Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONSOLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Space Operations Training Concepts Benchmark Study (Training in a Continuous Operations Environment)

The NASA/USAF Benchmark Space Operations Training Concepts Study will perform a comparative analysis of the space operations training programs utilized by the United States Air Force Space Command with those utilized by the National Aeronautics and Space Administration. The concentration of the study will be focused on Ground Controller/Flight Controller Training for the International Space Station Payload Program. The duration of the study is expected to be five months with report completion by 30 June 2002. The U.S. Air Force Space Command was chosen as the most likely candidate for this benchmark study because their experience in payload operations controller training and user interfaces compares favorably with the Payload Operations Integration Center's training and user interfaces. These similarities can be seen in the dynamics of missions/payloads, controller on-console requirements, and currency/proficiency challenges to name a few. It is expected that the report will look at the respective programs and investigate goals of each training program, unique training challenges posed by space operations ground controller environments, processes of setting up controller training programs, phases of controller training, methods of controller training, techniques to evaluate adequacy of controller knowledge and the training received, and approaches to training administration. The report will provide recommendations to the respective agencies based on the findings. Attached is a preliminary outline of the study. Following selection of participants and an approval to proceed, initial contact will be made with U.S. Air Force Space Command Directorate of Training to discuss steps to accomplish the study.

Johnston, Alan E.↗

Programmable Pacemaker

St. Jude Medical's Cardiac Rhythm Management Division, formerly known as Pacesetter Systems, Inc., incorporated Apollo technology into the development of the programmable pacemaker system. This consists of the implantable pacemaker together with a physician's console containing the programmer and a data printer. Physician can communicate with patient's pacemaker by means of wireless telemetry signals transmitted through the communicating head held over the patient's chest. Where earlier pacemakers deliver a fixed type of stimulus once implanted, Programalith enables surgery free "fine tuning" of device to best suit the patient's changing needs.

Source record↗

Silent Sentry

NASA developed personal security system, commercialized by Sentry Products, Inc. enables resident to summon instant help in case of medical emergency or threatened violence. Its principal elements are a pen-shaped signaling device, "silent" because its ultrasonic alert signal is inaudible to the human ear, and a system of receivers interconnected with a constantly-monitored aster console. SCAN pen weighs only two ounces and is worn on necklace or attached by a clip to the user's clothing. The person in trouble simply presses a clasp, releasing a hammer inside the pen which strikes an aluminum bar. The impact causes the bar to resonate like a tuning fork and emit the ultrasonic signal, which is detected by the nearest receiver.

Source record↗

Space Derived Health Aids (Cardiac Pacemaker)

St. Jude Medical's Cardiac Rhythm Management Division's (formerly known as Pacesetter Systems, Inc.) pacer is a rechargeable cardiac pacemaker that eliminates the recurring need for surgery to implant a new battery. The Programalith is an advanced cardiac pacing system which permits a physician to reprogram a patient's implanted pacemaker without surgery. System consists of a pacemaker, together with a physician's console containing the programmer and a data printer. Signals are transmitted by wireless telemetry. Two-way communications, originating from spacecraft electrical power systems technology, allows physician to interrogate the pacemaker as to the status of the heart, then to fine tune the device to best suit the patient's needs.

Source record↗

Space Derived Health Aids (AID, Heart Monitor)

CPI's spinoff from miniaturized pace circuitry is the new heart-assist device, the AID implantable automatic pulse generator. AID pulse generator monitors the heart continuously, recognizes onset of fibrillation, then administers a corrective electrical shock. A mini- computer, a power source, and two electrodes which sense heart activity are included in the unit. An associated system was also developed. It includes an external recorder to be worn by AID patients and a physician's console to display the data stored by the recorder. System provides a record of fibrillation occurrences and the ensuing defibrillation.

