Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operational results from the LHC luminosity monitors

The luminosity monitors for the high luminosity regions in the LHC have been operating to monitor and optimize the luminosity since 2009. The device is a gas ionization chamber inside the neutral particle absorber 140 m from the interaction point and monitors showers produced by high energy neutral particles from the collisions. It has the ability to resolve the bunch-by-bunch luminosity as well as to survive the extreme level of radiation in the nominal LHC operation. We present operational results of the device during proton and lead ion operations in 2010 and make comparisons with measurements of experiments. The Large Hadron Collider (LHC) at CERN can accelerate proton and lead ion beams to 7 TeV and 547 TeV and produce collisions of these particles. Luminosity measures performance of the LHC and is particularly important for experiments in high luminosity interaction points (IPs), ATLAS (IP1) and CMS (IP5). To monitor and optimize the luminosities of these IPs, BRAN (Beam RAte Neutral) detectors [1, 2] have been installed and operating since the beginning of the 2009 operation [3]. A neutral particle absorber (TAN) protects the D2 separation dipole from high energy forward neutral particles produced in the collisions [4]. These neutral particles produce electromagnetic and hadronic showers inside the TAN and their energy flux is proportional to the collision rate and hence to the luminosity. The BRAN detector is an Argon gas ionization chamber installed inside the TANs on both sides of the IP1 and IP5 and monitors the relative changes in the luminosity by detecting the ionization due to these showers. When the number of collisions per bunch crossing (multiplicity) is small, the shower rate inside the TAN is also proportional to the luminosity. Hence, the detector is designed to operate by measuring either the shower rate (counting mode for low and intermediate luminosities) or the average shower flux (pulse height mode for high luminosities). The detector is also designed (1) to survive the extreme level of radiation ({approx}1 GGy in the nominal condition), (2) to resolve the shower from each bunch crossing (40 MHz in the nominal condition) and measure the bunch-by-bunch luminosities, and (3) to have four independent square shaped channels, each occupying a quadrant, making the detector sensitive to the crossing angle [1, 2]. During the proton operation in 2010, the beam energy was 3.5 TeV and the multiplicity did not exceed four. Because the counting mode is still effective in such a condition [5], the BRAN were operated in the counting mode in 2010. This paper presents operational results of the BRANs during the operation in 2010 (mainly the proton operation) and makes comparisons with measurements of the experiments. The luminosity optimization is discussed in detail in [6] and so this paper focuses on measurements during the normal operation.

43 PARTICLE ACCELERATORS↗

Spectral relationships between kicked Harper and on-resonance double kicked rotor operators

Kicked Harper operators and on-resonance double kicked rotor operators model quantum systems whose semiclassical limits exhibit chaotic dynamics. Recent computational studies indicate a striking resemblance between the spectra of these operators. In this paper we apply C*-algebra methods to explain this resemblance. We show that each pair of corresponding operators belongs to a common rotation C*-algebra B{sub {alpha}}, prove that their spectra are equal if {alpha} is irrational, and prove that the Hausdorff distance between their spectra converges to zero as q increases if {alpha}=p/q with p and q coprime integers. Moreover, we show that corresponding operators in B{sub {alpha}} are homomorphic images of mother operators in the universal rotation C*-algebra A{sub {alpha}} that are unitarily equivalent and hence have identical spectra. These results extend analogous results for almost Mathieu operators. We also utilize the C*-algebraic framework to develop efficient algorithms to compute the spectra of these mother operators for rational {alpha} and present preliminary numerical results that support the conjecture that their spectra are Cantor sets if {alpha} is irrational. This conjecture for almost Mathieu operators, called the ten Martini problem, was recently proven after intensive efforts over several decades. This proof for the almost Mathieu operators utilized transfer matrix methods, which do not exist for the kicked operators. We outline a strategy, based on a special property of loop groups of semisimple Lie groups, to prove this conjecture for the kicked operators.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Opportunities, Challenges, and Research Needs for Remote Microreactor Operations

