MiniDAQ-3: Providing concurrent independent subdetector data-taking on CMS production DAQ resources

The data acquisition (DAQ) of the Compact Muon Solenoid (CMS) experiment at CERN, collects data for events accepted by the Level-1 Trigger from the different detector systems and assembles them in an event builder prior to making them available for further selection in the High Level Trigger, and finally storing the selected events for offline analysis. In addition to the central DAQ providing global acquisition functionality, several separate, so-called “MiniDAQ” setups allow operating independent data acquisition runs using an arbitrary subset of the CMS subdetectors. During Run 2 of the LHC, MiniDAQ setups were running their event builder and High Level Trigger applications on dedicated resources, separate from those used for the central DAQ. This cleanly separated MiniDAQ setups from the central DAQ system, but also meant limited throughput and a fixed number of possible MiniDAQ setups. In Run 3, MiniDAQ-3 setups share production resources with the new central DAQ system, allowing each setup to operate at the maximum Level-1 rate thanks to the reuse of the resources and network bandwidth. Configuration management tools had to be significantly extended to support the synchronization of the DAQ configurations needed for the various setups. We report on the new configuration management features and on the first year of operational experience with the new MiniDAQ-3 system.

Amoiridis, Vassileios↗

STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

54 ENVIRONMENTAL SCIENCES↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchm ark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchmark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

Fatigue monitoring desktop guide

The development of a program for managing material aging (MMG) in the nuclear industry requires a new and different perspective. The classical method for MMG is cycle counting, which has been shown to have limited success. The classical method has been successful in satisfying the ductile condition per the America Society of Mechanical Engineers' (ASME) design criteria. However, the defined material failure mechanism has transformed from through-wall cracking and leakage (ASME) to crack initiation (NUREG-6909). This transformation is based on current industry experience with material degradation early in plant life and can be attributed to fabrication issues and environment concerns where cycle counting has been unsuccessful. This new perspective provides a different approach to cycle counting that incorporates all of the information about the material conditions. This approach goes beyond the consideration of a static analysis and includes a dynamic assessment of component health, which is required for operating plants. This health definition should consider fabrication, inspections, transient conditions and industry operating experience. In addition, this collection of information can be transparent to a broader audience that may not have a full understanding of the system design or the potential causes of early material degradation. This paper will present the key points that are needed for a successful fatigue monitoring desktop guide. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rucio beyond ATLAS: experiences from Belle II, CMS, DUNE, EISCAT3D, LIGO/VIRGO, SKA, XENON

For many scientific projects, data management is an increasingly complicated challenge. The number of data-intensive instruments generating unprecedented volumes of data is growing and their accompanying workflows are becoming more complex. Their storage and computing resources are heterogeneous and are distributed at numerous geographical locations belonging to different administrative domains and organisations. These locations do not necessarily coincide with the places where data is produced nor where data is stored, analysed by researchers, or archived for safe long-term storage. To fulfil these needs, the data management system Rucio has been developed to allow the high-energy physics experiment ATLAS at LHC to manage its large volumes of data in an efficient and scalable way. But ATLAS is not alone, and several diverse scientific projects have started evaluating, adopting, and adapting the Rucio system for their own needs. As the Rucio community has grown, many improvements have been introduced, customisations have been added, and many bugs have been fixed. Additionally, new dataflows have been investigated and operational experiences have been documented. In this article we collect and compare the common successes, pitfalls, and oddities that arose in the evaluation efforts of multiple diverse experiments, and compare them with the ATLAS experience. This includes the high-energy physics experiments Belle II and CMS, the neutrino experiment DUNE, the scattering radar experiment EISCAT3D, the gravitational wave observatories LIGO and VIRGO, the SKA radio telescope, and the dark matter search experiment XENON.