Source record↗

Tool for Movable Ceiling

The Bendix Corp., with the help of NASA's Kennedy Space Center, developed a tool to equalize tensions in the 150 cables of the ceiling. This inexpensive tool used in concert halls was developed first for elevator and crane cables used to lift heavy space vehicles. University of Akron's performing arts hall has been developed to shrink and expand to accommodate audiences as large as 3,000 and as small as 900. Once the hall has been sound tuned, various positions of this ingenious ceiling and related acoustic curtains may be called into play immediately by pushing buttons on a control console programmed previously. With the touch of a finger before an event, a technician may condition the hall for chamber music, symphony, or theater.

Source record↗

[Activities of System Studies and Simulation, Inc.]

Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.

Source record↗

Transforming Our SMEX Organization by Way of Innovation, Standardization, and Automation

NASA's Small Explorer (SMEX) Flight Operations Team (FOT) is currently tackling the challenge of supporting ground operations for several satellites that have surpassed their designed lifetime and have a dwindling budget. At Goddard Space Flight Center (GSFC), these missions are presently being reengineered into a fleet-oriented ground system. When complete, this ground system will provide command and control of four SMEX missions, and will demonstrate fleet automation and control concepts as a pathfinder for additional mission integrations. A goal of this reengineering effort is to demonstrate new ground-system technologies that show promise of supporting longer mission lifecycles and simplifying component integration. In pursuit of this goal, the SMEX organization has had to examine standardization, innovation, and automation. A core technology being demonstrated in this effort is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture focuses on providing standard interfaces for ground system applications to promote application interoperability. Building around commercial Message Oriented Middleware and providing a common messaging standard allows GMSEC to provide the capabilities necessary to support integration of new software components into existing missions and increase the level of interaction within the system. For SMS, GMSEC has become the technology platform to transform flight operations with the innovation and automation necessary to reduce operational costs. The automation technologies supported in SMEX are built upon capabilities provided by the GMSEC architecture that allows the FOT to further reduce the involvement of the console, operator. Initially, SMEX is automating only routine operations, such as safety and health monitoring, basic commanding, and system recovery. The operational concepts being developed here will reduce the need for staffed passes and are a necessity for future fleet management. As this project continues to evolve, additional innovations beyond GMSEC and automation have, and will continue to be developed. The team developed techniques for migrating ground systems of existing on-orbit assets. The tools necessary to monitor and control software failures were integrated and tailored for operational environments. All this was done with a focus of extending fleet operations to mission beyond SMU. The result of this work is the foundation for a broader fleet-capable ground system that will include several missions supported by the Space Science Mission Operations Project.

Madden, Maureen↗

Real-Time Rocket/Vehicle System Integrated Health Management Laboratory For Development and Testing of Health Monitoring/Management Systems

Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.

Aguilar, R.↗

Conceptual Inquiry of the Space Shuttle and International Space Station GNC Flight Controllers

The concept of Mission Control was envisioned by Christopher Columbus Kraft in the 1960's. Instructed to figure out how to operate human space flight safely, Kraft envisioned a room of sub-system experts troubleshooting problems and supporting nominal flight activities under the guidance of one Flight Director who is responsible for the success of the mission. To facilitate clear communication, MCC communicates with the crew through a Capsule Communicator (CAPCOM) who is an astronaut themselves. Gemini 4 was the first mission to be supported by such a MCC and successfully completed the first American EVA. The MCC seen on television is called the Flight Control Room (FCR, pronounced ficker) or otherwise known as the front room. While this room is the most visible aspect, it is a very small component of the entire control center. The Shuttle FCR is known as the White FCR (WFCR) and Station's as FCR-1. (FCR-1 was actually the first FCR built at JSC which was used through the Gemini, Apollo and Shuttle programs until the WFCR was completed in 1992. Afterwards FCR-1 was refurbished first for the Life Sciences Center and then for the ISS in 2006.) Along with supporting the Flight Director, each FCR operator is also the supervisor for usually two or three support personnel in a back room called the Multi-Purpose Support Room (MPSR, pronounced mipser). MPSR operators are more deeply focused on their specific subsystems and have the responsible to analyze patterns, and diagnose and assess consequences of faults. The White MPSR (WMPSR) operators are always present for Shuttle operations; however, ISS FCR controllers only have support from their Blue MPSR (BMPSR) while the Shuttle is docked and during critical operations. Since ISS operates 24-7, the FCR team reduces to a much smaller Gemini team of 4-5 operators for night and weekend shifts when the crew is off-duty. The FCR is also supported by the Mission Evaluation Room (MER) which is a collection of contractor engineers who provide analysis and long-term troubleshooting support. Each MER operator is an expert in a very small portion of a sub-system and each FCR console usually interfaces with several MER positions.