As the nuclear industry develops new advanced reactor technologies, many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW(thermal) or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued are expected to incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. Here, this work identifies the research needs for challenges that are unique to remote operations and monitoring for microreactors, specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities, as well as methods for verifying the trustworthiness of these signals, are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for responses to abnormal events are identified. This paper identifies the challenges and research opportunities within the areas of importance for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

Opportunities and Challenges for Remote Microreactor Operations

The nuclear industry is developing new advanced reactor technologies, and many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued will incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. This work identifies the challenges unique to remote operations and monitoring for microreactors specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities as well as methods for verifying the trustworthiness of these signals are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for response to abnormal events are identified. This paper details these challenges and research opportunities to provide a foundation for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters: Preprint

This paper investigates operational techniques to achieve smooth microgrid (MG) transitions by dispatching the grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control mode during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worthy to explore how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. As expected, the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires the GFM inverter(s) to maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-following control↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

An Advanced Decision Support Tool for Electricity Infrastructure Operations

Electricity infrastructure, as one of the most critical infrastructures in the U.S., plays an important role in modern societies. Its failure would lead to significant disruption of people’s lives, industry and commercial activities, and result in massive economic losses. Reliable operation of electricity infrastructure is an extremely challenging task because human operators need to consider thousands of possible configurations in near real-time to choose the best option and operate the network effectively. In today’s practice, electricity infrastructure operation is largely based on operators’ experience with very limited real-time decision support, resulting in inadequate management of complex predictions and the inability to anticipate, recognize, and respond to situations caused by human errors, natural disasters, or cyber attacks. Therefore, a systematic approach is needed to manage the complex operational paradigms and choose the best option in a near-real-time manner. This paper proposes an advanced decision support tool for electricity infrastructure operations. The tool has the functions of turning large amount of data into actionable information to help operators monitor power grid status in real time; performing trend analysis to indentify system trend at the regional level or system level to help the operator to foresee and discern emergencies, studying clustering analysis to assist operators to identify the relationships between system configurations and affected assets, and interactively evaluating the alternative remedial actions to aid operators to make effective and timely decisions. This tool can provide significant decision support on electricity infrastructure operations and lead to better reliability in power grids. This paper presents examples with actual electricity infrastructure data to demonstrate the capability of this tool.

54 ENVIRONMENTAL SCIENCES↗

Data-driven operator inference for nonintrusive projection-based model reduction

We presenta a nonintrusive projection-based model reduction method for full models based on time-dependent partial differential equations. Projection-based model reduction constructs the operators of a reduced model by projecting the equations of the full model onto a reduced space. Traditionally, this projection is intrusive, which means that the full-model operators are required either explicitly in an assembled form or implicitly through a routine that returns the action of the operators on a given vector; however, in many situations the full model is given as a black box that computes trajectories of the full-model states and outputs for given initial conditions and inputs, but does not provide the full-model operators. Our nonintrusive operator inference approach infers approximations of the reduced operators from the initial conditions, inputs, trajectories of the states, and outputs of the full model, without requiring the full-model operators. Our operator inference is applicable to full models that are linear in the state or have a low-order polynomial nonlinear term. The inferred operators are the solution of a least-squares problem and converge, with sufficient state trajectory data, in the Frobenius norm to the reduced operators that would be obtained via an intrusive projection of the full-model operators. Our numerical results reflect operator inference on a linear climate model and on a tubular reactor model with a polynomial nonlinear term of third order.

42 ENGINEERING↗

Three Way Catalyst-Selective Catalytic Reduction Aftertreatment System Evaluation for a Lean Burn Gasoline Engine Operating in Homogenous Charge Compression Ignition, Spark-Assisted Compression Ignition, and Spark-Ignited Combustion Modes

