Search NASA⌕ Search

SEARCH · Search NASA

Results for “RENEWABLE SYSTEMS INTERCONNECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Cross-Border Electricity Trade between India and Sri Lanka: Impact on Power System Operations

Recent developments in South Asia have the potential to increase the incentives for cross-border energy trade (CBET) between India and Sri Lanka. India's surplus power, including from its rapid expansion of wind and solar generation, provides an incentive for it to increase investment returns through exports. Sri Lanka is considering options to increase its power supply, and CBET could alleviate the need for investments in new thermal generation capacity, while giving it access to India's large and diverse power system. Finally, CBET can facilitate renewable energy (RE) integration by allowing the two countries to more efficiently harness balancing resources and smooth out wind and solar variability over larger geographic areas. This study builds on several prior analyses of a potential high-voltage direct current transmission link between India and Sri Lanka. Uniquely, the study makes use of a detailed one-year, 30-minute resolution unit commitment and economic dispatch (UC&ED) model of both countries to examine the technical and economic impacts of CBET between India and Sri Lanka in the year 2025. The study finds that CBET, enabled by a 500-MW high voltage direct current transmission link, could generate annual production cost savings of USD 180 million and improve power system operations. Through better utilization of the most efficient generators, generation from relatively expensive natural gas plants in Sri Lanka is displaced by lower cost imports from India. In addition, increased flexibility through exports reduces RE curtailment in India's Southern region by 400 GWh annually. While the study captures many previously unconsidered intertemporal operational constraints, it does not provide a complete characterization of system operations with a high-voltage direct current interconnection. Additional work should include a dynamic analysis of system stability following interruptions to the direct current interconnection, an AC power flow analysis and consideration of any non-technical barriers to trade which might prevent the optimization of CBET between India and Sri Lanka at 30-minute timescales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Resilient, Rural, and Revolutionary: Salisbury Square's Direct-Current Affordable Microgrid Community: Preprint

The technology to interconnect buildings with a dedicated direct-current (DC) power distribution network is in place today; what is missing is a turnkey approach to designing a DC microgrid - and the business models allowing such systems to be deployed, owned, and operated at scale. To close this gap, the Salisbury Square Development Team, comprising clean-energy experts, has engineered a resilient community DC microgrid for an affordable housing community in Randolph, Vermont. Ten single-family, occupant-owned residences and 12 multifamily rental units will share locally generated and stored solar energy via a DC power distribution bus capable of operating during extended grid outages. With a DC power distribution network in place, each home will be equipped with high-efficiency DC lighting and appliances, operating alongside alternating current (AC) appliances, even during an islanded mode of operation. To obtain a comprehensive understanding of what is possible and achievable, the Team collaborated with the local utility, regulatory agencies, a national laboratory, energy-as-service providers, and vendors. The collaborators evaluated microgrid typologies, business models, and energy modeling, and analyzed electrification and resilience. Further, the Team applied the URBANoptTM (Urban Renewable Building and Neighborhood optimization, NREL 2022) software development kit (SDK) to Salisbury Square's single-family and multifamily buildings to validate workflows and identify needs for advanced capability. This paper addresses the barriers to entry, scalability, and impact on residents and system ownership. It also examines the analysis that informed the design and engineering of the DC microgrid and the opportunities to streamline the process.

DER↗

Energy Systems Integration Facility (ESIF): World-Class Systems Integration Capabilities and Research

