Search NASA⌕ Search

SEARCH · Search NASA

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Autonomous Agents and Intelligent Assistants for Exploration Operations

Human exploration of space will involve remote autonomous crew and systems in long missions. Data to earth will be delayed and limited. Earth control centers will not receive continuous real-time telemetry data, and there will be communication round trips of up to one hour. There will be reduced human monitoring on the planet and earth. When crews are present on the planet, they will be occupied with other activities, and system management will be a low priority task. Earth control centers will use multi-tasking "night shift" and on-call specialists. A new project at Johnson Space Center is developing software to support teamwork between distributed human and software agents in future interplanetary work environments. The Engineering and Mission Operations Directorates at Johnson Space Center (JSC) are combining laboratories and expertise to carry out this project, by establishing a testbed for hWl1an centered design, development and evaluation of intelligent autonomous and assistant systems. Intelligent autonomous systems for managing systems on planetary bases will commuicate their knowledge to support distributed multi-agent mixed-initiative operations. Intelligent assistant agents will respond to events by developing briefings and responses according to instructions from human agents on earth and in space.

Malin, Jane T.↗

Remote sensing in Michigan for land resource management

During the period from June 1972 to June 1973, remote sensing techniques were applied to the following tasks: (1) mapping Michigan's land resources, (2) waterfowl habitat management at Point Mouillee, (3) mapping of Lake Erie shoreline flooding, (4) highway impact assessment, (5) applications of the Earth Resources Technology Satellite, ERTS-1, (6) investigation of natural gas eruptions near Williamsburg, and (7) commercial site selection. The goal of the program was the large scale adaption, by both public agencies and private interests in Michigan, of earth-resource survey technology as an important aid in the solution of current problems in resources management and environmental protection.

Sattinger, I. J.↗

Magellan Project: Evolving enhanced operations efficiency to maximize science value

Magellan has been one of NASA's most successful spacecraft, returning more science data than all planetary spacecraft combined. The Magellan Spacecraft Team (SCT) has maximized the science return with innovative operational techniques to overcome anomalies and to perform activities for which the spacecraft was not designed. Commanding the spacecraft was originally time consuming because the standard development process was envisioned as manual tasks. The Program understood that reducing mission operations costs were essential for an extended mission. Management created an environment which encouraged automation of routine tasks, allowing staff reduction while maximizing the science data returned. Data analysis and trending, command preparation, and command reviews are some of the tasks that were automated. The SCT has accommodated personnel reductions by improving operations efficiency while returning the maximum science data possible.

Cheuvront, Allan R.↗

Identifying Common Use Cases across Extensible Traffic Management (xTM) for Interactions with Air Traffic Controllers

NASA’s Extensible Traffic Management (xTM) builds on the foundation and the architecture of Unmanned Aircraft Systems (UAS) Traffic Management (UTM) concept and extends it broadly to other domains, such as Advanced / Urban Air Mobility (AAM/UAM) and Upper Class E Traffic Management (ETM). These xTM concepts assume the ability to fly in airspace that is authorized to operate solely under xTM services and mostly without any air traffic control (ATC) support. However, they also assume circumstances in which the xTM vehicles would need to operate in conventional ATC-managed airspace, both during nominal and off-nominal scenarios. Due to the vast differences in the xTM vehicle performances and missions, there is a concern that ATC may have difficulty in safely managing the xTM traffic and providing appropriate services to all vehicles, unless a consistent set of roles, procedures, and data exchange requirements are defined across the diverse set of xTM vehicle operations. In this paper, we describe a set of use cases that have been identified in UTM, AAM/UAM, and ETM operations that are related to ATC interactions, and we propose to categorize these use cases across xTM domains based on common trigger events. Organizing the use cases from the perspective of ATC roles per each trigger event is expected to provide the first step in discovering common procedures and data requirements across xTM domains that could help ease the controllers’ cognitive task load and allow them to manage these interactions more safely.