Low temperature and dilute homogenous charge compression ignition (HCCI) and spark-assisted compression ignition (SACI) can improve fuel efficiency and reduce engine-out NO x emissions, especially during lean operation. However, under lean operation, these combustion modes are unable to achieve Environmental Protection Agency (EPA) Tier 3 emissions standards without the use of lean aftertreatment. The three way catalyst (TWC)-SCR lean aftertreatment concept investigated in this work uses periodic-rich operation to produce NH 3 over a TWC to be stored on a selective catalytic reduction (SCR) catalyst for NO x conversion during subsequent lean operation. Experiments were performed with a modified 2.0 L gasoline engine that was cycled between lean HCCI and rich SACI operation and between lean and rich spark-ignited (SI) combustion to evaluate NO x conversion and fuel efficiency benefits. Different lambda values during rich operation and different times held in rich operation were investigated. Results are compared to a baseline case in which the engine is always operated at stoichiometric conditions. SCR system calculations are also presented to allow for comparisons of system performance for different levels of stored NH 3 . With the configuration used in this study, lean/rich HCCI/SACI operation resulted in a maximum NO x conversion efficiency of only 10%, while lean/rich SI operation resulted in a maximum NO x conversion efficiency of 60%. If the low conversion efficiency of HCCI/SACI operation could be improved through higher brick temperatures or additional SCR bricks, calculations indicate that TWC-SCR aftertreatment has the potential to provide attractive fuel efficiency benefits and near-zero tailpipe NO x . Calculated potential fuel efficiency improvement relative to stoichiometric SI is 7–17% for lean/rich HCCI/SACI with zero tailpipe NO x and -1 to 5% for lean/rich SI with zero tailpipe NO x emissions. Although the previous work indicated that the use of HCCI/SACI increases the time for NH 3 to start forming over the TWC during rich operation, reduces NH 3 production over the TWC per fuel amount, and increases NH 3 slip over the SCR catalyst, if NO x conversion efficiency could be enhanced, improvements in fuel efficiency could be realized while meeting stringent tailpipe NO x standards.

Engineering↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

THE IMPACT OF A TANK 40H DECANT ON THE PROJECTED OPERATING WINDOWS FOR SB4 AND GLASS SELECTION STRATEGY IN SUPPORT OF THE VARIABILITY STUDY

The Liquid Waste Organization (LWO) has requested that the Savannah River National Laboratory (SRNL) to assess the impact of a 100K gallon decant volume from Tank 40H on the existing sludge-only Sludge Batch 4 (SB4)-Frit 510 flowsheet and the coupled operations flowsheet (SB4 with the Actinide Removal Process (ARP)). Another potential SB4 flowsheet modification of interest includes the addition of 3 wt% sodium (on a calcined oxide basis) to a decanted sludge-only or coupled operations flowsheet. These potential SB4 flowsheet modifications could result in significant compositional shifts to the SB4 system. This paper study provides an assessment of the impact of these compositional changes to the projected glass operating windows and to the variability study for the Frit 510-SB4 system. The influence of the compositional changes on melt rate was not assessed in this study nor was it requested. Nominal Stage paper study assessments were completed using the projected compositions for the various flowsheet options coupled with Frit 510 (i.e., variation was not applied to the sludge and frit compositions). In order to gain insight into the impacts of sludge variation and/or frit variation (due to the procurement specifications) on the projected operating windows, three versions of the Variation Stage assessment were performed: (1) the traditional Variation Stage assessment in which the nominal Frit 510 composition was coupled with the extreme vertices (EVs) of each sludge, (2) an assessment of the impact of possible frit variation (within the accepted frit specification tolerances) on each nominal SB4 option, and (3) an assessment of the impact of possible variation in the Frit 510 composition due to the vendor's acceptance specifications coupled with the EVs of each sludge case. The results of the Nominal Stage assessment indicate very little difference among the various flowsheet options. All of the flowsheets provide DWPF with the possibility of targeting waste loadings (WLs) from the low 30s to the low 40s with Frit 510. In general, the Tank 40H decant has a slight negative impact on the operating window, but DWPF still has the ability to target current WLs (34%) and higher WLs if needed. While the decant does not affect practical WL targets in DWPF, melt rate could be reduced due to the lower Na{sub 2}O content. If true, the addition of 3 wt% Na{sub 2}O to the glass system may regain melt rate, assuming that the source of alkali is independent of the impact on melt rate. Coupled operations with Frit 510 via the addition of ARP to the decanted SB4 flowsheet also appears to be viable based on the projected operating windows. The addition of both ARP and 3 wt% Na{sub 2}O to a decanted Tank 40H sludge may be problematic using Frit 510. Although the Nominal Stage assessments provide reasonable operating windows for the SB4 flowsheets being considered with Frit 510, introduction of potential sludge and/or frit compositional variation does have a negative impact. The magnitude of the impact on the projected operating windows is dependent on the specific flowsheet options as well as the applied variation. The results of the traditional Variation Stage assessments indicate that the three proposed Tank 40H decanted flowsheet options (Case No.2--100K gallon decant, Case No.3--100K gallon decant and 3 wt% Na{sub 2}O addition and Case No.4--100K gallon decant and ARP) demonstrate a relatively high degree of robustness to possible sludge variation over WLs of interest with Frit 510. However, the case where the addition of both ARP and 3 wt% Na{sub 2}O is considered was problematic during the traditional Variation Stage assessment. The impact of coupling the frit specifications with the nominal SB4 flowsheet options on the projected operating windows is highly dependent on whether the upper WLs are low viscosity or liquidus temperature limited in the Nominal Stage assessments. Systems that are liquidus temperature limited exhibit a high degree of robustness to the applied frit and sludge variation, while those that are low viscosity limited show significant reductions (6 percentage points) in the upper WLs that can be obtained. When both frit and sludge variations are applied, the paper study results indicate that DWPF could be severely restricted in terms of projected operating windows for the ARP and Na{sub 2}O addition options. An experimental variability study was not performed using the final SB4 composition and Frit 510 since glasses in the ComPro{trademark} data base were identified that bounded the potential operating window of this system. The bounding ARP case was not considered in that assessment. After the flowsheet cases were identified, an electronic search of ComPro{trademark} identified approximately 12 historical glasses within the compositional regions defined by at least one of the five flowsheet options, but the compositional coverage did not appear adequate to bound all cases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