The Energy Systems Integration Facility (ESIF), located at the National Renewable Energy Laboratory (NREL) South Table Mountain campus, is a world-renowned user facility for research and development of modern, advanced, and clean energy technologies. ESIF is distinguished by its continuously evolving, highly integrated systems that span throughout the building, connecting research capabilities across multiple laboratories and test areas. The primary ESIF research systems include: [1] data, cyber, and control networks, [2] research electrical distribution buses (REDB), [3] thermal integration infrastructure, and [4] hydrogen systems. The data, cyber, and control networks provide monitoring, control, communication, automation, visualization, and time series data storage and tagging capabilities for research projects and ESIF systems, including facility safety functions. The REDB system consists of four dedicated AC and DC electrical power networks that can connect devices located across the facility through versatile, automatic circuit configuration to support complex power electronics experiments up to the megawatt-scale. The thermal integration infrastructure consists of three temperature-conditioned water loops that provide heating and cooling interfaces and capabilities for thermal energy research. The hydrogen systems provide megawatt-scale hydrogen production, drying, compression, high-pressure storage, and delivery to laboratory end uses, including hydrogen fuel cell vehicle fueling. The ESIF research systems interconnect and extend throughout the various lab areas of the facility to create elaborate networks composed of diverse technologies for cutting-edge research. The ESIF capabilities are operated and stewarded by the ESIF Research Operations group, who also actively upgrade and advance the systems to ensure they remain ahead of anticipated research - enabling the success of many pioneering energy integration projects. The poster, created by members of the ESIF Research Operations team, highlights and summarizes the four core integrated systems at ESIF. The poster was first presented at the internal NREL Energize Forum on May 13th, 2024, and received the "Best Poster" award.

capabilities↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Semiconductor Nanotechnology: Novel Materials and Devices for Electronics, Photonics, and Renewable Energy Applications

Electronic and photonic information technology and renewable energy alternatives, such as solar energy, fuel cells and batteries, have now reached an advanced stage in their development. Cost-effective improvements to current technological approaches have made great progress, but certain challenges remain. As feature sizes of the latest generations of electronic devices are approaching atomic dimensions, circuit speeds are now being limited by interconnect bottlenecks. This has prompted innovations such as the introduction of new materials into microelectronics manufacturing at an unprecedented rate and alternative technologies to silicon CMOS architectures. Despite the environmental impact of conventional fossil fuel consumption, the low cost of these energy sources has been a long-standing economic barrier to the development of alternative and more efficient renewable energy sources, fuel cells and batteries. In the face of mounting environmental concerns, interest in such alternative energy sources has grown. It is now widely accepted that nanotechnology offers potential solutions for securing future progress in information and energy technologies. The Canadian Semiconductor Technology Conference (CSTC) forum was established 25 years ago in Ottawa as an important symbol of the intrinsic strength of the Canadian semiconductor research and development community, and the Canadian semiconductor industry as a whole. In 2007, the 13th CSTC was held in Montreal, moving for the first time outside the national capital region. The first three meetings in the series of Nano and Giga Challenges in Electronics and Photonics NGCM2002 in Moscow, NGCM2004 in Krakow, and NGC2007 in Phoenix were focused on interdisciplinary research from the fundamentals of materials science to the development of new system architectures. In 2009 NGC2009 and the 14th Canadian Semiconductor Technology Conference (CSTC2009) were held as a joint event, hosted by McMaster University (10 14 August, Hamilton, Ontario, Canada) and the scope was expanded to include renewable energy research and development. This special issue of Nanotechnology is devoted to a better understanding of the function and design of semiconductor devices that are relevant to information technology (both electronics and photonics based) and renewable energy applications. The papers contained in this special issue are selected from the NGC/CSTC2009 symposium. Among them is a report by Ray LaPierre from McMaster University and colleagues at the University of Waterloo in Canada on the ability to manipulate single spins in nanowire quantum bits. The paper also reports the development of a testbed of a few qubits for general quantum information processing tasks [1]. Lower cost and greater energy conversion efficiency compared with thin film devices have led to a high level of activity in nanowire research related to photovoltaic applications. This special issue also contains results from an impedance spectroscopy study of core shell GaAs nanowires to throw light on the transport and recombination mechanisms relevant to solar cell research [2]. Information technology research and renewable energy sources are research areas of enormous public interest. This special issue addresses both theoretical and experimental achievements and provides a stimulating outlook for technological developments in these highly topical fields of research. References [1] Caram J, Sandoval C, Tirado M, Comedi D, Czaban J, Thompson D A and LaPierre R R 2010 Electrical characteristics of core shell p-n GaAs nanowire structures with Te as the n-dopant Nanotechnology 21 134007 [2] Baugh J, Fung J S and LaPierre R R 2010 Building a spin quantum bit register using semiconductor nanowires Nanotechnology 21 134018