Kranzusch, Kara↗

Incident Involving 30-Ah Li-ion Cell at NASA Glenn Research Center

The key lesson learned from the February 17, 2006 cell explosion incident is that PC-based test-systems, even those having built-in watchdog monitors, can lose control and malfunction. In the case of lithiumion cell/battery testing, the stored energy can be released explosively causing considerable injury and damage to facilities. The investigation showed that although the Arbin system has a built-in watchdog monitor, the circumstances of the incident defeated the action of the watchdog and allowed the cycler to continue operation without control. An upgrade to the most recent version of Arbin software (version 4) was provided as a fix to the presumed control problem. This upgrade included newer EPROM s for the cycler microprocessor. Investigation revealed that similar incidents have occurred at other NASA centers with a variety of PC-based test instruments. JPL suffered an incident with Maccor testers and the GRC fuel cell group observed similar problems with LabView software. This is not exclusively an Arbin problem, but an issue with all PC-based systems. In this incident, it was fortunate that the event occurred after-hours with no-one in the room. The facility arrangement placed control consoles adjacent to the test chamber doors. Had someone been in the room during the event, they would have been exposed to hot debris and toxic combustion products. It was also fortunate that the exploded cell stayed inside the chamber after the door was forced open. If the cell had been ejected into the room it could have caused serious facility damage by impact and possibly caused a fire in the facility.

Bennett, William↗

Staffing the ISS Control Centers: Lessons Learned from Long-Duration Human Space Flight

The International Space Station (ISS) has been in operation with a permanent human presence in space for over five years, and plans for continued operations stretch ten years into the future. Ground control and support operations are, likewise, a 15-year enterprise. This long-term, 24-hour per day, 7 day per week support has presented numerous challenges in the areas of ground crew training, initial and continued certification, and console staffing. The Mission Control Center in Houston, Texas and the Payload Operations Center in Huntsville, Alabama have both tackled these challenges, with similar, yet distinct, approaches. This paper describes the evolution of the staffing and training policies of both control centers in a chronological progression. The relative merits and shortcomings of the various policies employed are discussed and a summary of "lessons learned" is presented. Finally, recommendations are made as best practices for future long-term space missions.

Olsen, Carrie D.↗

Patient Monitoring

In photo above, the electrocardiogram of a hospitalized patient is being transmitted by telemetry. Widely employed in space operations, telemetry is a process wherein instrument data is converted to electrical signals and sent to a receiver where the signals are reconverted to usable information. In this instance, heart readings are picked up by the electrode attached to the patient's body and delivered by wire to the small box shown, which is a telemetry transmitter. The signals are relayed wirelessly to the console in the background, which converts them to EKG data. The data is displayed visually and recorded on a printout; at the same time, it is transmitted to a central control station (upper photo) where a nurse can monitor the condition of several patients simultaneously. The Patient Monitoring System was developed by SCI Systems, Inc., Huntsville, Alabama, in conjunction with Abbott Medical Electronics, Houston, Texas. In developing the system, SCI drew upon its extensive experience as a NASA contractor. The company applied telemetry technology developed for the Saturn launch vehicle and the Apollo spacecraft; instrumentation technology developed for heart, blood pressure and sleep monitoring of astronauts aboard NASA's Skylab long duration space station; and communications technology developed for the Space Shuttle.