REDUCTION OF CONSTRAINTS FOR COUPLED OPERATIONS

The homogeneity constraint was implemented in the Defense Waste Processing Facility (DWPF) Product Composition Control System (PCCS) to help ensure that the current durability models would be applicable to the glass compositions being processed during DWPF operations. While the homogeneity constraint is typically an issue at lower waste loadings (WLs), it may impact the operating windows for DWPF operations, where the glass forming systems may be limited to lower waste loadings based on fissile or heat load limits. In the sludge batch 1b (SB1b) variability study, application of the homogeneity constraint at the measurement acceptability region (MAR) limit eliminated much of the potential operating window for DWPF. As a result, Edwards and Brown developed criteria that allowed DWPF to relax the homogeneity constraint from the MAR to the property acceptance region (PAR) criterion, which opened up the operating window for DWPF operations. These criteria are defined as: (1) use the alumina constraint as currently implemented in PCCS (Al{sub 2}O{sub 3} {ge} 3 wt%) and add a sum of alkali constraint with an upper limit of 19.3 wt% ({Sigma}M{sub 2}O < 19.3 wt%), or (2) adjust the lower limit on the Al{sub 2}O{sub 3} constraint to 4 wt% (Al{sub 2}O{sub 3} {ge} 4 wt%). Herman et al. previously demonstrated that these criteria could be used to replace the homogeneity constraint for future sludge-only batches. The compositional region encompassing coupled operations flowsheets could not be bounded as these flowsheets were unknown at the time. With the initiation of coupled operations at DWPF in 2008, the need to revisit the homogeneity constraint was realized. This constraint was specifically addressed through the variability study for SB5 where it was shown that the homogeneity constraint could be ignored if the alumina and alkali constraints were imposed. Additional benefit could be gained if the homogeneity constraint could be replaced by the Al{sub 2}O{sub 3} and sum of alkali constraint for future coupled operations processing based on projections from Revision 14 of the High Level Waste (HLW) System Plan. As with the first phase of testing for sludge-only operations, replacement of the homogeneity constraint with the alumina and sum of alkali constraints will ensure acceptable product durability over the compositional region evaluated. Although these study glasses only provide limited data in a large compositional region, the approach and results are consistent with previous studies that challenged the homogeneity constraint for sludge-only operations. That is, minimal benefit is gained by imposing the homogeneity constraint if the other PCCS constraints are satisfied. The normalized boron releases of all of the glasses are well below the Environmental Assessment (EA) glass results, regardless of thermal history. Although one of the glasses had a normalized boron release of approximately 10 g/L and was not predictable, the glass is still considered acceptable. This particular glass has a low Al{sub 2}O{sub 3} concentration, which may have attributed to the anomalous behavior. Given that poor durability has been previously observed in other glasses with low Al{sub 2}O{sub 3} and Fe{sub 2}O{sub 3} concentrations, including the sludge-only reduction of constraints study, further investigations appear to be warranted. Based on the results of this study, it is recommended that the homogeneity constraint (in its entirety with the associated low frit/high frit constraints) be eliminated for coupled operations as defined by Revision 14 of the HLW System Plan with up to 2 wt% TiO{sub 2}. The use of the alumina and sum of alkali constraints should be continued along with the variability study to determine the predictability of the current durability models and/or that the glasses are acceptable with respect to durability. The use of a variability study for each batch is consistent with the glass product control program and it will help to assess new streams or compositional changes. It is also recommended that the influence of alumina and alkali on durability be studied in greater detail. Limited data suggests that there may be a need to adjust the lower Al{sub 2}O{sub 3} limit and/or the upper alkali limit in order to prevent the fabrication of unacceptable glasses. An in-depth evaluation of all previous data as well as any new data would help to better define an alumina and alkali combination that would avoid potential phase separation and ensure glass durability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparison of Pre‐Construction and Operational Wake Loss Estimates for Land‐Based Wind Plants