14 SOLAR ENERGY↗

Statistical Analysis of Inter-Area Oscillations in the U.S. Eastern Interconnection: A 2017-2023 Perspective

Recent advancements and the accumulation of high-resolution, long-term phasor measurement unit (PMU) data have provided detailed insights into inter-area oscillations in power grids. This study conducts a comprehensive statistical analysis of inter-area oscillations within the United States Eastern Interconnection from 2017 to 2023. Utilizing data captured by the advanced wide-area Frequency Monitoring Network (FNET/GridEye), this investigation examines the occurrence patterns, dominant frequencies, damping ratios, and excitation mechanisms of these oscillations. Our analysis sheds light on the evolving statistical behaviors of inter-area oscillations, offering updated and critical information for grid operators and planners. The insights gained from this study can be instrumental in enhancing the operational resilience of the power network and guiding strategic developments in grid infrastructure to accommodate future challenges. Additionally, the study discusses emerging challenges associated with the modernization of the power grid, including increased renewable penetration, dynamic load variability, and cyber-physical vulnerabilities that complicate oscillation monitoring and control.

Inter-area oscillations↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Sustainable Port Operations: Powered by NREL

Seaports are vital economic hubs that allow the United States to compete on a global scale. But the heavy vehicles and cargo equipment that enable their operations also emit harmful air pollutants and greenhouse gas emissions. For nearly two decades, National Renewable Energy Laboratory (NREL) researchers have worked toward comprehensive seaport decarbonization. They fuse world-class analysis with deep vehicle and transportation systems knowledge to guide strategic deployment of low- and zero-emissions vehicles, charging and refueling infrastructure, and grid improvements. Together, these capabilities can enable sustainable port operations. This fact sheet outlines major seaport and airport decarbonization capabilities across the laboratory, including: fleet research, energy data, and insights for decarbonization; comprehensive hydrogen infrastructure deployment; optimized charging through grid integration; strategic blueprinting for clean, optimized technology deployment; and integrating diversity, equity, inclusion, and accessibility considerations into decarbonization efforts.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Method of Equivalencing for a Large Wind Power Plant with Multiple Turbine Representation

As the size and number of wind power plants (WPP) increases, power system planners will need to study their impact on the power system in more detail. As the level of wind power penetration into the grid increases, the transmission system integration requirements will become more critical. A very large WPP may contain hundreds of megawatt-size wind turbines. These turbines are interconnected by an intricate collector system. While the impact of individual turbines on the larger power system network is minimal, collectively, wind turbines can have a significant impact on the power systems during a severe disturbance such as a nearby fault. Since it is not practical to represent all individual wind turbines to conduct simulations, a simplified equivalent representation is required. This paper focuses on our effort to develop an equivalent representation of a WPP collector system for power system planning studies. The layout of the WPP, the size and type of conductors used, and the method of delivery (overhead or buried cables) all influence the performance of the collector system inside the WPP. Our effort to develop an equivalent representation of the collector system for WPPs is an attempt to simplify power system modeling for future developments or planned expansions of WPPs. Although we use a specific large WPP as a case study, the concept is applicable for any type of WPP.