Extensible Traffic Management (xTM)↗

A Human-In-The-Loop Simulation for Urban Air Mobility in the Terminal Area

In this paper researchers propose a human-in-the-loop experiment to study human performance when tasked with tactical deconfliction in terminal area air taxi operations. The air taxi operations being considered herein are an advanced air transportation concept called Urban Air Mobility (UAM). The UAM concept aims to support not only air taxi operations, but also package delivery and emergency response among other use cases. The key innovation over current air transportation lies with the introduction of highly automated aircraft and air traffic management systems. Development of the UAM system will include transitional midterm phases where some operational services will be provided by a mixture of automation and human actors. Midterm operations present a unique challenge, since the scope of responsibility of automated systems is largely undefined, suggesting the need for direct human participation with little to inform how much human intervention is necessary. Here it is assumed that traffic management responsibilities require coordination between human actors and automated systems and focus on arrival flows for midterm operations. In the proposed human-in-the-loop simulation, virtual UAM traffic is strategically deconflicted by a Provider of Services for UAM at departure, then tactically managed by a human at the arrival facility. Generated traffic consists of UAM participants flying in UAM exclusive airspace structures, thus isolated from traditional traffic. The human operator is tasked with managing spacing of arrival traffic and executing speed adjustments as deemed necessary. Researchers propose the investigation of three levels of automation assistance: 1) no assistance; 2) spacing violation detection; 3) spacing violation detection and speed adjustment recommendations. Quantitative measures like throughput and delay are used to assess the human's capacity for accommodating airborne delays. Qualitative evaluations such as surveys and open-ended feedback are used to gain insight into human factors. These factors could introduce additional capacity constraints on traffic, independent of physical or technical constraints. Although findings for this study will not be reported as the study has not yet been executed, the authors conclude with potential outcomes informed by previous simulations in the literature and suggestions for the structure and procedures of midterm human-automation air traffic management.

UAM↗

Test and evaluation of a multifunction keyboard and a dedicated keyboard for control of a flight management computer

A flight management computer (FMC) control display unit (CDU) test was conducted to compare two types of input devices: a fixed legend (dedicated) keyboard and a programmable legend (multifunction) keyboard. The task used for comparison was operation of the flight management computer for the Boeing 737-300. The same tasks were performed by twelve pilots on the FMC control display unit configured with a programmable legend keyboard and with the currently used B737-300 dedicated keyboard. Flight simulator work activity levels and input task complexity were varied during each pilot session. Half of the points tested were previously familiar with the B737-300 dedicated keyboard CDU and half had no prior experience with it. The data collected included simulator flight parameters, keystroke time and sequences, and pilot questionnaire responses. A timeline analysis was also used for evaluation of the two keyboard concepts.

Crane, J. M.↗

Visual Attention Allocation Between Robotic Arm and Environmental Process Control: Validating the STOM Task Switching Model

Fifty six participants time shared a spacecraft environmental control system task with a realistic space robotic arm control task in either a manual or highly automated version. The former could suffer minor failures, whose diagnosis and repair were supported by a decision aid. At the end of the experiment this decision aid unexpectedly failed. We measured visual attention allocation and switching between the two tasks, in each of the eight conditions formed by manual-automated arm X expected-unexpected failure X monitoring- failure management. We also used our multi-attribute task switching model, based on task attributes of priority interest, difficulty and salience that were self-rated by participants, to predict allocation. An un-weighted model based on attributes of difficulty, interest and salience accounted for 96 percent of the task allocation variance across the 8 different conditions. Task difficulty served as an attractor, with more difficult tasks increasing the tendency to stay on task.

STOM attention allocation model validation↗

An integrated decision support system for TRAC: A proposal

Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

Mukkamala, Ravi↗

Space Station Module Power Management and Distribution System (SSM/PMAD)

This report provides an overview of the Space Station Module Power Management and Distribution (SSM/PMAD) testbed system and describes recent enhancements to that system. Four tasks made up the original contract: (1) common module power management and distribution system automation plan definition; (2) definition of hardware and software elements of automation; (3) design, implementation and delivery of the hardware and software making up the SSM/PMAD system; and (4) definition and development of the host breadboard computer environment. Additions and/or enhancements to the SSM/PMAD test bed that have occurred since July 1990 are reported. These include: (1) rehosting the MAESTRO scheduler; (2) reorganization of the automation software internals; (3) a more robust communications package; (4) the activity editor to the MAESTRO scheduler; (5) rehosting the LPLMS to execute under KNOMAD; implementation of intermediate levels of autonomy; (6) completion of the KNOMAD knowledge management facility; (7) significant improvement of the user interface; (8) soft and incipient fault handling design; (9) intermediate levels of autonomy, and (10) switch maintenance.

Miller, William↗

RAMIS

A description is given of experience with the RAMIS data base management system. Examples are given of tasks where the user friendly aspects of the system facilitated quick handling of inquiries.