Source record↗

Patient ECG recording control for an automatic implantable defibrillator

An implantable automatic defibrillator includes sensors which are placed on or near the patient's heart to detect electrical signals indicative of the physiology of the heart. The signals are digitally converted and stored into a FIFO region of a RAM by operation of a direct memory access (DMA) controller. The DMA controller operates transparently with respect to the microprocessor which is part of the defibrillator. The implantable defibrillator includes a telemetry communications circuit for sending data outbound from the defibrillator to an external device (either a patient controller or a physician's console or other) and a receiver for sensing at least an externally generated patient ECG recording command signal. The patient recording command signal is generated by the hand held patient controller. Upon detection of the patient ECG recording command, DMA copies the contents of the FIFO into a specific region of the RAM.

Fountain, Glen H.↗

GSFC Technical Outreach: The Capitol College Model

In February 2005, as part of the National Aeronautic and Space Administration (NASA) Technical Outreach Program, Goddard Space Flight Center (GSFC) awarded Capitol College of Laurel, Maryland an Educational Grant to establish a Space Operation academic curriculum to meet the future needs of mission operations engineers. This was in part due to the aerospace industry and GSFC concerns that a large number of professional engineers are projected to retire in the near term with evidence showing that current enrollment in engineering schools will not produce sufficient number of space operation trained engineers that will meet industry and government demands. Capitol College, under the agreement of the Educational Grant, established the Space Operations Institute (SOI) with a new curriculum in Space Operations that was approved and certified by the State of Maryland. The SO1 programs focuses on attracting, recruiting, and training a pipeline of highly qualified engineers with experience in mission operations, system engineering and development. The selected students are integrated as members of the engineering support team in any of the missions supported by the institute. The students are mentored by professional engineers from several aerospace companies that support GSFC. Initially, the institute was involved in providing console engineers and mission planning trainees for the Upper Atmosphere Research Satellite (UARS), the Earth Radiation Budget Satellite (ERBS) and the Total Ozone Mapping Spectrometer mission (TOMS). Subsequently, the students were also involved in the technology refresh of the TOMS ground system and other mission operations development. Further mission assignment by GSFC management included participation in the Tropical Rainfall Measuring Mission (TRMM) mission operations and ground system technology refresh. The SOI program has been very successful. Since October 2005, sixty-four students have been enrolled in the SOI program and twenty-five have already graduated from the program, nineteen of whom are employed by company's supporting GSFC. Due to the success of the program, the initial grant period was extended for another period of two years. This paper presents the process that established the SOI as a viable pipeline of mission operations engineers, the lessons learned in the process of dealing with grants, and experience gained in mentoring engineering students that are responsible for particular areas of expertise and functionality. This paper can also be considered a case study and model for integrating a student team with government and industry professionals in the real world of mission operations.

Marius, Julio L.↗

Mentoring SFRM: A New Approach to International Space Station Flight Controller Training

The Mission Operations Directorate (MOD) of the Johnson Space Center is responsible for providing continuous operations support for the International Space Station (ISS). Operations support requires flight controllers who are skilled in team performance as well as the technical operations of the ISS. Space Flight Resource Management (SFRM), a NASA adapted variant of Crew Resource Management (CRM), is the competency model used in the MOD. ISS flight controller certification has evolved to include a balanced focus on development of SFRM and technical expertise. The latest challenge the MOD faces is how to certify an ISS flight controller (operator) to a basic level of effectiveness in 1 year. SFRM training uses a two-pronged approach to expediting operator certification: 1) imbed SFRM skills training into all operator technical training and 2) use senior flight controllers as mentors. This paper focuses on how the MOD uses senior flight controllers as mentors to train SFRM skills. Methods: A mentor works with an operator throughout the training flow. Inserted into the training flow are guided-discussion sessions and on-the-job observation opportunities focusing on specific SFRM skills, including: situational leadership, conflict management, stress management, cross-cultural awareness, self care and team care while on-console, communication, workload management, and situation awareness. The mentor and operator discuss the science and art behind the skills, cultural effects on skills applications, recognition of good and bad skills applications, recognition of how skills application changes subtly in different situations, and individual goals and techniques for improving skills. Discussion: This mentoring program provides an additional means of transferring SFRM knowledge compared to traditional CRM training programs. Our future endeavors in training SFRM skills (as well as other organization s) may benefit from adding team performance skills mentoring. This paper explains our mentoring approach and discusses its effectiveness and future applicability in promoting SFRM/CRM skills.