17 WIND ENERGY↗

Adding power of artificial intelligence to situational awareness of large interconnections dominated by inverter‐based resources

Abstract Large‐scale power systems exhibit more complex dynamics due to the increasing integration of inverter‐based resources (IBRs). Therefore, there is an urgent need to enhance the situational awareness capability for better monitoring and control of power grids dominated by IBRs. As a pioneering Wide‐Area Measurement System, FNET/GridEye has developed and implemented various advanced applications based on the collected synchrophasor measurements to enhance the situational awareness capability of large‐scale power grids. This study provides an overview of the latest progress of FNET/GridEye. The sensors, communication, and data servers are upgraded to handle ultra‐high density synchrophasor and point‐on‐wave data to monitor system dynamics with more details. More importantly, several artificial intelligence (AI)‐based advanced applications are introduced, including AI‐based inertia estimation, AI‐based disturbance size and location estimation, AI‐based system stability assessment, and AI‐based data authentication.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Serially-Connected Compensator for Eliminating the Unbalanced Three-Phase Voltage Impact on Wind Turbine Generators

Untransposed transmission lines, unbalanced tap changer operations, and unbalanced loading in weak distribution lines can cause unbalanced-voltage conditions. The resulting unbalanced voltage at the point of interconnection affects proper gird integration and reduces the lifetime of wind turbines due to power oscillations, torque pulsations, mechanical stresses, energy losses, and uneven and overheating of the generator stator winding. This work investigates the dynamic impact of unbalanced voltage on the mechanical and electrical components of integrated Fatigue, Aerodynamics, Structures, and Turbulence (FAST) wind turbine generation systems (WTGs) of Type 1 (squirrel-cage induction generator) and Type 3 (doubly-fed induction generator). To alleviate this impact, a serially-connected compensator for a three-phase power line is proposed to balance the wind turbine-side voltage. Dynamic simulation studies are conducted in MATLAB/Simulink to compare the responses of these two types of wind turbine models under normal and unbalanced-voltage operation conditions and demonstrate the effectiveness of the proposed compensator.

17 WIND ENERGY↗

Using Energy Storage-Based Grid Forming Inverters for Operational Reserve in Hybrid Diesel Microgrids

In remote arctic communities, where access to a bulk electrical grid interconnection is not available, the implementation of islanded microgrids has been the most viable way to produce and distribute electricity services to their inhabitants. Historically, these islanded grids have relied primarily on diesel generators or hydropower resources to supply the baseload. However, this practice can result in increased expense due to the high costs associated with fuel transportation and the significant amounts of on-site storage necessary when fuel transportation is unavailable during winter months. In order to mitigate this problem, arctic microgrids have started to transition to a hybrid-source operational mode by incorporating renewable energy sources that are inherently variable in nature, such as wind or solar. Due to their highly stochastic behavior, these hybrid-source islanded microgrids can pose potential issues related to power quality due to introduction of rapid net load fluctuations and inability of diesel generators to respond rapidly. In addition, non-firm stochastic sources can require significant idling diesel generator resources to serve as spinning reserves, which is inefficient and wasteful. This work studies the problems that may arise in the transient dynamics of a real-world hybrid diesel microgrid when subjected to a loss of wind generation. Moreover, this work proposes a transition from a diesel spinning reserve to a battery energy-storage system (BESS) operating reserve scheme. The study of the proposed transition is important in establishing the fundamental implication of transient dynamics and the potential benefits of integrating a BESS as a spinning reserve in terms of stability, frequency nadir, and transient voltage deviation. The methods to investigate and validate the transient dynamics relied on both electromagnetic simulation models of GFMIs and a commercially available GFMI in an experimental power hardware-in-the-loop setup. The simulation results showed that the proposed operating reserve scheme improves the power quality of the system in terms of voltage deviation and frequency nadir when the microgrid is subjected to a loss of wind generation scenario. Depending on the simulation cases, adding a GFMI reduced the frequency nadir between 65.3% and 86.7%. Moreover, the reductions in the voltage deviations improved between 3.6% and 23.0%. From these results it can be concluded that the integration of a GFMI can reduce the frequency nadir in a hybrid diesel microgrid, and in turn, reduce diesel consumption, which improves system reliability while reducing fuel expenses. Furthermore, the novelty of this work relies on the fact that the offline simulation results were validated using a power hardware-in-the-loop platform that incorporated a 100 kVA commercially available GFMI as the device under test.

