Comparison of seven performance measures in a time-delayed manipulation task
Real-time performance data was collected during a pick-up task carried out with a Rancho master-slave manipulator using a minicomputer-based data taker. In addition to the usual task-time measurements, computer algorithms to integrate the energy consumed and to count and time the number of moves were implemented. In addition to these measures, several derived measures such as the fraction of time moving (MRATIO) and mean time per move (MBAR) were obtained in an off-line analysis. Preliminary results of the time delay experiment indicate that two new measures, MRATIO and MBAR, are almost an order of magnitude more sensitive than task time, the conventional measure, in determining performance changes with transmission delays in the range from 0.0 to 1.0s.