Huning, Therese↗

Inductive System Monitors Tasks

The Inductive Monitoring System (IMS) software developed at Ames Research Center uses artificial intelligence and data mining techniques to build system-monitoring knowledge bases from archived or simulated sensor data. This information is then used to detect unusual or anomalous behavior that may indicate an impending system failure. Currently helping analyze data from systems that help fly and maintain the space shuttle and the International Space Station (ISS), the IMS has also been employed by data classes are then used to build a monitoring knowledge base. In real time, IMS performs monitoring functions: determining and displaying the degree of deviation from nominal performance. IMS trend analyses can detect conditions that may indicate a failure or required system maintenance. The development of IMS was motivated by the difficulty of producing detailed diagnostic models of some system components due to complexity or unavailability of design information. Successful applications have ranged from real-time monitoring of aircraft engine and control systems to anomaly detection in space shuttle and ISS data. IMS was used on shuttle missions STS-121, STS-115, and STS-116 to search the Wing Leading Edge Impact Detection System (WLEIDS) data for signs of possible damaging impacts during launch. It independently verified findings of the WLEIDS Mission Evaluation Room (MER) analysts and indicated additional points of interest that were subsequently investigated by the MER team. In support of the Exploration Systems Mission Directorate, IMS is being deployed as an anomaly detection tool on ISS mission control consoles in the Johnson Space Center Mission Operations Directorate. IMS has been trained to detect faults in the ISS Control Moment Gyroscope (CMG) systems. In laboratory tests, it has already detected several minor anomalies in real-time CMG data. When tested on archived data, IMS was able to detect precursors of the CMG1 failure nearly 15 hours in advance of the actual failure event. In the Aeronautics Research Mission Directorate, IMS successfully performed real-time engine health analysis. IMS was able to detect simulated failures and actual engine anomalies in an F/A-18 aircraft during the course of 25 test flights. IMS is also being used in colla

Source record↗

General Mission Analysis Tool (GMAT) Architectural Specification. Draft

Early in 2002, Goddard Space Flight Center (GSFC) began to identify requirements for the flight dynamics software needed to fly upcoming missions that use formations of spacecraft to collect data. These requirements ranged from low level modeling features to large scale interoperability requirements. In 2003 we began work on a system designed to meet these requirement; this system is GMAT. The General Mission Analysis Tool (GMAT) is a general purpose flight dynamics modeling tool built on open source principles. The GMAT code is written in C++, and uses modern C++ constructs extensively. GMAT can be run through either a fully functional Graphical User Interface (GUI) or as a command line program with minimal user feedback. The system is built and runs on Microsoft Windows, Linux, and Macintosh OS X platforms. The GMAT GUI is written using wxWidgets, a cross platform library of components that streamlines the development and extension of the user interface Flight dynamics modeling is performed in GMAT by building components that represent the players in the analysis problem that is being modeled. These components interact through the sequential execution of instructions, embodied in the GMAT Mission Sequence. A typical Mission Sequence will model the trajectories of a set of spacecraft evolving over time, calculating relevant parameters during this propagation, and maneuvering individual spacecraft to maintain a set of mission constraints as established by the mission analyst. All of the elements used in GMAT for mission analysis can be viewed in the GMAT GUI or through a custom scripting language. Analysis problems modeled in GMAT are saved as script files, and these files can be read into GMAT. When a script is read into the GMAT GUI, the corresponding user interface elements are constructed in the GMAT GUI. The GMAT system was developed from the ground up to run in a platform agnostic environment. The source code compiles on numerous different platforms, and is regularly exercised running on Windows, Linux and Macintosh computers by the development and analysis teams working on the project. The system can be run using either a graphical user interface, written using the open source wxWidgets framework, or from a text console. The GMAT source code was written using open source tools. GSFC has released the code using the NASA open source license.

Hughes, Steven P.↗