Lassnig, Mario↗

Cheesecloth Alternatives Testing

Heat source plutonium oxide (HS-PuO 2 ) enriched with 65% or greater plutonium-238, is recovered and purified using an aqueous nitric acid process. Historically, cheesecloth has been employed for small spill clean-up and for routine housekeeping. However, the 2016 Department of Energy (DOE) Operating Experience report, entitled Nitrate Waste Evaluations, stated that the mixing of nitrate wastes with organic absorbents, such as cheesecloth, may render transuranic waste unacceptable for disposal at WIPP in the future. This report explores the feasibility of replacement of cheesecloth with an alternative sorbent wipe that has similar absorption and cleaning abilities and improved acid resistance. Currently, cheesecloth is used for three different functions in HS-PuO 2 operations: spill cleanup; general housekeeping operations such as cleaning glovebox floors and windows, balances, furnaces, etc.; and decontamination of iridium cladded heat sources containing HS-PuO 2 . Alternatives used for spill cleanup must be able to tolerate high neutron doses found in the HS-Pu gloveboxes. They must also be able to withstand exposure to nitric acid concentrations up to 15.8 M without decomposing. Wipes used for general housekeeping must also be durable enough to clean rough surfaces and remain intact when used for scrubbing. Wipes used for clad decontamination do not need to absorb large amounts of liquid but they must be able to withstand neutron exposures, temperatures of up to several hundred degrees Celsius, and exposure to acid solutions followed by mild scrubbing. Finally wipes used for any purpose must resist chemical reactions with nitric acid that could cause issues for waste disposal such as energetic exothermic reactions or flammable gas build-up. The wipes selected for this study were ranked based on their usability (radiation tolerance, absorbency, integrity in nitric acid, and durability) as well as their chemical compatibility with nitric acid as demonstrated using several types of chemical analyses. Wipes were then ranked based on the combination of their usability and chemical compatibility scores.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

Experience with split transition lattices at RHIC

During the acceleration process, heavy ion beams in RHIC cross the transition energy. When RHIC was colliding deuterons and gold ions during Run-8, lattices with different integer tunes were used for the two rings. This resulted in the two rings crossing transition at different times, which proved beneficial for the 'Yellow' ring, the RF system of which is slaved to the 'Blue' ring. For the symmetric gold-gold run in FY2010, lattices with different transition energies but equal tunes were implemented. We report the optics design concept as well as operational experience with this configuration.

43 PARTICLE ACCELERATORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Modeling the effect of reflection from metallic walls on spectroscopic measurements

A modification of JET is presently being prepared to bring operational experience with ITER-like first wall (Be) and divertor (W) materials, geometry and plasma parameters. Reflectivity measurements of JET sample tiles have been performed and the data are used within a simplified model of the JET and ITER vessels to predict additional contributions to quantitative spectroscopic measurements. The most general method to characterize reflectivity is the bidirectional reflection distribution function (BRDF). For extended sources however, such as bremsstrahlung and edge emission of fuel and intrinsic impurities, the results obtained in the modeling are almost as accurate if the total reflectivity with ideal Lambertian angular dependence is used. This is in contrast to the experience in other communities, such as optical design, lighting design, or rendering who deal mostly with pointlike light sources. This result is so far based on a very limited set of measurements and will be reassessed when more detailed BRDF measurements of JET tiles have been made. If it is true it offers the possibility of in situ monitoring of the reflectivity of selected parts of the wall during exposure to plasma operation, while remeasurement of the BRDF is performed during interventions. For a closed vessel structure such as ITER, it is important to consider multiple reflections. This makes it more important to represent the whole of the vessel reasonably accurately in the model, which on the other hand is easier to achieve than for the more complex internal structure of JET. In both cases the dominant contribution is from the first reflection, and a detailed model of the areas intersected by lines of sight of diagnostic interest is required.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and Prototyping of Advanced Control Systems for Advanced Reactors Operating in the Future Electric Grid (Final Report)

Despite its significant advantages as a baseload, low-carbon energy source, the U.S. nuclear power industry has faced increasing difficulties in maintaining economic competitiveness in a rapidly evolving energy market. The economic conditions faced by the current fleet of nuclear power plants (NPPs) in the U.S. deregulated electricity market require a concerted effort to mitigate specific cost factors. Many units are struggling to stay competitive, and some premature shutdowns have occurred. Besides, in response to the large penetration of renewable energy sources, the role of nuclear power plants as pure baseload units needs to be reconsidered. Based on these experiences, operational flexibility is considered a fundamental requirement for the next generation of nuclear reactors to be competitive in the future energy market. The deployment of advanced reactors capable of operating within a new power grid paradigm, known as the Integrated Energy System (IES) was investigated. This approach combines new reactor designs with Thermal Energy Storage (TES) technologies, allowing the nuclear reactor to maintain a steady power output without the need for constant adjustments in response to load demand fluctuations. With this configuration, the reactor operates as a baseload unit, experiencing only very gradual power transients, while the energy storage facility within the power conversion cycle acts as a peaking unit.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experience With Machine Protection Systems At PIP2IT

The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$\mu$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.