Hernandez-Alvidrez, Javier↗

Model-Based Integrated High Penetration Renewables Planning and Control Analysis

Increasing adoption of Solar Photovoltaic (PV) generation at the distribution level poses several changes for the reliable operation of electrical power distribution systems. The addition of a significant amount of PV to a distribution network can introduce a variety of operational problems, including steady-state overvoltages, reverse flows, voltage flicker and excessive controller movement among others. These adverse impacts can be mitigated through a variety of equipment upgrades which represent a cost to either the electric utility or the owner of the PV site. The study performed here aims to quantify the levels of PV generation which present operational problems on a distribution circuit and how those problems might be alleviated. The study performed here included 20 distribution feeders selected from Pepco Holdings, Inc. (PHI) service territory. These feeders are located in the states of Delaware, Maryland and New Jersey. A hosting capacity study was performed on each feeder to determine how much additional PV it could support in its current configuration. Several improvements were then performed on these circuits including phase balancing, capacitor redesign, reducing the voltage regulator set points, fixed power factor operation on the PV inverters and the installation of battery storage. After each of these improvements the hosting capacity of the circuit was reevaluated in order to determine how that particular improvement impacted the amount of PV that could be hosted by the circuit. Each of these improvements represents a real cost in terms of labor and equipment in order to be implemented. They are expected to provide a benefit in terms of the amount of additional PV generation which can be safely interconnected to the distribution feeder. A cost benefit analysis was performed in order to evaluate the expected costs of each feeder improvement and how each one was able to increase the PV hosting capacity of each feeder. It is hoped that these results can be utilized by other distribution utilities in order to understand how they can improve the hosting capacity of their feeders and facilitate the deployment of more PV generation at the distribution level. Admittedly other utility companies will most likely have different feeder architectures and differing labor and equipment costs so the realized cost benefit numbers may be significantly different.

14 SOLAR ENERGY↗

Opportunities for Hybrid Wind and Solar PV Plants in India

The share of variable renewable energy (VRE) on India's grid has surpassed 100 GW, and the government has ambitious plans reach 450 GW by 2030. One strategy to increase wind and solar PV deployment is through the co-location of wind and solar PV plants to form a single hybrid power plant. Hybrid plants have the potential to reduce transmission infrastructure costs and variability in the output power profile compared to a standalone plant with a single technology, and this resource analysis aims to take a first step towards quantifying the potential savings from hybridizing wind and solar PV plants in India and the size of this opportunity. We utilize a brute-force optimization to minimize the levelized cost of energy (LCOE) for standalone wind, standalone solar PV, and hybrid wind/solar PV plants across all of India. By comparing these LCOEs, we determine that locations where hybrid plants exhibit potential cost savings and grid benefits exhibit both; a high interconnection cost and; a wind capacity factor between roughly 34% and 38%. However, because our work does not capture the value of the electricity generated by looking at energy prices, nor does it quantify the potential of hybrids to provide other value streams such as firm capacity and reserves. Further, because the work does not compare solar PV and wind hybrids to alternative generation technologies or storage systems, it cannot be considered a holistic cost-benefit analysis.

14 SOLAR ENERGY↗

Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Hydrogen Production Feasibility for a Light Water Reactor in the Midwest