The overall bias between pre‐construction energy yield assessment (EYA) estimates of wind plant energy production and the achieved operational production is improving in the wind industry, but uncertainty remains high for individual wind plants. Wake effects within wind plants are one of the largest sources of energy loss considered in the EYA process, and previous work shows wake loss estimates to be a major source of disagreement among wind energy consultants who perform EYAs. To better understand the accuracy of wake loss predictions, we compare overall operational wake loss estimates based on supervisory control and data acquisition data to pre‐construction estimates provided by six wind energy consultants for five land‐based wind plants in North America. By augmenting existing approaches for quantifying operational wake losses, we estimate wake losses during the period of record for which operational data are available as well as the expected long‐term wake losses, based on historical reanalysis weather data, to which the EYA estimates are compared. To account for power variations at different turbine locations caused by terrain‐induced wind resource heterogeneity, we correct the operational wake loss estimates using predicted freestream wind speed variations from the Wind Systems Engineering Reynolds‐averaged Navier–Stokes (RANS) tool. We identify long‐term corrected operational wake losses between 1.9% and 6.4% for the five plants, with a mean loss of 4%. For the project deemed most acceptable for operational wake loss assessment, which is located in the simplest terrain and isolated from neighboring plants, the mean EYA wake loss estimate is within 0.7 percentage points of the operational value of 6.4%. For most of the remaining plants, results suggest that wake losses are generally overpredicted by 2.6–6.3 percentage points. However, operational wake losses may be underestimated for many of these projects because of spatial wind resource variations not captured by the RANS model, external wake effects that are unaccounted for in the estimation process, and wind plant blockage effects. To better understand factors that contribute to the observed wake losses, we investigate operational wake losses as a function of wind direction and wind speed. As expected, wake losses are generally concentrated near wind directions that are aligned with rows of closely spaced turbines and at below‐rated wind speeds; however, for some projects, the energy produced by the wind plant exceeds the estimated potential energy of the plant without wake interactions for certain wind directions and wind speeds, suggesting inaccurate assumptions in the wake loss estimation method for those plants. Lastly, we compare predicted and operational wake losses for individual wind turbines, finding that even when overall wake losses are predicted accurately, large uncertainty exists at the turbine level.

17 WIND ENERGY↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