43 PARTICLE ACCELERATORS↗

German central solar heating plants with seasonal heat storage

Central solar heating plants contribute to the reduction of CO{sub 2}-emissions and global warming. The combination of central solar heating plants with seasonal heat storage enables high solar fractions of 50% and more. Several pilot central solar heating plants with seasonal heat storage (CSHPSS) built in Germany since 1996 have proven the appropriate operation of these systems and confirmed the high solar fractions. Four different types of seasonal thermal energy stores have been developed, tested and monitored under realistic operation conditions: Hot-water thermal energy store (e.g. in Friedrichshafen), gravel-water thermal energy store (e.g. in Steinfurt-Borghorst), borehole thermal energy store (in Neckarsulm) and aquifer thermal energy store (in Rostock). In this paper, measured heat balances of several German CSHPSS are presented. The different types of thermal energy stores and the affiliated central solar heating plants and district heating systems are described. Their operational characteristics are compared using measured data gained from an extensive monitoring program. Thus long-term operational experiences such as the influence of net return temperatures are shown. (author)

14 SOLAR ENERGY↗

Modeling and Design of Integrated Safeguards and Security for an Electrochemical Reprocessing Facility

Electrochemical reprocessing of spent nuclear fuel may be an alternative to aqueous processing and is considered more attractive for fast reactor fuel cycles. Molten salt processing of the fuel may simplify the number of processing steps, but the nuclear industry worldwide has much less operational experience with this technology, including safeguards and security. As interest in electrochemical processing grows in the U.S. and other countries, it is important to understand how to address materials accountancy and security in this unique environment. For this work, a model of a commercial-scale electrochemical plant was developed in Matlab Simulink for design and analysis of integrated safeguards and security systems. The model tracks the mass flow rates of the fuel and salt through the various unit operations and simulates materials accountancy, process monitoring measurements, and physical protection. These measurements are then used to calculate inventory balances during normal operation and diversion scenarios. The model analysis enables one to identify various strategies and options for safeguarding nuclear material, contingent upon the feasibility of the measurement technology. This paper describes the model development, measurement options and strategies, and performance under diversion scenarios.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Post-Fire Safe Shutdown Capability. An Inspector's Handbook. Draft Report

The Nuclear Regulatory Commission's (NRC) current fire protection regulatory framework was initiated in response to a cable fire that occurred at the Browns Ferry Nuclear Power Station in 1975. Following the issuance of several guidance documents, in 1981 the Commission codified deterministic requirements to provide reasonable assurance that fire would not jeopardize reactor safety (10 CFR 50.48 "Fire Protection" and Appendix R to 10 CFR 50). Since then, the results of plant operating experience, NRC inspection activities and cable fire testing programs have served to clarify the application of these requirements. In 2004, the NRC amended 10 CFR Part 50.48 to add a new subsection, 10 CFR 50.48(c), that endorses, with exceptions, the National Fire Protection Association's 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants — 2001 Edition," as a voluntary alternative for demonstrating compliance with Appendix R. To date, approximately half of all operating plants have transitioned to a risk-informed approach under 10 CFR 50.48(c). Regardless of the selected approach, each operating nuclear power plant should establish a comprehensive fire protection program that includes features needed to minimize the likelihood and consequence of firesl. To achieve this objective, fire protection programs integrate the NRC's long-held safety concept of defense-in-depth (DID) by providing multiple barriers against potentially unacceptable consequences of fire. To minimize the frequency and size of fires, the first lines of defense include controls for fire prevention, such as controlling combustibles and ignition sources and fire mitigation features, such as fire detection and suppression systems. In the unlikely event that a fire should start and continue to grow in spite of these features, appropriate fire protection features, such as fire-rated barriers are provided as necessary to ensure the accomplishment of essential shutdown functions. This handbook was specifically developed for NRC inspectors that may be assigned to perform elements of Inspection Procedure (IP) 71111.05T, "Fire Protection (Triennial)," including, (a) "Protection of Safe Shutdown Capabilities," (e) "Alternative Shutdown Capability," and (f) "Circuit Analyses." Thus, the document concentrates solely on the final element of defense-in-depth— ensuring reactor safety will not be compromised in the event of a serious fire. In addition to describing how the NRC's regulatory framework has evolved since the Browns Ferry Fire, the handbook illustrates the content and scope of various analyses typically referenced in a plant's fire protection licensing basis and includes techniques and insights for assessing the plant's conformance to those criteria.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance (January 2011 - September 2011)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers 1) a Reference Scenario using the default part failure rates within the O&M Cost Model, 2) High Failure Rate Scenarios that increase the failure rates of three major components(blades, gearboxes, and generators) individually, 3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and 4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in thisreport, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

17 WIND ENERGY↗