Head, J.↗

USDA Forest Service mobile satellite communications applications

The airborne IR signal processing system being developed will require the use of mobile satellite communications to achieve its full capability and improvement in delivery timeliness of processed IR data to the Fire Staff. There are numerous other beneficial uses, both during wildland fire management operations or in daily routine tasks, which will also benefit from the availability of reliable communications from remote areas.

Warren, John R.↗

Crew station research and development facility training for the light helicopter demonstration/validation program

The U.S. Army Crew Station Research and Development Branch (CSRDB) of the Aircraft Simulation Division (AVSCOM) was tasked by the Light Helicopter Program Manager (LH-PM) to provide training to Army personnel in advanced aircraft simulation technology. The purpose of this training was to prepare different groups of pilots to support and evaluate two contractor simulation efforts during the Demonstration/Validation (DEM/VAL) phase of the LH program. The personnel in the CSRDB developed mission oriented training programs to accomplish the objectives, conduct the programs, and provide guidance to army personnel and support personnel throughout the DEM/VAL phase.

Matsumoto, Joy Hamerman↗

File servers, networking, and supercomputers

One of the major tasks of a supercomputer center is managing the massive amount of data generated by application codes. A data flow analysis of the San Diego Supercomputer Center is presented that illustrates the hierarchical data buffering/caching capacity requirements and the associated I/O throughput requirements needed to sustain file service and archival storage. Usage paradigms are examined for both tightly-coupled and loosely-coupled file servers linked to the supercomputer by high-speed networks.

Moore, Reagan W.↗

File servers, networking, and supercomputers

One of the major tasks of a supercomputer center is managing the massive amount of data generated by application codes. A data flow analysis of the San Diego Supercomputer Center is presented that illustrates the hierarchical data buffering/caching capacity requirements and the associated I/O throughput requirements needed to sustain file service and archival storage. Usage paradigms are examined for both tightly-coupled and loosely-coupled file servers linked to the supercomputer by high-speed networks.

Moore, Reagan W.↗

Workshop on Strategies for Calibration and Validation of Global Change Measurements

The Committee on Environment and Natural Resources (CENR) Task Force on Observations and Data Management hosted a Global Change Calibration/Validation Workshop on May 10-12, 1995, in Arlington, Virginia. This Workshop was convened by Robert Schiffer of NASA Headquarters in Washington, D.C., for the CENR Secretariat with a view toward assessing and documenting lessons learned in the calibration and validation of large-scale, long-term data sets in land, ocean, and atmospheric research programs. The National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) hosted the meeting on behalf of the Committee on Earth Observation Satellites (CEOS)/Working Group on Calibration/walidation, the Global Change Observing System (GCOS), and the U. S. CENR. A meeting of experts from the international scientific community was brought together to develop recommendations for calibration and validation of global change data sets taken from instrument series and across generations of instruments and technologies. Forty-nine scientists from nine countries participated. The U. S., Canada, United Kingdom, France, Germany, Japan, Switzerland, Russia, and Kenya were represented.

Guenther, Bruce↗

Spares Management : Optimizing Hardware Usage for the Space Shuttle Main Engine

The complexity of the Space Shuttle Main Engine (SSME), combined with mounting requirements to reduce operations costs have increased demands for accurate tracking, maintenance, and projections of SSME assets. The SSME Logistics Team is developing an integrated asset management process. This PC-based tool provides a user-friendly asset database for daily decision making, plus a variable-input hardware usage simulation with complex logic yielding output that addresses essential asset management issues. Cycle times on critical tasks are significantly reduced. Associated costs have decreased as asset data quality and decision-making capability has increased.

Gulbrandsen, K. A.↗

Flying Cassini with Virtual Operations Teams

The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.

Dodd, Suzanne↗

CAD Services: an Industry Standard Interface for Mechanical CAD Interoperability

Most organizations seek to design and develop new products in increasingly shorter time periods. At the same time, increased performance demands require a team-based multidisciplinary design process that may span several organizations. One approach to meet these demands is to use 'Geometry Centric' design. In this approach, design engineers team their efforts through one united representation of the design that is usually captured in a CAD system. Standards-based interfaces are critical to provide uniform, simple, distributed services that enable the 'Geometry Centric' design approach. This paper describes an industry-wide effort, under the Object Management Group's (OMG) Manufacturing Domain Task Force, to define interfaces that enable the interoperability of CAD, Computer Aided Manufacturing (CAM), and Computer Aided Engineering (CAE) tools. This critical link to enable 'Geometry Centric' design is called: Cad Services V1.0. This paper discusses the features of this standard and proposed application.

Claus, Russell↗