {micro}m in a 10 x 10 x 3 meter volume. Laser Tracker measurement systems have become one of the most important tools for achieving these accuracies when mapping components. In order to improve and get a better understanding of laser tracker measurement tolerances we extended our laboratory with a rotary calibration table (Kugler GmbH) providing an accuracy of better than 0.2 arcsec. This paper gives an overview of the calibration table and its evaluation. Results of tests on two of our Laser Trackers utilizing the new rotary table as well as the SLAC interferometer bench are presented.

43 PARTICLE ACCELERATORS↗

First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility

The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.

43 PARTICLE ACCELERATORS↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

Ultra-High Operation Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing: Test Facility & Performance Evaluations

Solar Heat for Industrial Processes (SHIP) cavity receivers are capable of generating electricity or industrial process heat by absorbing thermal energy from solar radiation, focused on a small area. The concentration of solar radiation on the small area of the receiver enables the achievement of high temperatures (ranging from 400°C to 1,100°C) of a working fluid, thus making the SHIP technology thermodynamically comparable with conventional power plants. A volumetric receiver consists of a porous structure-generally made of silicon carbide or metal, which absorbs solar radiation and converts it into heat energy. Heat energy from the porous materials is then transferred to the fluid following through them. A volumetric receiver acts as a convective heat exchanger, transferring heat to the fluid through convection. Open-loop volumetric receivers work with air at atmospheric pressure and are suitable for single-cycle or multi-cycle energy plants. A Model Based Systems Engineering (MBSE) approach was used to develop a test bed at Sandia national Laboratories (SNL) capable of demonstrating an open-loop volumetric air receiver developed by General Electric Aerospace (GE Aerospace). This paper presents the development of the various MBSE methods, test bed, and testing operations for the GE air receiver, which was experimentally demonstrated to achieve 1,350°C for over 3 hours of operation and an approximate 70% receiver efficiency. By being able to achieve such high temperatures >1,000°C, this work provides the potential to support many SHIP industrial use cases.

14 SOLAR ENERGY↗

Advanced Characterization of Fuel-cladding Chemical Interaction between U-10Zr Fuel and HT9 Cladding Tested in Fast Flux Test Facility

Fuel cladding chemical interaction (FCCI) can greatly accelerate the cladding failure. However, due to the limited space in a fuel cladding assembly, it is historically challenging to gain an mechanistical understanding of the formation mechanism of FCCI and its influence on fuel and cladding performance. With the imminent need to qualify U-10Zr based metallic fuel cladded by HT-9 for advanced reactors demonstration project, it is of vital importance to use advanced characterization method to study FCCI in a unprecedent detailed manner and gain better mechanism understanding of FCCI. Mechanistic Fuel Failure (MFF) series of prototypic fuel elements irradiated in FFTF [1, 2] provides the best samples to study FCCI since the MFF-series assemblies had an axial fuel height the same as proposed length by industry partners. Jason et al. [3] has performed preliminary post-irradiation examination on a MFF fuel pin sample, which was extracted from the HT9 cladded U-10at.%Zr MFF-3 pin MFF-3 pin (#193045) at an axial location of X/L = 0.98. This sample has a peak burnup of 5.7 at.% and peak inner cladding temperature (PICT) of around 615 °C during in-core testing. Scanning electron microscope examination has identified visible FCCI region on more than half of the HT9 circumference [3]. The most striking feature are grain boundary attacking by apparently lanthanides (Lns) rich phase. However, SEM cannot provide accurate assessment of phase and concentration of grain boundary phases and prevented a better understanding of the formation mechanism of such attach. This study, by pairing transmission electron microscope (TEM) characterization and atom probe tomography (APT) techniques with in-situ micro-tensile testing in scanning electron microscope (SEM), aims at gaining in-depth understanding on the formed FCCI region. The identified FCCI region roughly consists of multilayers as illustrated in Figure 1 (c). The main findings are: (1) layer-B shows observable lanthanides (Lns) infiltration along grain boundaries and mechanical softening due to FCCI- and irradiation-induced microstructural and microchemistry changes, particularly the recovery of martensitic lath structure and dissolution of pre-existing M23C6 together with the formation of coarsened Laves phases, (Fe, Cr)2(Mo, W); (2) layer-C is Fe depleted but Lns significantly enriched, becoming very brittle; (3) layer-D is mainly composed of UFe2 and Lns; (4) three FCCI-induced intermetallic U-Fe-Zr phases, ? (Fe0.5Zr0.32U0.18), e (Fe0.3Zr0.4U0.3), ? (Fe0.06Zr0.23U0.71), were identified near layer-E; (5) the ? (Fe0.5Zr0.32U0.18) phase was characterized to be a face centered cubic (FCC) crystal structure. These results will help to better understanding the governing mechanism of FCCI and facilitating the development of theoretical model for assessing the performance of metallic fuel and cladding integrity.

36 MATERIALS SCIENCE↗