Increased electricity production from renewable energy resources coupled with low natural gas prices has caused existing light-water reactor (LWRs) to experience ever diminishing returns from the electricity market. Via partnership among Idaho National Laboratory (INL), The National Renewable Energy Laboratory (NREL), Argonne National Laboratory (ANL), Exelon, and Fuel Cell Energy a techno-economic analysis on the viability of retrofitting existing pressurized water reactors (PWRs) to produce hydrogen (H2) via high temperature steam electrolysis (HTSE) has been conducted. Such integration would allow nuclear facilities to expand into additional markets that may be more profitable in the long-term. To accommodate such an integration, a detailed analysis of HTSE process operation, requirements, and flexibility was conducted. Technical analysis includes proposed nuclear system control scheme modifications to allow dynamic operation of the HTSE via both thermal and electrical connection to the nuclear plant. High fidelity Modelica simulations showcase the viability of such control schemes. However, due to limited knowledge of solid oxide fuel cell (SOFC) stack degradation due to thermal gradients; thermal cycling of the HTSE was not included. Therefore, the control schemes proposed are only utilized to re-distribute steam at startup and only the portion of electricity utilized in the electrolyzers is cycled. From the detailed analysis of the nuclear integration and the HTSE process design, a comprehensive cost estimation was conducted in the APEA and H2A models to elucidate capital and operational costs associated with the production, compression, and distribution of hydrogen from a nuclear facility. Alongside this costing analysis, market analyses were conducted by NREL and ANL on the electric and hydrogen markets respectively in the PJM interconnect. Utilizing the electricity data market projections in the PJM interconnect from NREL and hydrogen demand/pricing projections from ANL a five variable sweep over component capacities, discount rates, and hydrogen pricing was completed using the stochastic framework RAVEN (Risk Analysis Virtual ENVironment) through its resource dispatch plugin HERON (Heuristic Energy Resource Optimization Network). Each combination of variables was evaluated stochastically four times over a seventeen year timespan from 2026-2042 (inclusive) to determine the most economically advantageous solution. Following the five variable sweep an optimization was conducted about the best sweep point to determine optimal component sizing and setpoints. Results suggest positive gain is achievable at all projected hydrogen market pricing levels and at all discount rates. However, exact component sizing and net returns vary based on these values and if incorrect sizing is selected; major net losses can occur. The optimal result occurred with set points as follows: high hydrogen prices, the largest possible HTSE unit in the sweep set at 7.47 kg/sec [645.4 tpd], a contractual hydrogen market agreement 7.29 kg/sec [629.8 tpd], and a hydrogen storage size 115,188 kg. The analysis suggested that with a discount rate of 8%, a ΔNPV = 1.2 billion over the seventeen year span can be achieved. The results illuminate that by operating in multiple markets the nuclear facility is capable of avoiding sale of electricity during times of low electricity market pricing, while maintaining the ability to capitalize on the high electricity market pricing. It should be noted that the analysis conducted in this report is a differential cash flow analysis and as such does not present profit levels. Instead it highlights the net benefit between building and competing in the hydrogen market utilizing nuclear facilities and conducting business as usual in the electricity markets. Additionally, results presented in this report exhibit conservatism due to four key assumptions: Given the limited knowledge on SOFC stack degradation due to thermal gradients the high temperature steam electrolysis plant is not allowed to thermally cycle. This limitation decreases electricity generation capacity in the nuclear plant, reducing capacity payments and the maximum output to the electrical grid. This analysis considers building a separate hydrogen pipeline for use in the nuclear facility. Research is currently being conducted to determine if existing natural gas pipelines can accommodate direct hydrogen injection. If hydrogen can be integrated into existing natural gas pipelines then a capital savings of ~$19,000,000 per kg/sec [1 kg/sec = 86.4 tpd] of installed HTSE capacity could be realized. Fast transients in the electric grid are typically served by flywheels and electric batteries. With electrolysis only operation the nuclear plant can flex its electricity just as quickly. However, for this analysis, the ancillary services market has been neglected. Should the nuclear plant have the ability to operate in the ancillary services market during periods when it is producing hydrogen, an additional substantial income stream that would increase overall system profitability could be considered. Subsidies for non-emitting generation technologies are not introduced in the cash flow analysis, but instead are completed assuming zero subsidies. Profitability is based solely on electricity pricing. Electric pricing is assumed to never go negative. Instead, it is assumed overall system curtailment by the Independent System Operator (ISO) will occur in such a manner that pricing remains at or above zero. This assumption inflates the “business as usual” scenario, thus decreasing the ΔNPV calculated. If negative pricing scenarios continue to occur as they do today, one would expect a further increase in ΔNPV. Overall, results advocate that, through market diversification, nuclear power plants have the potential to substantially increase current profit margins, increase market penetration, and ultimately solidify their place as a mainstay in energy production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